View Permit Status

The information below summarizes the Permit Number you selected.

Permit Number:  BLD2018-04751     Status:   Finaled     Map Info:   1515 S HARBOR BLVD 751
Name:  WALT DISNEY WORLD CO
Address: 1515 S HARBOR 751
Received Date: 10/22/2018 
Parcel: 08219027 
Plan Check Date:  
Issue Date: 01/17/2019 
Expiration Date: 04/22/2021 
Finaled Date: 12/01/2020 
Description: DCA - Golden State Expansion / Pkg 2 - Non Residential Addition: Addition to core and shell of 17,604 s.ft to create a pit level, extend first floor and second floor with new mezzanie, catwalk, and roof top equipment rooms for future tenant. Canopy 2,224 sq.ft over queue and maintanance bay entry. 

Activities
Type  Requested  Scheduled  Time of Inspection  Completed  Disposition  Employee 
Route to Traffic Engineering  10/22/2018  11/6/2018    11/5/2018  APPR  RXC 
Approved by Traffic Eng.  10/22/2018      11/5/2018 4:24:53 PM  APPR  RXC 
Route to PW Develop. Services  10/22/2018  11/6/2018    11/9/2018  CORR  SXA 
Apprv. by PW Develop. Services  10/22/2018      1/16/2019 10:55:08 AM  APPR  SXA 
Route to Fire Department  10/22/2018  11/6/2018    11/9/2018  APPR  EPO 
Approved by Fire Department  10/22/2018      11/9/2018 11:05:37 AM  APPR  EPO 
Route to Elec Engineering  10/22/2018  11/6/2018    11/2/2018  APPR  JJB 
Approved by Elec Engineering  10/22/2018      11/2/2018 9:12:21 AM  APPR  JJB 
Route to Struct/Architectual  10/22/2018  11/6/2018    11/6/2018  CORR  ITW 
Apprv. by Struct/Architectural  10/22/2018      12/17/2018 7:01:43 PM  APPR  ITW 
Route to Planning Zoning  10/22/2018  11/6/2018    11/13/2018  CORR  EYT 
Approved by Planning Zoning  10/22/2018      11/26/2018 9:12:26 AM  APPR  EYT 
Route to Water Engineering  10/22/2018  11/6/2018    11/7/2018  APPR  DRS 
Approved by Water Engineering  10/22/2018      11/7/2018 8:51:32 AM  APPR  DRS 
Approved: School Fees Due  10/22/2018      1/17/2019  APPR  CMN 
Route to Electrical  10/22/2018  11/6/2018    10/31/2018  APPR  MCS 
Approved by Electrical  10/22/2018      10/31/2018 7:23:20 AM  APPR  MCS 
Approved by Mechanical  10/22/2018      11/6/2018  APPR  GAQ 
Route to Mechanical  10/22/2018  11/6/2018    11/6/2018  APPR  GAQ 
Approved by Plumbing  10/22/2018      11/6/2018  APPR  GAQ 
Route to Plumbing  10/22/2018  11/6/2018    11/6/2018  APPR  GAQ 
Route to Planning Zoning  11/20/2018  12/10/2018    11/26/2018  APPR  EYT 
Route to Struct/Architectual  11/20/2018  12/10/2018    12/10/2018  CORR  ITW 
Route to PW Develop. Services  11/20/2018  12/11/2018    12/17/2018  CORR  SXA 
Route to PW Develop. Services  12/17/2018  1/4/2019    1/4/2019  APPR  SXA 
Route to Struct/Architectual  12/17/2018  1/4/2019    12/17/2018  APPR  ITW 
Approved by Bus Lic (Sub List)  1/17/2019  11/20/2020    11/20/2020  APPR  RHZ 
BLD - Reinforcing Insp  1/22/2019 1:13:01 PM  1/23/2019  10 AM - 2 PM  1/23/2019  BEN 
BLD - Reinforcing Insp  1/31/2019 3:36:12 PM  2/1/2019  10 AM - 2 PM  2/1/2019  BEN 
Route to Planning Zoning  2/4/2019  2/21/2019    2/21/2019  APPR  EYT 
Approved by Elec Engineering  2/4/2019      2/7/2019 9:03:34 AM  APPR  JMC 
Route to Elec Engineering  2/4/2019  2/21/2019    2/7/2019  APPR  JMC 
Approved by Fire Department  2/4/2019      2/22/2019 2:53:30 PM  APPR  EPO 
Route to Fire Department  2/4/2019  2/21/2019    2/22/2019  APPR  EPO 
Route to PW Develop. Services  2/4/2019  2/21/2019    2/27/2019  APPR  SXA 
Approved Revision Structural  2/4/2019      2/21/2019  DONE  ITW 
Route Revision Structural  2/4/2019  2/21/2019    2/21/2019  APPR  ITW 
Route to Traffic Engineering  2/4/2019  2/21/2019    2/26/2019  NR  RXC 
Approved by Traffic Eng.  2/4/2019      2/26/2019 2:10:23 PM  NR  RXC 
Approved Revision Electrical  2/4/2019      2/22/2019  APPR  MCS 
Route Revision Electrical  2/4/2019  2/21/2019    2/22/2019  APPR  MCS 
Approved Revision Mechanical        2/20/2019  NR  GAQ 
Route Revision Mechanical  2/4/2019  2/21/2019    2/20/2019  NR  GAQ 
Approved Revision Plumbing        2/20/2019  NR  GAQ 
Route Revision Plumbing  2/4/2019  2/21/2019    2/20/2019  NR  GAQ 
Apprv. by PW Develop. Services  2/4/2019      2/27/2019 4:22:37 PM  APPR  SXA 
Approved by Planning Zoning  2/4/2019      2/21/2019 12:19:53 PM  APPR  EYT 
Route to Water Engineering  2/4/2019  2/21/2019    2/21/2019  APPR  DRS 
Approved by Water Engineering  2/4/2019      2/21/2019 3:04:12 PM  APPR  DRS 
BLD - Reinforcing Insp  2/11/2019 4:52:40 PM  2/12/2019  10 AM - 2 PM  2/12/2019  DOM 
BLD - Reinforcing Insp  2/14/2019 12:44:23 PM  2/15/2019  10 AM - 2 PM  2/15/2019  BEN 
BLD - Reinforcing Insp  2/18/2019 10:08:11 AM  2/19/2019  8 AM - 12 PM  2/19/2019  PJJ 
BLD - Reinforcing Insp  2/19/2019 5:51:38 PM  2/20/2019  8 AM - 12 PM  2/20/2019  PJJ 
BLD - Reinforcing Insp  2/21/2019 3:53:21 PM  2/22/2019  8 AM - 12 PM  2/22/2019  BEN 
BLD - Reinforcing Insp  2/24/2019 3:17:58 PM  2/25/2019  8 AM - 12 PM  2/25/2019  PJJ 
BLD - Reinforcing Insp  2/25/2019 2:30:40 PM  2/26/2019  10 AM - 2 PM  2/26/2019  BEN 
BLD - Reinforcing Insp  2/26/2019 8:10:07 PM  2/27/2019  10 AM - 2 PM  2/27/2019  BEN 
BLD - Reinforcing Insp  2/27/2019 4:16:17 PM  2/28/2019  10 AM - 2 PM  2/28/2019  BEN 
BLD - Reinforcing Insp  2/28/2019 4:03:40 PM  3/1/2019    3/1/2019  BEN 
BLD - Reinforcing Insp  3/3/2019 8:20:40 AM  3/4/2019  10 AM - 2 PM  3/4/2019  PJJ 
BLD - Reinforcing Insp  3/4/2019 5:04:31 PM  3/5/2019  10 AM - 2 PM  3/5/2019  BEN 
BLD - Reinforcing Insp  3/5/2019 5:30:02 PM  3/6/2019  10 AM - 2 PM  3/6/2019  BEN 
BLD - Reinforcing Insp  3/6/2019 4:21:26 PM  3/7/2019  10 AM - 2 PM  3/7/2019  BEN 
BLD - Reinforcing Insp  3/7/2019 4:12:30 PM  3/8/2019  10 AM - 2 PM  3/8/2019  BEN 
BLD - Reinforcing Insp  3/8/2019  3/11/2019    3/12/2019  BEN 
BLD - Footings Insp  3/10/2019 8:01:47 PM  3/11/2019    3/11/2019  PJJ 
BLD - Reinforcing Insp  3/11/2019 3:09:53 PM  3/12/2019  10 AM - 2 PM  3/12/2019  BEN 
BLD - Reinforcing Insp  3/13/2019 3:51:27 PM  3/14/2019  10 AM - 2 PM  3/14/2019  BEN 
BLD - Reinforcing Insp  3/14/2019 5:20:39 PM  3/15/2019  10 AM - 2 PM  3/15/2019  BEN 
BLD - Reinforcing Insp  3/15/2019  3/16/2019    3/19/2019  BEN 
BLD - Reinforcing Insp  3/17/2019 4:33:07 PM  3/18/2019  10 AM - 2 PM  3/18/2019  PJJ 
BLD - Reinforcing Insp  3/18/2019 5:44:09 PM  3/19/2019  10 AM - 2 PM  3/19/2019  BEN 
BLD - Reinforcing Insp  3/19/2019 5:19:13 PM  3/20/2019    3/20/2019  BEN 
BLD - Reinforcing Insp  3/20/2019 4:24:10 PM  3/21/2019    3/21/2019  BEN 
BLD - Reinforcing Insp  3/21/2019 4:12:27 PM  3/22/2019    3/22/2019  BEN 
Approved Revision Electrical  3/21/2019      3/21/2019  DONE  CMN 
Route Revision Electrical  3/21/2019  4/8/2019    3/21/2019  APPR  MCS 
BLD - Reinforcing Insp  3/22/2019  3/25/2019    3/26/2019  BEN 
BLD - Reinforcing Insp  3/25/2019 4:57:44 PM  3/26/2019    3/27/2019  BEN 
BLD - Reinforcing Insp  3/26/2019 7:28:04 PM  3/27/2019  10 AM - 2 PM  3/27/2019  BEN 
BLD - Reinforcing Insp  3/27/2019 4:46:01 PM  3/28/2019  10 AM - 2 PM  3/28/2019  PJJ 
BLD - Reinforcing Insp  3/28/2019 3:19:49 PM  3/29/2019    3/29/2019  BEN 
BLD - Footings Insp  3/29/2019  4/1/2019    4/2/2019  BEN 
Route Revision Structural  4/1/2019  4/17/2019    4/8/2019  CORR  CMN 
Approved Revision Structural  4/1/2019      4/10/2019  APPR  ITW 
BLD - Reinforcing Insp  4/2/2019 3:30:51 PM  4/3/2019    4/3/2019  BEN 
BLD - Footings Insp  4/3/2019  4/4/2019    4/4/2019  PJJ 
BLD - Reinforcing Insp  4/4/2019 4:07:21 PM  4/5/2019  10 AM - 2 PM  4/5/2019  PJJ 
BLD - Reinforcing Insp  4/5/2019  4/6/2019  8 AM - 12 PM  4/8/2019  PJJ 
Route Revision Structural  4/8/2019  4/24/2019    4/10/2019  APPR  ITW 
BLD - Reinforcing Insp  4/9/2019 7:58:59 PM  4/10/2019    4/10/2019  BEN 
BLD - Reinforcing Insp  4/10/2019 8:03:37 PM  4/11/2019    4/11/2019  BEN 
BLD - Reinforcing Insp  4/12/2019 12:39:31 PM  4/15/2019  10 AM - 2 PM  4/15/2019  PJJ 
BLD - Reinforcing Insp  4/19/2019 10:04:58 PM  4/22/2019  8 AM - 12 PM  4/22/2019  PJJ 
BLD - Reinforcing Insp  4/22/2019 4:39:51 PM  4/23/2019    4/23/2019  BEN 
BLD - Reinforcing Insp  4/23/2019 6:45:23 PM  4/24/2019  10 AM - 2 PM  4/24/2019  BEN 
BLD - Reinforcing Insp  4/24/2019 3:49:24 PM  4/25/2019    4/25/2019  BEN 
BLD - Reinforcing Insp  4/25/2019 3:49:22 PM  4/26/2019    4/26/2019  DOM 
BLD - Reinforcing Insp  4/26/2019 6:04:10 PM  4/29/2019  10 AM - 2 PM  4/29/2019  PJJ 
BLD - Reinforcing Insp  4/29/2019 6:37:13 PM  4/30/2019    4/30/2019  BEN 
BLD - Reinforcing Insp  4/30/2019  5/1/2019    5/1/2019  PJJ 
BLD - Framing Insp.  4/30/2019 4:06:04 PM  5/1/2019  8 AM - 12 PM  5/1/2019  BEN 
BLD - Reinforcing Insp  5/1/2019 1:26:28 PM  5/2/2019    5/2/2019  BEN 
BLD - Reinforcing Insp  5/2/2019 3:15:42 PM  5/3/2019  8 AM - 12 PM  5/3/2019  BEN 
BLD - Reinforcing Insp  5/3/2019 1:51:38 PM  5/6/2019  10 AM - 2 PM  5/6/2019  PJJ 
BLD - Framing Insp.  5/6/2019 6:39:28 PM  5/7/2019  10 AM - 2 PM  5/7/2019  PJJ 
BLD - Reinforcing Insp  5/8/2019 7:49:16 PM  5/9/2019  10 AM - 2 PM  5/9/2019  BEN 
BLD - Reinforcing Insp  5/12/2019 7:36:51 PM  5/13/2019  8 AM - 12 PM  5/13/2019  PJJ 
BLD - Reinforcing Insp  5/14/2019 4:34:43 PM  5/15/2019    5/15/2019  BEN 
BLD - Reinforcing Insp  5/16/2019 4:04:34 AM  5/17/2019    5/17/2019  BEN 
BLD - Pre-Slab Insp  5/16/2019 8:11:46 PM  5/17/2019    5/17/2019  BEN 
BLD - Reinforcing Insp  5/17/2019  5/18/2019    5/21/2019  BEN 
BLD - Reinforcing Insp  5/20/2019 4:39:48 PM  5/21/2019  12 PM - 3 PM  5/21/2019  BEN 
BLD - Reinforcing Insp  5/21/2019 3:54:21 PM  5/22/2019  10 AM - 2 PM  5/22/2019  BEN 
BLD - Reinforcing Insp  5/22/2019 5:29:37 PM  5/23/2019    5/23/2019  BEN 
BLD - Reinforcing Insp  5/23/2019 6:28:39 PM  5/24/2019  12 PM - 3 PM  5/24/2019  BEN 
BLD - Reinforcing Insp  5/28/2019 2:22:44 PM  5/29/2019  10 AM - 2 PM  5/29/2019  BEN 
BLD - Framing Insp.  5/28/2019 2:24:02 PM  5/29/2019  10 AM - 2 PM  5/29/2019  BEN 
BLD - Reinforcing Insp  5/29/2019 3:19:21 PM  5/30/2019  10 AM - 2 PM  5/30/2019  PJJ 
BLD - Reinforcing Insp  5/30/2019 4:29:41 PM  5/31/2019    5/31/2019  BEN 
BLD - Reinforcing Insp  6/4/2019 4:11:06 PM  6/5/2019  12 PM - 3 PM  6/5/2019  BEN 
BLD - Reinforcing Insp  6/6/2019 3:54:51 PM  6/7/2019  10 AM - 2 PM  6/7/2019  BEN 
Route to Struct/Architectual  6/12/2019  6/28/2019    7/1/2019  CORR  ITW 
Route to Struct/Architectual  6/12/2019  6/28/2019    6/28/2019  CORR  ITW 
Route to Struct/Architectual  6/19/2019  7/8/2019    7/8/2019  APPR  ITW 
Apprv. by Struct/Architectural  6/19/2019      7/8/2019  APPR  ITW 
BLD - Framing Insp.  6/22/2019 10:58:59 AM  6/24/2019  10 AM - 2 PM  6/24/2019  PJJ 
BLD - Reinforcing Insp  6/25/2019 3:26:12 PM  6/26/2019  12 PM - 3 PM  6/26/2019  BEN 
Approved Revision Structural  6/27/2019      7/16/2019  APPR  ITW 
Route Revision Structural  6/27/2019  7/16/2019    7/15/2019  APPR  ITW 
BLD - Reinforcing Insp  7/1/2019  7/2/2019  8 AM - 12 PM  7/2/2019  BEN 
BLD - Pre-Slab Insp  7/1/2019 6:13:01 PM  7/2/2019  8 AM - 12 PM  7/2/2019  BEN 
BLD - Reinforcing Insp  7/8/2019 3:29:59 PM  7/9/2019    7/9/2019  BEN 
BLD - Footings Insp  7/9/2019 4:30:15 PM  7/10/2019  8 AM - 12 PM  7/10/2019  BEN 
BLD - Reinforcing Insp  7/11/2019 3:39:27 PM  7/12/2019    7/12/2019  BEN 
BLD - Framing Insp.  7/15/2019 3:13:59 PM  7/16/2019  10 AM - 2 PM  7/16/2019  BEN 
BLD - Reinforcing Insp  7/15/2019 4:24:29 PM  7/16/2019  10 AM - 2 PM  7/16/2019  BEN 
BLD - Framing Insp.  7/16/2019 4:51:53 PM  7/17/2019  12 PM - 3 PM  7/17/2019  BEN 
BLD - Reinforcing Insp  7/16/2019 4:52:55 PM  7/17/2019  12 PM - 3 PM  7/17/2019  BEN 
BLD - Reinforcing Insp  7/17/2019 3:41:32 PM  7/18/2019  12 PM - 3 PM  7/18/2019  BEN 
BLD - Framing Insp.  7/17/2019 3:42:08 PM  7/18/2019  12 PM - 3 PM  7/18/2019  BEN 
BLD - Reinforcing Insp  7/25/2019 3:31:50 PM  7/26/2019    7/26/2019  BEN 
BLD - Framing Insp.  7/25/2019 3:33:59 PM  7/26/2019    7/26/2019  BEN 
BLD - Reinforcing Insp  7/28/2019 2:01:17 PM  7/29/2019  10 AM - 2 PM  7/29/2019  PJJ 
BLD - Framing Insp.  7/29/2019 2:49:17 PM  7/30/2019    7/30/2019  BEN 
BLD - Reinforcing Insp  7/29/2019 2:51:44 PM  7/30/2019    7/30/2019  BEN 
BLD - Reinforcing Insp  7/30/2019  7/31/2019    7/30/2019  BEN 
BLD - Reinforcing Insp  7/30/2019 4:51:26 PM  7/31/2019    7/31/2019  BEN 
BLD - Framing Insp.  7/30/2019 4:52:00 PM  7/31/2019    7/31/2019  BEN 
BLD - Reinforcing Insp  7/31/2019 5:14:31 PM  8/1/2019    8/1/2019  BEN 
BLD - Framing Insp.  7/31/2019 5:14:51 PM  8/1/2019    8/1/2019  BEN 
BLD - Framing Insp.  8/1/2019 5:53:07 PM  8/2/2019    8/2/2019  BEN 
BLD - Reinforcing Insp  8/1/2019 5:54:17 PM  8/2/2019    8/2/2019  BEN 
BLD - Reinforcing Insp  8/3/2019 3:17:33 PM  8/5/2019  10 AM - 2 PM  8/5/2019  PJJ 
BLD - Framing Insp.  8/3/2019 3:18:19 PM  8/5/2019  10 AM - 2 PM  8/5/2019  PJJ 
BLD - Drywall Inspection  8/3/2019 3:20:10 PM  8/5/2019  10 AM - 2 PM  8/5/2019  PJJ 
BLD - Framing Insp.  8/5/2019 5:09:06 PM  8/6/2019  8 AM - 12 PM  8/6/2019  PJJ 
BLD - Reinforcing Insp  8/5/2019 5:10:24 PM  8/6/2019  8 AM - 12 PM  8/6/2019  PJJ 
BLD - Framing Insp.  8/6/2019 5:37:10 PM  8/7/2019  8 AM - 12 PM  8/7/2019  BEN 
BLD - Framing Insp.  8/7/2019 5:03:53 PM  8/8/2019    8/8/2019  BEN 
BLD - Reinforcing Insp  8/8/2019 5:31:18 PM  8/9/2019  10 AM - 2 PM  8/9/2019  BEN 
BLD - Reinforcing Insp  8/9/2019 2:51:55 PM  8/12/2019  10 AM - 2 PM  8/12/2019  PJJ 
BLD - Framing Insp.  8/9/2019 2:56:18 PM  8/12/2019  10 AM - 2 PM  8/12/2019  PJJ 
BLD - Reinforcing Insp  8/13/2019 3:29:52 PM  8/14/2019    8/14/2019  BEN 
BLD - Drywall Inspection  8/13/2019 3:32:37 PM  8/14/2019    8/14/2019  BEN 
BLD - Framing Insp.  8/13/2019 3:33:47 PM  8/14/2019    8/14/2019  BEN 
BLD - Framing Insp.  8/14/2019 4:02:00 PM  8/15/2019  12 PM - 3 PM  8/15/2019  BEN 
BLD - Exterior Lath Insp  8/14/2019 4:10:16 PM  8/15/2019  12 PM - 3 PM  8/15/2019  BEN 
BLD - Framing Insp.  8/15/2019 4:38:14 PM  8/16/2019    8/16/2019  BEN 
BLD - Drywall Inspection  8/15/2019 4:38:52 PM  8/16/2019    8/16/2019  BEN 
BLD - Drywall Inspection  8/18/2019 6:49:50 PM  8/19/2019  10 AM - 2 PM  8/19/2019  PJJ 
BLD - Insulation Insp  8/18/2019 6:52:43 PM  8/19/2019  10 AM - 2 PM  8/19/2019  PJJ 
BLD - Insulation Insp  8/19/2019 2:13:42 PM  8/20/2019  12 PM - 3 PM  8/20/2019  BEN 
BLD - Framing Insp.  8/19/2019 2:14:24 PM  8/20/2019  12 PM - 3 PM  8/20/2019  BEN 
BLD - Framing Insp.  8/20/2019 3:42:37 PM  8/21/2019    8/21/2019  BEN 
BLD - Drywall Inspection  8/20/2019 3:42:54 PM  8/21/2019    8/21/2019  BEN 
BLD - Drywall Inspection  8/22/2019 3:20:00 PM  8/23/2019  12 PM - 3 PM  8/23/2019  BEN 
BLD - Drywall Inspection  8/25/2019 5:35:06 PM  8/26/2019  10 AM - 2 PM  8/26/2019  PJJ 
BLD - Framing Insp.  8/25/2019 5:35:40 PM  8/26/2019  10 AM - 2 PM  8/26/2019  PJJ 
BLD - Framing Insp.  8/26/2019 3:10:20 PM  8/27/2019  10 AM - 2 PM  8/27/2019  PJJ 
BLD - Drywall Inspection  8/26/2019 3:11:15 PM  8/27/2019  10 AM - 2 PM  8/27/2019  PJJ 
BLD - Framing Insp.  8/27/2019 3:41:53 PM  8/28/2019    8/28/2019  BEN 
BLD - Framing Insp.  8/29/2019 5:08:37 PM  8/30/2019    8/30/2019  BEN 
BLD - Drywall Inspection  8/29/2019 5:08:50 PM  8/30/2019    8/30/2019  BEN 
BLD - Exterior Lath Insp  8/29/2019 6:24:43 PM  8/30/2019    8/30/2019  BEN 
BLD - Exterior Lath Insp  8/30/2019 2:11:45 PM  9/3/2019  12 PM - 3 PM  9/3/2019  JOS 
BLD - Drywall Inspection  8/30/2019 2:12:07 PM  9/3/2019  12 PM - 3 PM  9/3/2019  JOS 
BLD - Insulation Insp  8/30/2019 2:12:30 PM  9/3/2019  12 PM - 3 PM  9/3/2019  JOS 
BLD - Exterior Lath Insp  9/3/2019 2:31:02 PM  9/4/2019  12 PM - 3 PM  9/4/2019  BEN 
BLD - Insulation Insp  9/3/2019 2:31:28 PM  9/4/2019  12 PM - 3 PM  9/4/2019  BEN 
BLD - Drywall Inspection  9/4/2019 2:57:37 PM  9/5/2019  12 PM - 3 PM  9/5/2019  BEN 
BLD - Framing Insp.  9/4/2019 3:10:42 PM  9/5/2019  12 PM - 3 PM  9/5/2019  BEN 
BLD - Framing Insp.  9/5/2019 3:20:44 PM  9/6/2019  12 PM - 3 PM  9/6/2019  BEN 
BLD - Drywall Inspection  9/5/2019 3:23:03 PM  9/6/2019  12 PM - 3 PM  9/6/2019  BEN 
BLD - Drywall Inspection  9/6/2019 2:27:09 PM  9/9/2019  10 AM - 2 PM  9/9/2019  PJJ 
BLD - Framing Insp.  9/6/2019 2:27:19 PM  9/9/2019  10 AM - 2 PM  9/9/2019  PJJ 
BLD - Drywall Inspection  9/9/2019 3:34:43 PM  9/10/2019  12 PM - 3 PM  9/10/2019  BEN 
BLD - Framing Insp.  9/9/2019 3:35:25 PM  9/10/2019  12 PM - 3 PM  9/10/2019  BEN 
BLD - Framing Insp.  9/10/2019 2:46:13 PM  9/11/2019  12 PM - 3 PM  9/11/2019  BEN 
BLD - Drywall Inspection  9/10/2019 2:46:22 PM  9/11/2019  12 PM - 3 PM  9/11/2019  BEN 
BLD - Drywall Inspection  9/11/2019 3:43:25 PM  9/12/2019  8 AM - 12 PM  9/12/2019  BEN 
BLD - Drywall Inspection  9/12/2019 3:03:56 PM  9/13/2019  12 PM - 3 PM  9/13/2019  BEN 
BLD - Exterior Lath Insp  9/12/2019 3:27:04 PM  9/13/2019  12 PM - 3 PM  9/13/2019  BEN 
BLD - Exterior Lath Insp  9/13/2019  9/14/2019    9/17/2019  BEN 
BLD - Drywall Inspection  9/14/2019 9:57:32 AM  9/16/2019  10 AM - 2 PM  9/16/2019  PJJ 
BLD - Framing Insp.  9/14/2019 9:57:52 AM  9/16/2019  10 AM - 2 PM  9/16/2019  PJJ 
BLD - Framing Insp.  9/16/2019 3:18:32 PM  9/17/2019  12 PM - 3 PM  9/17/2019  BEN 
BLD - Drywall Inspection  9/16/2019 3:18:53 PM  9/17/2019  12 PM - 3 PM  9/17/2019  BEN 
BLD - Drywall Inspection  9/17/2019 3:08:44 PM  9/18/2019  12 PM - 3 PM  9/18/2019  BEN 
BLD - Framing Insp.  9/17/2019 4:20:03 PM  9/18/2019  12 PM - 3 PM  9/18/2019  BEN 
BLD - Drywall Inspection  9/18/2019 3:33:22 PM  9/19/2019  12 PM - 3 PM  9/19/2019  BEN 
BLD - Framing Insp.  9/18/2019 3:33:46 PM  9/19/2019  12 PM - 3 PM  9/19/2019  BEN 
BLD - Framing Insp.  9/19/2019 4:26:26 PM  9/20/2019  12 PM - 3 PM  9/20/2019  BEN 
BLD - Insulation Insp  9/20/2019 3:05:58 PM  9/23/2019  10 AM - 2 PM  9/23/2019  PJJ 
BLD - Drywall Inspection  9/20/2019 3:06:07 PM  9/23/2019  10 AM - 2 PM  9/23/2019  PJJ 
BLD - Framing Insp.  9/20/2019 3:06:17 PM  9/23/2019  10 AM - 2 PM  9/23/2019  PJJ 
BLD - Framing Insp.  9/23/2019 3:05:45 PM  9/24/2019  12 PM - 3 PM  9/24/2019  BEN 
BLD - Drywall Inspection  9/23/2019 3:05:53 PM  9/24/2019  12 PM - 3 PM  9/24/2019  BEN 
BLD - Framing Insp.  9/24/2019 2:19:30 PM  9/25/2019  12 PM - 3 PM  9/25/2019  BEN 
BLD - Drywall Inspection  9/24/2019 2:19:38 PM  9/25/2019  12 PM - 3 PM  9/25/2019  BEN 
BLD - Framing Insp.  9/25/2019 6:07:30 PM  9/26/2019    9/26/2019  BEN 
BLD - Drywall Inspection  9/25/2019 6:07:41 PM  9/26/2019    9/26/2019  BEN 
BLD - Framing Insp.  9/26/2019 8:08:46 PM  9/27/2019    9/27/2019  BEN 
BLD - Drywall Inspection  9/26/2019 8:08:56 PM  9/27/2019    9/27/2019  BEN 
BLD - Drywall Inspection  9/30/2019 3:06:04 PM  10/1/2019  12 PM - 3 PM  10/1/2019  BEN 
BLD - Drywall Inspection  10/1/2019 4:07:25 PM  10/2/2019  10 AM - 2 PM  10/2/2019  BEN 
BLD - Insulation Insp  10/2/2019 3:35:34 PM  10/3/2019  12 PM - 3 PM  10/3/2019  BEN 
BLD - Insulation Insp  10/3/2019 10:09:39 PM  10/4/2019  12 PM - 3 PM  10/4/2019  BEN 
BLD - Insulation Insp  10/5/2019 3:00:58 PM  10/7/2019  8 AM - 12 PM  10/7/2019  PJJ 
BLD - Framing Insp.  10/8/2019 3:48:26 PM  10/9/2019  12 PM - 3 PM  10/9/2019  BEN 
BLD - Framing Insp.  10/10/2019 3:59:28 PM  10/11/2019  12 PM - 3 PM  10/11/2019  BEN 
BLD - Framing Insp.  10/13/2019 6:46:46 AM  10/14/2019  10 AM - 2 PM  10/14/2019  MMO 
BLD - Drywall Inspection  10/14/2019 2:44:32 PM  10/15/2019  12 PM - 3 PM  10/15/2019  BEN 
BLD - Drywall Inspection  10/18/2019 2:16:01 PM  10/21/2019  10 AM - 2 PM  10/21/2019  PJJ 
BLD - Exterior Lath Insp  10/22/2019 8:34:06 AM  10/23/2019  12 PM - 3 PM  10/23/2019  BEN 
Route to Struct/Architectual  10/22/2019  11/7/2019    11/7/2019  CORR  ITW 
Apprv. by Struct/Architectural  10/22/2019      11/14/2019  DONE  ITW 
Route to Planning Zoning  10/22/2019  11/7/2019    11/7/2019  APPR  EYT 
Approved by Planning Zoning  10/22/2019      11/7/2019 11:18:49 AM  APPR  EYT 
Approved by Fire Department  10/22/2019      11/6/2019 1:26:20 PM  NR  EPO 
Route to Fire Department  10/22/2019  11/7/2019    11/6/2019  NR  EPO 
BLD - Exterior Lath Insp  10/23/2019 3:10:26 PM  10/24/2019    10/24/2019  BEN 
BLD - Framing Insp.  10/23/2019 3:10:44 PM  10/24/2019    10/24/2019  BEN 
BLD - Insulation Insp  10/23/2019 3:11:25 PM  10/24/2019    10/24/2019  BEN 
BLD - Framing Insp.  10/24/2019 3:20:55 PM  10/25/2019  12 PM - 3 PM  10/25/2019  BEN 
BLD - Insulation Insp  10/24/2019 3:21:03 PM  10/25/2019  12 PM - 3 PM  10/25/2019  BEN 
BLD - Drywall Inspection  10/24/2019 3:21:13 PM  10/25/2019  12 PM - 3 PM  10/25/2019  BEN 
BLD - Exterior Lath Insp  10/24/2019 3:21:57 PM  10/25/2019  12 PM - 3 PM  10/25/2019  BEN 
BLD - Drywall Inspection  10/25/2019 2:46:23 PM  10/28/2019  10 AM - 2 PM  10/28/2019  JOS 
BLD - Framing Insp.  10/25/2019 2:46:43 PM  10/28/2019  10 AM - 2 PM  10/28/2019  JOS 
BLD - Exterior Lath Insp  10/25/2019 2:46:54 PM  10/28/2019  10 AM - 2 PM  10/28/2019  JOS 
BLD - Exterior Lath Insp  10/28/2019 3:01:38 PM  10/29/2019  10 AM - 2 PM  10/29/2019  BEN 
BLD - Insulation Insp  10/28/2019 3:02:41 PM  10/29/2019  10 AM - 2 PM  10/29/2019  BEN 
BLD - Framing Insp.  10/28/2019 3:02:48 PM  10/29/2019  10 AM - 2 PM  10/29/2019  BEN 
BLD - Exterior Lath Insp  10/29/2019 2:53:10 PM  10/30/2019  12 PM - 3 PM  10/30/2019  BEN 
BLD - Drywall Inspection  10/29/2019 3:36:47 PM  10/30/2019  12 PM - 3 PM  10/30/2019  BEN 
BLD - Framing Insp.  10/30/2019 2:50:51 PM  10/31/2019    10/31/2019  BEN 
BLD - Exterior Lath Insp  10/30/2019 2:51:02 PM  10/31/2019    10/31/2019  BEN 
BLD - Drywall Inspection  10/31/2019 3:19:08 PM  11/1/2019    11/1/2019  BEN 
BLD - Exterior Lath Insp  10/31/2019 3:19:22 PM  11/1/2019    11/1/2019  BEN 
BLD - Exterior Lath Insp  11/3/2019 10:43:01 AM  11/4/2019  10 AM - 2 PM  11/4/2019  PJJ 
BLD - Framing Insp.  11/3/2019 10:43:14 AM  11/4/2019  10 AM - 2 PM  11/4/2019  PJJ 
BLD - Insulation Insp  11/3/2019 10:43:34 AM  11/4/2019  10 AM - 2 PM  11/4/2019  PJJ 
BLD - Drywall Inspection  11/3/2019 10:43:48 AM  11/4/2019  10 AM - 2 PM  11/4/2019  PJJ 
BLD - Exterior Lath Insp  11/5/2019 12:18:55 PM  11/6/2019  8 AM - 12 PM  11/6/2019  BEN 
BLD - Exterior Lath Insp  11/6/2019 9:25:39 PM  11/7/2019  12 PM - 3 PM  11/7/2019  BEN 
BLD - Reinforcing Insp  11/6/2019 9:26:03 PM  11/7/2019  12 PM - 3 PM  11/7/2019  BEN 
BLD - Exterior Lath Insp  11/7/2019 10:12:38 AM  11/8/2019  12 PM - 3 PM  11/8/2019  BEN 
BLD - Reinforcing Insp  11/7/2019 3:16:21 PM  11/8/2019  12 PM - 3 PM  11/8/2019  BEN 
BLD - Drywall Inspection  11/7/2019 3:16:57 PM  11/8/2019  12 PM - 3 PM  11/8/2019  BEN 
BLD - Framing Insp.  11/7/2019 3:17:04 PM  11/8/2019  12 PM - 3 PM  11/8/2019  BEN 
BLD - Exterior Brown Coat Insp  11/8/2019 3:01:44 PM  11/12/2019  10 AM - 2 PM  11/12/2019  PJJ 
Route to Struct/Architectual  11/14/2019  12/4/2019    11/14/2019  APPR  ITW 
BLD - Exterior Brown Coat Insp  11/14/2019 6:33:17 PM  11/15/2019    11/15/2019  BEN 
BLD - Drywall Inspection  11/16/2019 7:39:44 AM  11/18/2019  10 AM - 2 PM  11/18/2019  PJJ 
BLD - Exterior Lath Insp  11/18/2019 2:14:41 PM  11/19/2019    11/19/2019  GCT 
BLD - Framing Insp.  11/18/2019 2:15:18 PM  11/19/2019    11/19/2019  GCT 
BLD - Exterior Lath Insp  11/20/2019 3:15:40 PM  11/21/2019  8 AM - 12 PM  11/21/2019  BEN 
BLD - Drywall Inspection  11/21/2019 2:52:23 PM  11/22/2019  10 AM - 2 PM  11/22/2019  BEN 
BLD - Exterior Brown Coat Insp  11/21/2019 3:34:41 PM  11/22/2019  10 AM - 2 PM  11/22/2019  BEN 
BLD - Reinforcing Insp  11/21/2019 6:27:55 PM  11/22/2019  10 AM - 2 PM  11/22/2019  BEN 
BLD - Exterior Lath Insp  11/24/2019 8:32:07 AM  11/25/2019  10 AM - 2 PM  11/25/2019  PJJ 
Route to Struct/Architectual  11/25/2019  12/13/2019    12/13/2019  APPR  ITW 
Apprv. by Struct/Architectural  11/25/2019      12/11/2019 2:47:47 PM  APPR  ITW 
BLD - Drywall Inspection  11/25/2019 2:46:47 PM  11/26/2019  10 AM - 2 PM  11/26/2019  BEN 
Approved by Planning Zoning  12/12/2019      12/23/2019 8:26:48 AM  APPR  EYT 
Route to Planning Zoning  12/12/2019  12/20/2019    12/23/2019  APPR  EYT 
BLD - Exterior Lath Insp  12/26/2019 3:36:17 PM  12/27/2019  8 AM - 12 PM  12/27/2019  BEN 
BLD - Reinforcing Insp  1/7/2020 4:21:04 PM  1/8/2020  10 AM - 2 PM  1/8/2020  BEN 
BLD - Framing Insp.  1/7/2020 4:21:29 PM  1/8/2020  10 AM - 2 PM  1/8/2020  BEN 
BLD - Reinforcing Insp  1/9/2020 5:01:54 AM  1/10/2020  8 AM - 12 PM  1/10/2020  BEN 
BLD - Framing Insp.  1/9/2020 5:02:57 AM  1/10/2020  8 AM - 12 PM  1/10/2020  BEN 
BLD - Reinforcing Insp  1/10/2020 4:20:36 PM  1/13/2020  10 AM - 2 PM  1/13/2020  PJJ 
BLD - Framing Insp.  1/13/2020 11:40:17 AM  1/14/2020  8 AM - 12 PM  1/14/2020  BEN 
Apprv. by Struct/Architectural  12/12/2019      3/12/2020 4:12:25 PM  APPR  ITW 
Route to Struct/Architectual  12/12/2019  12/31/2019    12/30/2019  CORR  ITW 
BLD - Reinforcing Insp  1/13/2020 4:37:21 PM  1/14/2020  8 AM - 12 PM  1/14/2020  BEN 
BLD - Framing Insp.  1/14/2020 10:33:25 AM  1/15/2020  10 AM - 2 PM  1/15/2020  BEN 
BLD - Exterior Lath Insp  1/14/2020 4:40:50 PM  1/15/2020  10 AM - 2 PM  1/15/2020  BEN 
BLD - Reinforcing Insp  1/15/2020 2:07:45 PM  1/16/2020  12 PM - 3 PM  1/16/2020  BEN 
BLD - Exterior Lath Insp  1/15/2020 2:08:01 PM  1/16/2020  12 PM - 3 PM  1/16/2020  BEN 
BLD - Reinforcing Insp  1/16/2020 5:52:54 PM  1/17/2020  10 AM - 2 PM  1/17/2020  PJJ 
BLD - Reinforcing Insp  1/24/2020 2:32:06 PM  1/27/2020  10 AM - 2 PM  1/27/2020  PJJ 
Route to Struct/Architectual  1/27/2020  2/6/2020    2/6/2020  CORR  ITW 
BLD - Reinforcing Insp  1/29/2020 4:16:58 PM  1/30/2020  8 AM - 12 PM  1/30/2020  BEN 
BLD - Exterior Lath Insp  2/7/2020 1:09:18 PM  2/10/2020  8 AM - 12 PM  2/10/2020  PJJ 
BLD - Framing Insp.  2/10/2020 3:53:32 PM  2/11/2020  12 PM - 3 PM  2/11/2020  BEN 
BLD - Framing Insp.  2/27/2020 4:36:16 PM  2/28/2020  10 AM - 2 PM  2/28/2020  PJJ 
Route to Struct/Architectual  2/28/2020  3/17/2020    3/12/2020  CORR  ITW 
Apprv. by Struct/Architectural  2/28/2020      4/22/2020 9:16:32 AM  APPR  ITW 
Route to Planning Zoning  2/28/2020  3/17/2020    3/5/2020  APPR  EYT 
Approved by Planning Zoning  2/28/2020      3/5/2020 9:37:08 AM  APPR  EYT 
Route to Struct/Architectual  3/9/2020  3/16/2020    3/12/2020  APPR  ITW 
Route to Struct/Architectual  4/10/2020  5/1/2020    4/22/2020  APPR  ITW 
Approved by Planning Zoning  4/16/2020      5/1/2020 8:42:51 AM  APPR  EYT 
Route to Planning Zoning  4/16/2020  5/4/2020    5/1/2020  APPR  EYT 
Approved Revision Structural  4/16/2020      6/15/2020  APPR  ITW 
Route Revision Structural  4/16/2020  5/4/2020    4/20/2020  CORR  ITW 
Route to Fire Department  4/21/2020  5/12/2020    5/12/2020  NR  LIY 
Approved by Fire Department  4/21/2020      5/12/2020  NR  LIY 
Approved by Planning Zoning  4/21/2020      5/1/2020 8:20:37 AM  APPR  EYT 
Route to Planning Zoning  4/21/2020  5/12/2020    5/1/2020  APPR  EYT 
Route to Struct/Architectual  4/21/2020  5/12/2020    5/13/2020  CORR  ITW 
Apprv. by Struct/Architectural  4/21/2020      6/15/2020 5:07:31 PM  APPR  ITW 
Route to Struct/Architectual  6/5/2020  6/23/2020    6/15/2020  APPR  ITW 
Route to Struct/Architectual  6/16/2020  7/2/2020    6/22/2020  APPR  ITW 
Route to Struct/Architectual  6/17/2020  7/3/2020    7/1/2020  CORR  ITW 
Apprv. by Struct/Architectural  6/17/2020      8/3/2020 2:36:39 PM  APPR  ITW 
Route to Planning Zoning  6/17/2020  7/3/2020    7/2/2020  APPR  EYT 
Approved by Planning Zoning  6/17/2020      7/2/2020 1:55:46 PM  APPR  EYT 
Route to Fire Department  6/17/2020  7/3/2020    7/7/2020  NR  LIY 
Approved by Fire Department  6/17/2020      7/7/2020 2:48:27 PM  NR  LIY 
Route to Struct/Architectual  7/17/2020  8/4/2020    8/3/2020  APPR  ITW 
BLD - Reinforcing Insp  8/14/2020 5:23:29 PM  8/17/2020  8 AM - 12 PM  8/17/2020  PJJ 
BLD - Footings Insp  8/17/2020 4:09:09 PM  8/18/2020  8 AM - 12 PM  8/18/2020  PJJ 
BLD - Pre-Grout Insp  8/26/2020 3:34:17 PM  8/27/2020  8 AM - 12 PM  8/27/2020  BEN 
Route Revision Structural  9/2/2020  9/21/2020    9/23/2020  APPR  ITW 
Approved Revision Structural  9/2/2020      9/23/2020  APPR  ITW 
BLD - Misc. Inspection  9/17/2020  9/22/2020  8 AM - 12 PM  9/22/2020  PJJ 
BLD - Framing Insp.  9/29/2020 10:41:10 AM  9/30/2020  10 AM - 2 PM  9/30/2020  BEN 
Approved Revision Structural  9/30/2020      10/12/2020  APPR  ITW 
Route Revision Structural  9/30/2020  10/16/2020    10/9/2020  APPR  ITW 
Route to Fire Department  9/30/2020  10/16/2020    10/21/2020  APPR  DRZ 
Approved by Fire Department  9/30/2020      10/21/2020  APPR  DRZ 
BLD - Framing Insp.  9/30/2020 11:40:50 AM  10/1/2020  12 PM - 3 PM  10/1/2020  BEN 
Apprv. by Struct/Architectural  10/6/2020      11/18/2020 2:31:54 PM  APPR  ITW 
Route to Struct/Architectual  10/6/2020  10/22/2020    10/16/2020  CORR  ITW 
BLD - Penetrations -Fire Rated  10/7/2020 3:56:27 PM  10/8/2020  8 AM - 12 PM  10/8/2020  BEN 
BLD - Footings Insp  10/13/2020 3:10:39 PM  10/14/2020  12 PM - 3 PM  10/14/2020  BEN 
BLD - Framing Insp.  10/13/2020 3:11:02 PM  10/14/2020  12 PM - 3 PM  10/14/2020  BEN 
BLD - Drywall Inspection  10/13/2020 3:11:21 PM  10/14/2020  12 PM - 3 PM  10/14/2020  BEN 
BLD - Framing Insp.  10/14/2020 6:03:46 PM  10/15/2020  8 AM - 12 PM  10/15/2020  BEN 
BLD - Footings Insp  10/14/2020 6:04:04 PM  10/15/2020  8 AM - 12 PM  10/15/2020  BEN 
BLD - Drywall Inspection  10/14/2020 6:04:23 PM  10/15/2020  8 AM - 12 PM  10/15/2020  BEN 
Inspection by Fire Department  10/21/2020  11/6/2020    11/24/2020  DONE  638 
Route to Struct/Architectual  10/23/2020  11/10/2020    11/18/2020  APPR  ITW 
Route to Struct/Architectual  10/27/2020  11/13/2020    11/12/2020  CORR  ITW 
Apprv. by Struct/Architectural  10/27/2020      11/12/2020  NA  CMN 
BLD - Reinforcing Insp  10/28/2020  11/3/2020  8 AM - 12 PM  11/3/2020  PJJ 
BLD - Penetrations -Fire Rated  11/5/2020 3:38:07 PM  11/6/2020  8 AM - 12 PM  11/6/2020  BEN 
BLD - Framing Insp.  11/11/2020 7:01:37 PM  11/13/2020  12 PM - 3 PM  11/13/2020  BEN 
Route to Struct/Architectual  11/13/2020  12/3/2020    11/18/2020  APPR  ITW 
BLD - Framing Insp.  11/18/2020 4:58:27 PM  11/19/2020  12 PM - 3 PM  11/19/2020  BEN 
BLD - Framing Insp.  11/19/2020 4:01:57 PM  11/20/2020  12 PM - 3 PM  11/24/2020  BEN 
BLD - Framing Insp.  11/20/2020  11/23/2020    11/24/2020  BEN 
Building Final Insp Request  11/24/2020 5:25:52 PM  11/25/2020  10 AM - 2 PM  11/25/2020  BEN 
Building Final Insp Request  11/30/2020 3:04:39 PM  12/1/2020  8 AM - 12 PM  12/1/2020  BEN 
Building Final        12/1/2020    BEN 
Planning GIS - Building Change  12/1/2020 4:16:06 PM      12/2/2020  DONE  MAR3 

 