Type  |
Requested  |
Scheduled  |
Time of Inspection  |
Completed  |
Disposition  |
Employee  |
Route to Struct/Architectual  |
10/9/2017  |
10/25/2017  |
  |
10/24/2017  |
CORR  |
BVD  |
Apprv. by Struct/Architectural  |
10/9/2017  |
  |
  |
1/30/2018 6:10:10 AM  |
APPR  |
BVD  |
Route to Planning Zoning  |
10/9/2017  |
11/9/2017  |
  |
10/10/2017  |
APPR  |
EYT  |
Approved by Planning Zoning  |
10/9/2017  |
  |
  |
10/10/2017 1:31:53 PM  |
APPR  |
EYT  |
Approved by Addressing  |
10/9/2017  |
  |
  |
10/18/2017 10:44:47 AM  |
APPR  |
HXN  |
Route to Addressing  |
10/9/2017  |
10/25/2017  |
  |
10/18/2017  |
APPR  |
HXN  |
Approved by Bus Lic (Sub List)  |
10/9/2017  |
9/11/2018  |
  |
10/9/2018  |
APPR  |
AMJ  |
Route to Electrical  |
10/9/2017  |
10/25/2017  |
  |
10/25/2017  |
APPR  |
MCS  |
Approved by Electrical  |
10/9/2017  |
  |
  |
10/25/2017 10:29:21 AM  |
APPR  |
MCS  |
Approved by Elec Engineering  |
10/9/2017  |
  |
  |
10/24/2017 9:06:19 AM  |
APPR  |
JJB  |
Route to Elec Engineering  |
10/9/2017  |
11/9/2017  |
  |
10/24/2017  |
APPR  |
JJB  |
Approved by Fire Department  |
10/9/2017  |
  |
  |
10/30/2017 11:07:01 AM  |
APPR  |
408  |
Route to Fire Department  |
10/9/2017  |
11/9/2017  |
  |
10/30/2017  |
APPR  |
408  |
Approved by Mechanical  |
10/9/2017  |
  |
  |
10/25/2017 3:12:59 PM  |
APPR  |
GAQ  |
Route to Mechanical  |
10/9/2017  |
10/25/2017  |
  |
10/25/2017  |
APPR  |
GAQ  |
Approved by Plumbing  |
10/9/2017  |
  |
  |
10/25/2017 3:13:12 PM  |
APPR  |
GAQ  |
Route to Plumbing  |
10/9/2017  |
10/25/2017  |
  |
10/25/2017  |
APPR  |
GAQ  |
FIRE - Create BFP case  |
10/30/2017  |
  |
  |
10/30/2017  |
DONE  |
408  |
Inspection by Fire Department  |
10/30/2017  |
11/16/2017  |
  |
10/16/2018  |
DONE  |
MGA  |
Route to Struct/Architectual  |
11/22/2017  |
12/12/2017  |
  |
12/12/2017  |
CORR  |
BVD  |
Route to Struct/Architectual  |
1/23/2018  |
2/8/2018  |
  |
1/30/2018  |
APPR  |
BVD  |
BLD - Framing Insp.  |
2/1/2018 10:24:31 AM  |
2/2/2018  |
8 AM - 12 PM  |
2/2/2018  |
P  |
BCJ  |
BLD - Framing Insp.  |
2/13/2018 1:22:23 PM  |
2/14/2018  |
10 AM - 2 PM  |
2/14/2018  |
N  |
GCT  |
BLD - Framing Insp.  |
2/14/2018 11:31:19 AM  |
2/15/2018  |
10 AM - 2 PM  |
2/15/2018  |
P  |
GCT  |
Approved Revision Structural  |
3/2/2018  |
  |
  |
4/19/2018  |
APPR  |
BVD  |
Route Revision Structural  |
3/2/2018  |
3/20/2018  |
  |
3/19/2018  |
CORR  |
BVD  |
BLD - Reinforcing Insp  |
3/13/2018 12:29:44 PM  |
3/14/2018  |
8 AM - 12 PM  |
3/14/2018  |
P  |
BCJ  |
BLD - Pre-Slab Insp  |
3/14/2018  |
3/14/2018  |
  |
3/14/2018  |
P  |
BCJ  |
BLD - Framing Insp.  |
3/20/2018 12:39:29 PM  |
3/21/2018  |
10 AM - 2 PM  |
3/21/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
3/22/2018 11:44:56 AM  |
3/23/2018  |
8 AM - 12 PM  |
3/23/2018  |
N  |
BCJ  |
BLD - Framing Insp.  |
3/23/2018 3:55:31 PM  |
3/26/2018  |
8 AM - 12 PM  |
3/26/2018  |
N  |
GCT  |
BLD - Framing Insp.  |
3/26/2018 3:27:33 PM  |
3/27/2018  |
10 AM - 2 PM  |
3/27/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
3/28/2018 12:57:52 PM  |
3/29/2018  |
10 AM - 2 PM  |
3/29/2018  |
NA  |
JOS  |
BLD - Drywall Inspection  |
3/29/2018 3:46:35 PM  |
3/30/2018  |
12 PM - 3 PM  |
3/30/2018  |
P  |
JOS  |
BLD - Framing Insp.  |
4/4/2018 2:54:57 PM  |
4/5/2018  |
8 AM - 12 PM  |
4/5/2018  |
N  |
JOS  |
BLD - Framing Insp.  |
4/5/2018 11:30:43 AM  |
4/6/2018  |
10 AM - 2 PM  |
4/6/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
4/11/2018 11:49:11 AM  |
4/12/2018  |
10 AM - 2 PM  |
4/12/2018  |
P  |
JOS  |
BLD - Framing Insp.  |
4/18/2018 11:08:17 AM  |
4/19/2018  |
10 AM - 2 PM  |
4/19/2018  |
P  |
GCT  |
Route Revision Structural  |
4/19/2018  |
5/7/2018  |
  |
4/19/2018  |
APPR  |
BVD  |
BLD - Framing Insp.  |
4/23/2018 9:00:51 AM  |
4/24/2018  |
8 AM - 12 PM  |
4/24/2018  |
C  |
BIH  |
BLD - Drywall Inspection  |
4/24/2018  |
4/24/2018  |
10 AM - 2 PM  |
4/24/2018  |
P  |
BIH  |
Approved Revision Electrical  |
4/25/2018  |
  |
  |
5/10/2018  |
APPR  |
MCS  |
Route Revision Electrical  |
4/25/2018  |
5/11/2018  |
  |
5/10/2018  |
APPR  |
MCS  |
Approved by Elec Engineering  |
4/25/2018  |
  |
  |
5/1/2018 9:30:51 AM  |
APPR  |
JJB  |
Approved by Elec Engineering  |
4/25/2018  |
  |
  |
5/1/2018  |
DONE  |
JJB  |
Route to Elec Engineering  |
4/25/2018  |
5/11/2018  |
  |
5/1/2018  |
APPR  |
JJB  |
Approved Revision Mechanical  |
4/25/2018  |
  |
  |
5/15/2018  |
NR  |
GAQ  |
Route Revision Mechanical  |
4/25/2018  |
5/11/2018  |
  |
5/15/2018  |
NR  |
GAQ  |
Approved Revision Plumbing  |
4/25/2018  |
  |
  |
5/15/2018  |
NR  |
GAQ  |
Route Revision Plumbing  |
4/25/2018  |
5/11/2018  |
  |
5/15/2018  |
NR  |
GAQ  |
Approved Revision Structural  |
4/25/2018  |
  |
  |
5/31/2018  |
APPR  |
BVD  |
Route Revision Structural  |
4/25/2018  |
5/11/2018  |
  |
5/10/2018  |
CORR  |
BVD  |
Approved by Planning Zoning  |
4/25/2018  |
  |
  |
4/26/2018 7:51:03 AM  |
APPR  |
EYT  |
Route to Planning Zoning  |
4/25/2018  |
5/11/2018  |
  |
4/26/2018  |
APPR  |
EYT  |
BLD - Framing Insp.  |
4/25/2018 2:22:02 PM  |
4/26/2018  |
10 AM - 2 PM  |
4/26/2018  |
F  |
JOS  |
BLD - Framing Insp.  |
4/26/2018 8:27:55 PM  |
4/27/2018  |
8 AM - 12 PM  |
4/27/2018  |
N  |
BCJ  |
BLD - T-Bar (Structural) Insp  |
5/1/2018 10:42:34 AM  |
5/2/2018  |
12 PM - 3 PM  |
5/2/2018  |
N  |
GCT  |
BLD - Framing Insp.  |
5/7/2018 1:09:17 PM  |
5/8/2018  |
10 AM - 2 PM  |
5/8/2018  |
F  |
BEN  |
BLD - T-Bar (Structural) Insp  |
5/7/2018 1:10:02 PM  |
5/8/2018  |
10 AM - 2 PM  |
5/8/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
5/10/2018 11:46:33 AM  |
5/11/2018  |
  |
5/11/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
5/10/2018 1:36:25 PM  |
5/11/2018  |
  |
5/11/2018  |
C  |
BEN  |
BLD - TCO App Consideration  |
5/10/2018  |
5/11/2018  |
  |
5/11/2018  |
N  |
BEN  |
BLD - Drywall Inspection  |
5/14/2018 9:27:51 AM  |
5/15/2018  |
8 AM - 12 PM  |
5/15/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
5/14/2018 10:39:52 AM  |
5/15/2018  |
8 AM - 12 PM  |
5/15/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
5/15/2018 4:33:05 PM  |
5/16/2018  |
12 PM - 3 PM  |
5/16/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
5/16/2018 2:45:07 PM  |
5/17/2018  |
10 AM - 2 PM  |
5/17/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
5/18/2018 12:03:01 PM  |
5/21/2018  |
10 AM - 2 PM  |
5/21/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
5/18/2018 12:03:21 PM  |
5/21/2018  |
10 AM - 2 PM  |
5/21/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
5/18/2018  |
5/19/2018  |
  |
5/22/2018  |
P  |
BCJ  |
Route Revision Structural  |
5/21/2018  |
6/7/2018  |
  |
5/31/2018  |
APPR  |
BVD  |
BLD - Drywall Inspection  |
5/24/2018 11:41:04 AM  |
5/25/2018  |
10 AM - 2 PM  |
5/25/2018  |
P  |
BCJ  |
BLD - Framing Insp.  |
5/25/2018  |
5/26/2018  |
8 AM - 12 PM  |
5/30/2018  |
P  |
BCJ  |
BLD - Drywall Inspection  |
5/25/2018  |
5/27/2018  |
8 AM - 12 PM  |
5/30/2018  |
P  |
BCJ  |
Route Revision Electrical  |
6/8/2018  |
6/26/2018  |
  |
6/26/2018  |
APPR  |
MCS  |
Approved Revision Electrical  |
6/8/2018  |
  |
  |
6/26/2018  |
APPR  |
MCS  |
Approved by Elec Engineering  |
6/8/2018  |
  |
  |
6/22/2018 8:46:27 AM  |
APPR  |
CMK  |
Route to Elec Engineering  |
6/8/2018  |
6/26/2018  |
  |
6/22/2018  |
APPR  |
CMK  |
Approved by Fire Department  |
6/8/2018  |
  |
  |
6/26/2018 10:49:49 AM  |
APPR  |
408  |
Route to Fire Department  |
6/8/2018  |
6/26/2018  |
  |
6/26/2018  |
APPR  |
408  |
Approved Revision Mechanical  |
  |
  |
  |
6/26/2018  |
DONE  |
GAQ  |
Route Revision Mechanical  |
6/8/2018  |
6/26/2018  |
  |
6/26/2018  |
APPR  |
GAQ  |
Approved by Planning Zoning  |
6/8/2018  |
  |
  |
7/6/2018 9:57:12 AM  |
APPR  |
EYT  |
Route to Planning Zoning  |
6/8/2018  |
6/26/2018  |
  |
7/6/2018  |
APPR  |
EYT  |
Approved Revision Plumbing  |
  |
  |
  |
6/26/2018  |
NR  |
GAQ  |
Route Revision Plumbing  |
6/8/2018  |
6/26/2018  |
  |
6/26/2018  |
NR  |
GAQ  |
Approved Revision Structural  |
6/8/2018  |
  |
  |
7/17/2018  |
DONE  |
BVD  |
Route Revision Structural  |
6/8/2018  |
6/26/2018  |
  |
6/26/2018  |
CORR  |
BVD  |
BLD - Misc. Inspection  |
6/14/2018  |
6/15/2018  |
10 AM - 2 PM  |
6/15/2018  |
P  |
BCJ  |
Route Revision Structural  |
7/2/2018  |
7/19/2018  |
  |
7/17/2018  |
APPR  |
BVD  |
BLD - Reinforcing Insp  |
7/6/2018 5:29:06 PM  |
7/9/2018  |
  |
7/9/2018  |
A  |
GCT  |
BLD - Framing Insp.  |
7/17/2018 9:15:36 AM  |
7/18/2018  |
12 PM - 3 PM  |
7/18/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
7/20/2018 1:01:59 PM  |
7/23/2018  |
10 AM - 2 PM  |
7/23/2018  |
N  |
GCT  |
BLD - Framing Insp.  |
7/23/2018 4:15:54 PM  |
7/24/2018  |
10 AM - 2 PM  |
7/24/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
7/24/2018 2:41:09 PM  |
7/25/2018  |
  |
7/25/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
7/24/2018 4:29:54 PM  |
7/25/2018  |
  |
7/25/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
7/25/2018 2:56:15 PM  |
7/26/2018  |
  |
7/26/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
7/25/2018 2:56:38 PM  |
7/26/2018  |
  |
7/26/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
7/26/2018 2:58:13 PM  |
7/27/2018  |
10 AM - 2 PM  |
7/27/2018  |
P  |
BCJ  |
BLD - Framing Insp.  |
7/30/2018 12:29:48 PM  |
7/31/2018  |
8 AM - 12 PM  |
7/31/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
7/31/2018 1:51:25 PM  |
8/1/2018  |
8 AM - 12 PM  |
8/1/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
8/1/2018 11:07:49 AM  |
8/2/2018  |
  |
8/2/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
8/1/2018 11:08:06 AM  |
8/2/2018  |
  |
8/2/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
8/2/2018 2:08:46 PM  |
8/3/2018  |
8 AM - 12 PM  |
8/3/2018  |
P  |
BCJ  |
BLD - Drywall Inspection  |
8/3/2018 10:51:49 AM  |
8/6/2018  |
10 AM - 2 PM  |
8/6/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
8/6/2018 1:49:35 PM  |
8/7/2018  |
10 AM - 2 PM  |
8/7/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
8/7/2018 2:00:51 PM  |
8/8/2018  |
10 AM - 2 PM  |
8/8/2018  |
F  |
PJJ  |
BLD - Framing Insp.  |
8/8/2018 1:26:53 PM  |
8/9/2018  |
  |
8/9/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
8/8/2018 1:28:14 PM  |
8/9/2018  |
  |
8/9/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
8/9/2018 1:57:36 PM  |
8/10/2018  |
8 AM - 12 PM  |
8/10/2018  |
N  |
GCT  |
BLD - Drywall Inspection  |
8/9/2018 2:01:08 PM  |
8/10/2018  |
8 AM - 12 PM  |
8/10/2018  |
N  |
GCT  |
BLD - Framing Insp.  |
8/11/2018 7:51:49 AM  |
8/13/2018  |
8 AM - 12 PM  |
8/13/2018  |
N  |
PJJ  |
BLD - Drywall Inspection  |
8/11/2018 7:52:08 AM  |
8/13/2018  |
8 AM - 12 PM  |
8/13/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/13/2018 1:26:16 PM  |
8/14/2018  |
8 AM - 12 PM  |
8/14/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
8/13/2018 1:26:33 PM  |
8/14/2018  |
8 AM - 12 PM  |
8/14/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/14/2018 4:25:59 PM  |
8/15/2018  |
8 AM - 12 PM  |
8/15/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
8/14/2018 4:26:06 PM  |
8/15/2018  |
8 AM - 12 PM  |
8/15/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/15/2018 10:42:08 AM  |
8/16/2018  |
10 AM - 2 PM  |
8/16/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
8/16/2018 12:13:38 PM  |
8/17/2018  |
8 AM - 12 PM  |
8/17/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/16/2018 12:13:46 PM  |
8/17/2018  |
8 AM - 12 PM  |
8/17/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/17/2018 1:57:16 PM  |
8/20/2018  |
8 AM - 12 PM  |
8/20/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
8/17/2018 1:57:28 PM  |
8/20/2018  |
8 AM - 12 PM  |
8/20/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/17/2018  |
8/18/2018  |
8 AM - 12 PM  |
8/20/2018  |
P  |
PJJ  |
Approved Revision Electrical  |
  |
  |
  |
9/5/2018  |
APPR  |
MCS  |
Route Revision Electrical  |
8/20/2018  |
9/6/2018  |
  |
9/5/2018  |
APPR  |
MCS  |
Approved by Fire Department  |
8/20/2018  |
  |
  |
9/12/2018 10:50:15 AM  |
APPR  |
408  |
Route to Fire Department  |
8/20/2018  |
9/6/2018  |
  |
9/12/2018  |
APPR  |
408  |
Approved Revision Mechanical  |
  |
  |
  |
9/5/2018  |
APPR  |
GAQ  |
Route Revision Mechanical  |
8/20/2018  |
9/6/2018  |
  |
9/5/2018  |
APPR  |
GAQ  |
Approved by Planning Zoning  |
8/20/2018  |
  |
  |
8/21/2018 8:25:23 AM  |
APPR  |
EYT  |
Route to Planning Zoning  |
8/20/2018  |
9/6/2018  |
  |
8/21/2018  |
APPR  |
EYT  |
Approved Revision Structural  |
8/20/2018  |
  |
  |
9/25/2018  |
DONE  |
BVD  |
Route Revision Structural  |
8/20/2018  |
9/6/2018  |
  |
9/6/2018  |
CORR  |
BVD  |
BLD - Drywall Inspection  |
8/20/2018 12:07:51 PM  |
8/21/2018  |
8 AM - 12 PM  |
8/21/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/21/2018 2:19:30 PM  |
8/22/2018  |
8 AM - 12 PM  |
8/22/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/22/2018 9:14:33 AM  |
8/23/2018  |
8 AM - 12 PM  |
8/23/2018  |
NA  |
PJJ  |
BLD - Drywall Inspection  |
8/24/2018 2:13:16 PM  |
8/27/2018  |
  |
8/27/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
8/29/2018 11:16:03 AM  |
8/30/2018  |
8 AM - 12 PM  |
8/30/2018  |
P  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
8/30/2018 2:47:41 PM  |
8/31/2018  |
10 AM - 2 PM  |
8/31/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/30/2018 2:47:52 PM  |
8/31/2018  |
10 AM - 2 PM  |
8/31/2018  |
P  |
BEN  |
BLD - T-Bar (Structural) Insp  |
8/31/2018 2:04:29 PM  |
9/4/2018  |
8 AM - 12 PM  |
9/4/2018  |
N  |
PJJ  |
BLD - Drywall Inspection  |
9/5/2018 10:27:26 AM  |
9/6/2018  |
8 AM - 12 PM  |
9/6/2018  |
NA  |
PJJ  |
BLD - Drywall Inspection  |
9/6/2018 11:24:30 AM  |
9/7/2018  |
8 AM - 12 PM  |
9/7/2018  |
P  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
9/10/2018  |
9/11/2018  |
10 AM - 2 PM  |
9/11/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
9/11/2018  |
9/11/2018  |
  |
9/11/2018  |
A  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
9/12/2018 10:43:24 AM  |
9/13/2018  |
8 AM - 12 PM  |
9/13/2018  |
P  |
PJJ  |
BLD - Misc. Inspection  |
9/20/2018  |
9/25/2018  |
10 AM - 2 PM  |
9/25/2018  |
A  |
PJJ  |
Route Revision Structural  |
9/25/2018  |
10/11/2018  |
  |
9/25/2018  |
APPR  |
BVD  |
BLD - Framing Insp.  |
9/27/2018 11:01:44 AM  |
9/28/2018  |
8 AM - 12 PM  |
9/28/2018  |
A  |
PJJ  |
BLD - Reinforcing Insp  |
10/2/2018 12:31:19 PM  |
10/3/2018  |
12 PM - 3 PM  |
10/3/2018  |
A  |
PJJ  |
Building Final Insp Request  |
10/16/2018 2:46:43 PM  |
10/17/2018  |
8 AM - 12 PM  |
10/17/2018  |
A  |
PJJ  |
Building Final  |
  |
  |
  |
10/17/2018  |
  |
PJJ  |