Type  |
Requested  |
Scheduled  |
Time of Inspection  |
Completed  |
Disposition  |
Employee  |
Approved by Bus Lic (Sub List)  |
4/6/2017  |
3/28/2019  |
  |
4/4/2019  |
APPR  |
RHZ  |
Approved by Addressing  |
4/6/2017  |
  |
  |
4/7/2017 7:25:19 AM  |
APPR  |
HXN  |
Route to Addressing  |
4/6/2017  |
4/24/2017  |
  |
4/7/2017 7:25:19 AM  |
APPR  |
HXN  |
Approved by Electrical  |
4/6/2017  |
  |
  |
4/21/2017 11:02:24 AM  |
APPR  |
MCS  |
Route to Electrical  |
4/6/2017  |
4/24/2017  |
  |
4/21/2017  |
APPR  |
MCS  |
Approved by Elec Engineering  |
4/6/2017  |
  |
  |
4/18/2017 10:56:11 AM  |
APPR  |
JJB  |
Route to Elec Engineering  |
4/6/2017  |
4/24/2017  |
  |
4/18/2017  |
APPR  |
JJB  |
Approved by Fire Department  |
4/6/2017  |
  |
  |
5/17/2017  |
APPR  |
408  |
Route to Fire Department  |
4/6/2017  |
4/24/2017  |
  |
4/26/2017  |
CORR  |
408  |
Approved by Mechanical  |
4/6/2017  |
  |
  |
4/24/2017  |
NR  |
GAQ  |
Route to Mechanical  |
4/6/2017  |
4/24/2017  |
  |
4/24/2017  |
NR  |
GAQ  |
Approved by Planning Zoning  |
4/6/2017  |
  |
  |
4/26/2017 3:36:11 PM  |
APPR  |
EYT  |
Route to Planning Zoning  |
4/6/2017  |
4/24/2017  |
  |
4/26/2017  |
APPR  |
EYT  |
Approved by Plumbing  |
4/6/2017  |
  |
  |
4/24/2017  |
APPR  |
GAQ  |
Route to Plumbing  |
4/6/2017  |
4/24/2017  |
  |
4/24/2017  |
APPR  |
GAQ  |
Apprv. by PW Develop. Services  |
4/6/2017  |
  |
  |
5/9/2017 5:33:54 PM  |
APPR  |
SXA  |
Route to PW Develop. Services  |
4/6/2017  |
4/24/2017  |
  |
5/9/2017  |
APPR  |
SXA  |
Approved: School Fees Due  |
4/6/2017  |
  |
  |
7/10/2017  |
APPR  |
CMN  |
Apprv. by Struct/Architectural  |
4/6/2017  |
  |
  |
5/17/2017 3:17:45 PM  |
APPR  |
CSG  |
Route to Struct/Architectual  |
4/6/2017  |
4/24/2017  |
  |
4/24/2017  |
CORR  |
CSG  |
Approved by Traffic Eng.  |
4/6/2017  |
  |
  |
4/24/2017 3:05:51 PM  |
APPR  |
RXC  |
Route to Traffic Engineering  |
4/6/2017  |
4/24/2017  |
  |
4/24/2017  |
APPR  |
RXC  |
Route to Water Engineering  |
4/6/2017  |
4/24/2017  |
  |
4/17/2017  |
APPR  |
DRS  |
Approved by Water Engineering  |
4/6/2017  |
  |
  |
4/17/2017 9:36:53 AM  |
APPR  |
DRS  |
FIRE - Create BFP case  |
4/26/2017  |
  |
  |
4/26/2017  |
DONE  |
408  |
Route to Fire Department  |
5/17/2017  |
6/5/2017  |
  |
5/17/2017  |
APPR  |
408  |
Route to Struct/Architectual  |
5/17/2017  |
6/5/2017  |
  |
5/17/2017  |
APPR  |
CSG  |
Route to Electrical  |
6/6/2017  |
6/22/2017  |
  |
6/16/2017  |
APPR  |
MCS  |
Approved by Electrical  |
6/6/2017  |
  |
  |
6/16/2017 10:36:28 AM  |
APPR  |
MCS  |
Approved by Elec Engineering  |
6/6/2017  |
  |
  |
6/16/2017 2:04:44 PM  |
APPR  |
JJB  |
Route to Elec Engineering  |
6/6/2017  |
6/22/2017  |
  |
6/16/2017  |
APPR  |
JJB  |
Approved by Fire Department  |
6/6/2017  |
  |
  |
6/21/2017 3:25:45 PM  |
APPR  |
408  |
Route to Fire Department  |
6/6/2017  |
6/22/2017  |
  |
6/21/2017  |
APPR  |
408  |
Route to Mechanical  |
6/6/2017  |
6/22/2017  |
  |
6/22/2017  |
APPR  |
GAQ  |
Approved by Mechanical  |
6/6/2017  |
  |
  |
6/22/2017 3:39:02 PM  |
APPR  |
GAQ  |
Approved by Planning Zoning  |
6/6/2017  |
  |
  |
6/28/2017 8:51:43 AM  |
APPR  |
EYT  |
Route to Planning Zoning  |
6/6/2017  |
6/22/2017  |
  |
6/28/2017  |
APPR  |
EYT  |
Approved by Plumbing  |
6/6/2017  |
  |
  |
6/22/2017 3:39:17 PM  |
APPR  |
GAQ  |
Route to Plumbing  |
6/6/2017  |
6/22/2017  |
  |
6/22/2017  |
APPR  |
GAQ  |
Apprv. by PW Develop. Services  |
6/6/2017  |
  |
  |
6/21/2017 1:23:58 PM  |
APPR  |
SXA  |
Route to PW Develop. Services  |
6/6/2017  |
6/22/2017  |
  |
6/21/2017  |
APPR  |
SXA  |
Apprv. by Struct/Architectural  |
6/6/2017  |
  |
  |
7/25/2017 3:15:04 PM  |
APPR  |
CSG  |
Route to Struct/Architectual  |
6/6/2017  |
6/22/2017  |
  |
6/16/2017  |
CORR  |
CSG  |
Approved by Traffic Eng.  |
6/6/2017  |
  |
  |
6/22/2017 1:45:56 PM  |
APPR  |
RXC  |
Route to Traffic Engineering  |
6/6/2017  |
6/22/2017  |
  |
6/22/2017  |
APPR  |
RXC  |
Route to Water Engineering  |
6/6/2017  |
6/22/2017  |
  |
6/22/2017  |
APPR  |
DRS  |
Approved by Water Engineering  |
6/6/2017  |
  |
  |
6/22/2017 6:02:59 PM  |
APPR  |
DRS  |
ELE - Underground conduit  |
6/21/2017  |
6/22/2017  |
  |
6/22/2017  |
P  |
BEN  |
ELE - Underground conduit  |
6/23/2017 11:46:56 AM  |
6/26/2017  |
  |
6/26/2017  |
P  |
GCT  |
ELE - Underground conduit  |
7/11/2017 3:52:39 PM  |
7/12/2017  |
12 PM - 3 PM  |
7/12/2017  |
P  |
GCT  |
ELE - Underground conduit  |
7/12/2017 2:43:43 PM  |
7/13/2017  |
12 PM - 3 PM  |
7/13/2017  |
P  |
GCT  |
BLD - Footings Insp  |
7/16/2017 11:12:14 AM  |
7/17/2017  |
8 AM - 12 PM  |
7/17/2017  |
P  |
GCT  |
BLD - Footings Insp  |
7/20/2017 3:37:12 PM  |
7/21/2017  |
8 AM - 12 PM  |
7/21/2017  |
C  |
JOS  |
Route To Alternate MatL/Method  |
  |
  |
  |
7/21/2017  |
APPR  |
CSG  |
Approved Alternate MatL/Method  |
7/21/2017  |
  |
  |
7/21/2017  |
DONE  |
CSG  |
Route to Fire Department  |
7/21/2017  |
7/28/2017  |
  |
7/28/2017  |
NR  |
408  |
BLD - Footings Insp  |
7/22/2017 11:52:47 AM  |
7/24/2017  |
10 AM - 2 PM  |
7/24/2017  |
P  |
GCT  |
Route to Struct/Architectual  |
7/21/2017  |
8/8/2017  |
  |
7/25/2017  |
APPR  |
CSG  |
BLD - Footings Insp  |
7/24/2017 2:54:19 PM  |
7/25/2017  |
8 AM - 12 PM  |
7/25/2017  |
P  |
GCT  |
BLD - Footings Insp  |
7/31/2017 2:43:55 PM  |
8/1/2017  |
8 AM - 12 PM  |
8/1/2017  |
C  |
BEN  |
BLD - Footings Insp  |
8/3/2017 2:57:46 PM  |
8/4/2017  |
12 PM - 3 PM  |
8/4/2017  |
C  |
BEN  |
BLD - Footings Insp  |
8/4/2017 3:10:04 PM  |
8/7/2017  |
10 AM - 2 PM  |
8/7/2017  |
P  |
GCT  |
BLD - Reinforcing Insp  |
8/4/2017 3:10:14 PM  |
8/7/2017  |
10 AM - 2 PM  |
8/7/2017  |
P  |
GCT  |
BLD - Reinforcing Insp  |
8/7/2017 4:09:49 PM  |
8/8/2017  |
8 AM - 12 PM  |
8/8/2017  |
N  |
BEN  |
BLD - Footings Insp  |
8/7/2017 4:09:57 PM  |
8/8/2017  |
8 AM - 12 PM  |
8/8/2017  |
N  |
BEN  |
BLD - Footings Insp  |
8/8/2017 3:02:35 PM  |
8/9/2017  |
8 AM - 12 PM  |
8/9/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
8/8/2017 3:02:44 PM  |
8/9/2017  |
8 AM - 12 PM  |
8/9/2017  |
P  |
BEN  |
BLD - Footings Insp  |
8/9/2017 5:16:08 PM  |
8/10/2017  |
10 AM - 2 PM  |
8/10/2017  |
C  |
BEN  |
BLD - Reinforcing Insp  |
8/9/2017 5:16:21 PM  |
8/10/2017  |
10 AM - 2 PM  |
8/10/2017  |
C  |
BEN  |
BLD - Reinforcing Insp  |
8/10/2017 3:49:16 PM  |
8/11/2017  |
10 AM - 2 PM  |
8/11/2017  |
P  |
BEN  |
BLD - Footings Insp  |
8/10/2017 3:49:32 PM  |
8/11/2017  |
10 AM - 2 PM  |
8/11/2017  |
P  |
BEN  |
BLD - Footings Insp  |
8/13/2017 2:22:01 PM  |
8/14/2017  |
  |
8/14/2017  |
P  |
GCT  |
BLD - Reinforcing Insp  |
8/13/2017 2:22:29 PM  |
8/14/2017  |
  |
8/14/2017  |
P  |
GCT  |
ELE - Underground conduit  |
8/13/2017 2:22:55 PM  |
8/14/2017  |
  |
8/14/2017  |
P  |
GCT  |
BLD - Footings Insp  |
8/14/2017 3:16:21 PM  |
8/15/2017  |
8 AM - 12 PM  |
8/15/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
8/14/2017 3:17:07 PM  |
8/15/2017  |
8 AM - 12 PM  |
8/15/2017  |
P  |
BEN  |
BLD - Footings Insp  |
8/15/2017 2:50:00 PM  |
8/16/2017  |
12 PM - 3 PM  |
8/16/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
8/15/2017 2:50:10 PM  |
8/16/2017  |
12 PM - 3 PM  |
8/16/2017  |
P  |
BEN  |
BLD - Footings Insp  |
8/16/2017 3:40:47 PM  |
8/17/2017  |
8 AM - 12 PM  |
8/17/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
8/16/2017 3:40:54 PM  |
8/17/2017  |
8 AM - 12 PM  |
8/17/2017  |
P  |
BEN  |
BLD - Footings Insp  |
8/17/2017 2:36:22 PM  |
8/18/2017  |
8 AM - 12 PM  |
8/18/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
8/17/2017 2:36:30 PM  |
8/18/2017  |
8 AM - 12 PM  |
8/18/2017  |
P  |
BEN  |
BLD - Footings Insp  |
8/18/2017 2:39:46 PM  |
8/21/2017  |
10 AM - 2 PM  |
8/21/2017  |
P  |
GCT  |
BLD - Reinforcing Insp  |
8/18/2017 2:39:56 PM  |
8/21/2017  |
10 AM - 2 PM  |
8/21/2017  |
P  |
GCT  |
ELE - Underground conduit  |
8/20/2017 6:01:12 PM  |
8/21/2017  |
10 AM - 2 PM  |
8/21/2017  |
P  |
GCT  |
BLD - Reinforcing Insp  |
8/21/2017 3:17:28 PM  |
8/22/2017  |
12 PM - 3 PM  |
8/22/2017  |
C  |
BEN  |
BLD - Footings Insp  |
8/21/2017 3:17:36 PM  |
8/22/2017  |
12 PM - 3 PM  |
8/22/2017  |
C  |
BEN  |
ELE - Underground conduit  |
8/21/2017 3:18:05 PM  |
8/22/2017  |
12 PM - 3 PM  |
8/22/2017  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
8/21/2017 3:18:41 PM  |
8/22/2017  |
12 PM - 3 PM  |
8/22/2017  |
C  |
BEN  |
PLM - Sewer  |
8/21/2017 3:20:08 PM  |
8/22/2017  |
12 PM - 3 PM  |
8/22/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
8/22/2017 2:58:23 PM  |
8/23/2017  |
8 AM - 12 PM  |
8/23/2017  |
C  |
BEN  |
BLD - Footings Insp  |
8/22/2017 2:58:30 PM  |
8/23/2017  |
8 AM - 12 PM  |
8/23/2017  |
C  |
BEN  |
BLD - Reinforcing Insp  |
8/23/2017 2:56:56 PM  |
8/24/2017  |
12 PM - 3 PM  |
8/24/2017  |
P  |
BEN  |
BLD - Footings Insp  |
8/23/2017 2:57:27 PM  |
8/24/2017  |
12 PM - 3 PM  |
8/24/2017  |
C  |
BEN  |
BLD - Reinforcing Insp  |
9/6/2017 3:23:07 PM  |
9/7/2017  |
8 AM - 12 PM  |
9/7/2017  |
C  |
BEN  |
BLD - Reinforcing Insp  |
9/7/2017 3:31:50 PM  |
9/8/2017  |
8 AM - 12 PM  |
9/8/2017  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
9/7/2017 3:32:15 PM  |
9/8/2017  |
8 AM - 12 PM  |
9/8/2017  |
P  |
BEN  |
PLM - Sewer  |
9/7/2017 3:32:35 PM  |
9/8/2017  |
8 AM - 12 PM  |
9/8/2017  |
P  |
BEN  |
ELE - Underground conduit  |
9/11/2017 2:05:16 PM  |
9/12/2017  |
8 AM - 12 PM  |
9/12/2017  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
9/12/2017 2:30:00 PM  |
9/13/2017  |
10 AM - 2 PM  |
9/13/2017  |
P  |
BEN  |
MEC - Rough Mechanical  |
9/13/2017 3:03:19 PM  |
9/14/2017  |
12 PM - 3 PM  |
9/14/2017  |
C  |
BEN  |
MEC - Underground Rough  |
9/15/2017 2:42:20 PM  |
9/18/2017  |
12 PM - 3 PM  |
9/18/2017  |
P  |
GCT  |
PLM - Ground/Underfloor waste  |
9/15/2017 2:42:32 PM  |
9/18/2017  |
12 PM - 3 PM  |
9/18/2017  |
P  |
GCT  |
BLD - Reinforcing Insp  |
9/17/2017 4:10:34 PM  |
9/18/2017  |
12 PM - 3 PM  |
9/18/2017  |
P  |
GCT  |
BLD - Pre-Slab Insp  |
9/17/2017 4:10:52 PM  |
9/18/2017  |
12 PM - 3 PM  |
9/18/2017  |
P  |
GCT  |
ELE - Underground conduit  |
9/17/2017 4:11:13 PM  |
9/18/2017  |
12 PM - 3 PM  |
9/18/2017  |
P  |
GCT  |
MEC - Rough Duct  |
9/17/2017 4:11:52 PM  |
9/18/2017  |
12 PM - 3 PM  |
9/18/2017  |
P  |
GCT  |
ELE - Underground conduit  |
9/19/2017 2:57:00 PM  |
9/20/2017  |
  |
9/20/2017  |
P  |
BEN  |
MEC - Underground Rough  |
9/19/2017 2:57:44 PM  |
9/20/2017  |
  |
9/20/2017  |
C  |
BEN  |
PLM - Gas Test  |
9/19/2017 2:57:58 PM  |
9/20/2017  |
  |
9/20/2017  |
P  |
BEN  |
PLM - Ground/Underfloor water  |
9/19/2017 2:58:10 PM  |
9/20/2017  |
  |
9/20/2017  |
P  |
BEN  |
PLM - Sewer  |
9/19/2017 2:58:21 PM  |
9/20/2017  |
  |
9/20/2017  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
9/20/2017 3:24:08 PM  |
9/21/2017  |
8 AM - 12 PM  |
9/21/2017  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
9/20/2017 3:24:26 PM  |
9/21/2017  |
8 AM - 12 PM  |
9/21/2017  |
C  |
BEN  |
PLM - Ground/Underfloor water  |
9/20/2017 3:24:49 PM  |
9/21/2017  |
8 AM - 12 PM  |
9/21/2017  |
C  |
BEN  |
ELE - Underground conduit  |
9/25/2017 2:46:43 PM  |
9/26/2017  |
10 AM - 2 PM  |
9/26/2017  |
P  |
BEN  |
ELE - Underground conduit  |
9/26/2017 2:27:02 PM  |
9/27/2017  |
8 AM - 12 PM  |
9/27/2017  |
C  |
BEN  |
PLM - Ground/Underfloor waste  |
9/27/2017 1:41:58 PM  |
9/28/2017  |
8 AM - 12 PM  |
9/28/2017  |
P  |
JOS  |
PLM - Gas Test  |
9/27/2017 2:50:46 PM  |
9/28/2017  |
8 AM - 12 PM  |
9/28/2017  |
N  |
JOS  |
PLM - Underground gas  |
9/27/2017 2:51:09 PM  |
9/28/2017  |
8 AM - 12 PM  |
9/28/2017  |
N  |
JOS  |
PLM - Underground gas  |
9/28/2017 5:32:55 PM  |
9/29/2017  |
8 AM - 12 PM  |
9/29/2017  |
C  |
BEN  |
Approved: School Fees Due  |
10/4/2017  |
  |
  |
10/25/2017  |
APPR  |
CMN  |
Approved by Elec Engineering  |
10/4/2017  |
  |
  |
10/20/2017 9:36:00 AM  |
APPR  |
JJB  |
Route to Elec Engineering  |
10/4/2017  |
10/20/2017  |
  |
10/20/2017  |
APPR  |
JJB  |
Approved by Electrical  |
10/4/2017  |
  |
  |
10/19/2017 3:16:28 PM  |
APPR  |
MCS  |
Route to Electrical  |
10/4/2017  |
10/20/2017  |
  |
10/19/2017  |
APPR  |
MCS  |
Approved by Mechanical  |
10/4/2017  |
  |
  |
10/20/2017 3:43:47 PM  |
APPR  |
GAQ  |
Route to Mechanical  |
10/4/2017  |
10/20/2017  |
  |
10/20/2017  |
APPR  |
GAQ  |
Approved by Planning Zoning  |
10/4/2017  |
  |
  |
10/24/2017 10:46:35 AM  |
APPR  |
EYT  |
Route to Planning Zoning  |
10/4/2017  |
10/20/2017  |
  |
10/24/2017  |
APPR  |
EYT  |
Approved by Plumbing  |
10/4/2017  |
  |
  |
10/20/2017 3:43:37 PM  |
APPR  |
GAQ  |
Route to Plumbing  |
10/4/2017  |
10/20/2017  |
  |
10/20/2017  |
APPR  |
GAQ  |
Apprv. by PW Develop. Services  |
10/4/2017  |
  |
  |
10/24/2017 10:59:28 AM  |
APPR  |
SXA  |
Route to PW Develop. Services  |
10/4/2017  |
10/20/2017  |
  |
10/24/2017  |
APPR  |
SXA  |
Apprv. by Struct/Architectural  |
10/4/2017  |
  |
  |
10/23/2017 2:30:32 PM  |
APPR  |
CSG  |
Route to Struct/Architectual  |
10/4/2017  |
10/20/2017  |
  |
10/23/2017  |
APPR  |
CSG  |
Approved by Traffic Eng.  |
10/4/2017  |
  |
  |
10/23/2017 4:15:50 PM  |
APPR  |
RXC  |
Route to Traffic Engineering  |
10/4/2017  |
10/20/2017  |
  |
10/23/2017  |
APPR  |
RXC  |
Approved by Water Engineering  |
10/4/2017  |
  |
  |
10/23/2017 9:19:32 AM  |
APPR  |
DRS  |
Route to Water Engineering  |
10/4/2017  |
10/20/2017  |
  |
10/23/2017  |
APPR  |
DRS  |
PLM - Water Service  |
10/5/2017 4:12:43 PM  |
10/6/2017  |
8 AM - 12 PM  |
10/6/2017  |
P  |
JOS  |
MEC - Underground Rough  |
10/5/2017 4:13:00 PM  |
10/6/2017  |
8 AM - 12 PM  |
10/6/2017  |
C  |
JOS  |
BLD - Reinforcing Insp  |
10/8/2017  |
10/10/2017  |
12 PM - 3 PM  |
10/10/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
10/9/2017  |
10/10/2017  |
12 PM - 3 PM  |
10/10/2017  |
P  |
BEN  |
BLD - Pre-Slab Insp  |
10/9/2017 8:34:17 PM  |
10/10/2017  |
12 PM - 3 PM  |
10/10/2017  |
P  |
BEN  |
ELE - Underground conduit  |
10/9/2017 8:44:52 PM  |
10/10/2017  |
12 PM - 3 PM  |
10/10/2017  |
C  |
BEN  |
ELE - Underground conduit  |
10/10/2017 3:07:36 PM  |
10/11/2017  |
8 AM - 12 PM  |
10/11/2017  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
10/10/2017 3:07:57 PM  |
10/11/2017  |
8 AM - 12 PM  |
10/11/2017  |
P  |
BEN  |
ELE - Underground conduit  |
10/11/2017 3:55:36 PM  |
10/12/2017  |
12 PM - 3 PM  |
10/12/2017  |
C  |
BEN  |
PLM - Ground/Underfloor waste  |
10/11/2017 3:56:02 PM  |
10/12/2017  |
12 PM - 3 PM  |
10/12/2017  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
10/17/2017 6:25:35 PM  |
10/18/2017  |
12 PM - 3 PM  |
10/18/2017  |
N  |
BEN  |
BLD - Reinforcing Insp  |
10/17/2017 6:25:43 PM  |
10/18/2017  |
12 PM - 3 PM  |
10/18/2017  |
N  |
BEN  |
BLD - Pre-Slab Insp  |
10/18/2017 3:20:33 PM  |
10/19/2017  |
  |
10/19/2017  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
10/18/2017 3:21:06 PM  |
10/19/2017  |
  |
10/19/2017  |
P  |
BEN  |
PLM - Sewer  |
10/18/2017 3:21:43 PM  |
10/19/2017  |
  |
10/19/2017  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
10/19/2017 1:16:31 PM  |
10/20/2017  |
10 AM - 2 PM  |
10/20/2017  |
C  |
BEN  |
BLD - Reinforcing Insp  |
10/19/2017 1:16:38 PM  |
10/20/2017  |
10 AM - 2 PM  |
10/20/2017  |
C  |
BEN  |
ELE - Underground conduit  |
10/20/2017 2:28:30 PM  |
10/23/2017  |
10 AM - 2 PM  |
10/23/2017  |
P  |
GCT  |
BLD - Footings Insp  |
10/20/2017 2:53:33 PM  |
10/23/2017  |
10 AM - 2 PM  |
10/23/2017  |
N  |
GCT  |
BLD - Reinforcing Insp  |
10/20/2017 2:53:40 PM  |
10/23/2017  |
10 AM - 2 PM  |
10/23/2017  |
N  |
GCT  |
BLD - Reinforcing Insp  |
10/23/2017 1:52:44 PM  |
10/24/2017  |
10 AM - 2 PM  |
10/24/2017  |
P  |
GCT  |
BLD - Reinforcing Insp  |
10/24/2017 3:03:59 PM  |
10/25/2017  |
12 PM - 3 PM  |
10/25/2017  |
C  |
BEN  |
BLD - Footings Insp  |
10/25/2017 12:46:02 PM  |
10/26/2017  |
12 PM - 3 PM  |
10/26/2017  |
C  |
BEN  |
BLD - Footings Insp  |
10/26/2017 12:01:28 PM  |
10/27/2017  |
12 PM - 3 PM  |
10/27/2017  |
C  |
BEN  |
BLD - Footings Insp  |
10/29/2017 2:15:48 PM  |
10/30/2017  |
12 PM - 3 PM  |
10/30/2017  |
P  |
GCT  |
BLD - Pre-Slab Insp  |
10/29/2017 2:16:02 PM  |
10/30/2017  |
12 PM - 3 PM  |
10/30/2017  |
P  |
GCT  |
BLD - Footings Insp  |
10/30/2017 1:04:45 PM  |
10/31/2017  |
12 PM - 3 PM  |
10/31/2017  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
10/30/2017 1:04:53 PM  |
10/31/2017  |
12 PM - 3 PM  |
10/31/2017  |
C  |
BEN  |
BLD - Footings Insp  |
10/31/2017 1:57:45 PM  |
11/1/2017  |
12 PM - 3 PM  |
11/1/2017  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
10/31/2017 1:57:58 PM  |
11/1/2017  |
12 PM - 3 PM  |
11/1/2017  |
C  |
BEN  |
ELE - Underground conduit  |
10/31/2017 1:58:06 PM  |
11/1/2017  |
12 PM - 3 PM  |
11/1/2017  |
C  |
BEN  |
BLD - Footings Insp  |
11/1/2017 2:33:55 PM  |
11/2/2017  |
12 PM - 3 PM  |
11/2/2017  |
C  |
BEN  |
BLD - Reinforcing Insp  |
11/1/2017 2:34:52 PM  |
11/2/2017  |
12 PM - 3 PM  |
11/2/2017  |
C  |
BEN  |
ELE - Underground conduit  |
11/1/2017 2:35:21 PM  |
11/2/2017  |
12 PM - 3 PM  |
11/2/2017  |
C  |
BEN  |
BLD - Reinforcing Insp  |
11/2/2017 3:44:11 PM  |
11/3/2017  |
12 PM - 3 PM  |
11/3/2017  |
C  |
BEN  |
BLD - Footings Insp  |
11/2/2017 4:07:35 PM  |
11/3/2017  |
12 PM - 3 PM  |
11/3/2017  |
P  |
BEN  |
BLD - Footings Insp  |
11/5/2017 3:45:34 PM  |
11/6/2017  |
10 AM - 2 PM  |
11/6/2017  |
C  |
MMO  |
ELE - Underground conduit  |
11/5/2017 3:45:59 PM  |
11/6/2017  |
10 AM - 2 PM  |
11/6/2017  |
P  |
MMO  |
BLD - Footings Insp  |
11/6/2017 2:15:26 PM  |
11/7/2017  |
12 PM - 3 PM  |
11/7/2017  |
C  |
BEN  |
BLD - Footings Insp  |
11/7/2017 11:08:48 AM  |
11/8/2017  |
12 PM - 3 PM  |
11/8/2017  |
C  |
BEN  |
ELE - Underground conduit  |
11/7/2017 11:34:40 AM  |
11/8/2017  |
12 PM - 3 PM  |
11/8/2017  |
C  |
BEN  |
BLD - Footings Insp  |
11/8/2017 12:50:57 PM  |
11/9/2017  |
12 PM - 3 PM  |
11/9/2017  |
C  |
BEN  |
ELE - Underground conduit  |
11/8/2017 12:51:08 PM  |
11/9/2017  |
12 PM - 3 PM  |
11/9/2017  |
C  |
BEN  |
BLD - Footings Insp  |
11/12/2017 4:07:56 PM  |
11/13/2017  |
10 AM - 2 PM  |
11/13/2017  |
C  |
MMO  |
ELE - Underground conduit  |
11/12/2017 4:08:09 PM  |
11/13/2017  |
10 AM - 2 PM  |
11/13/2017  |
C  |
MMO  |
ELE - Underground conduit  |
11/13/2017 3:55:46 PM  |
11/14/2017  |
10 AM - 2 PM  |
11/14/2017  |
C  |
MMO  |
ELE - Ground Electrode/UFER  |
11/13/2017 3:55:58 PM  |
11/14/2017  |
10 AM - 2 PM  |
11/14/2017  |
P  |
MMO  |
BLD - Footings Insp  |
11/14/2017 3:19:25 PM  |
11/15/2017  |
12 PM - 3 PM  |
11/15/2017  |
C  |
BEN  |
ELE - Underground conduit  |
11/14/2017 3:19:37 PM  |
11/15/2017  |
12 PM - 3 PM  |
11/15/2017  |
C  |
BEN  |
BLD - Footings Insp  |
11/15/2017 2:02:11 PM  |
11/16/2017  |
12 PM - 3 PM  |
11/16/2017  |
N  |
BEN  |
Approved: Health Set Required  |
6/6/2017  |
  |
  |
8/1/2017  |
APPR  |
CMN  |
BLD - Footings Insp  |
11/16/2017 2:55:11 PM  |
11/17/2017  |
12 PM - 3 PM  |
11/17/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
11/28/2017 2:52:35 PM  |
11/29/2017  |
12 PM - 3 PM  |
11/29/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
11/30/2017 3:00:52 PM  |
12/1/2017  |
  |
12/1/2017  |
P  |
BEN  |
ELE - Underground conduit  |
12/1/2017 2:13:18 PM  |
12/4/2017  |
8 AM - 12 PM  |
12/4/2017  |
P  |
GCT  |
BLD - Reinforcing Insp  |
12/4/2017 3:21:23 PM  |
12/5/2017  |
12 PM - 3 PM  |
12/5/2017  |
P  |
BEN  |
ELE - Underground conduit  |
12/4/2017 3:21:31 PM  |
12/5/2017  |
12 PM - 3 PM  |
12/5/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
12/5/2017 2:23:55 PM  |
12/6/2017  |
  |
12/6/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
12/6/2017 3:18:48 PM  |
12/7/2017  |
12 PM - 3 PM  |
12/7/2017  |
C  |
BEN  |
BLD - Reinforcing Insp  |
12/8/2017  |
12/8/2017  |
12 PM - 3 PM  |
12/8/2017  |
P  |
BEN  |
ELE - Ground Electrode/UFER  |
12/8/2017 3:28:31 PM  |
12/11/2017  |
10 AM - 2 PM  |
12/11/2017  |
P  |
GCT  |
ELE - Ground Electrode/UFER  |
12/11/2017 2:54:26 PM  |
12/12/2017  |
12 PM - 3 PM  |
12/12/2017  |
P  |
BEN  |
BLD - Reinforcing Insp  |
12/13/2017 2:54:45 PM  |
12/14/2017  |
12 PM - 3 PM  |
12/14/2017  |
C  |
BEN  |
BLD - Footings Insp  |
12/13/2017 2:54:56 PM  |
12/14/2017  |
12 PM - 3 PM  |
12/14/2017  |
P  |
BEN  |
BLD - Pre-Slab Insp  |
12/17/2017 4:04:17 PM  |
12/18/2017  |
  |
12/18/2017  |
P  |
GCT  |
BLD - Pre-Slab Insp  |
12/20/2017 2:40:32 PM  |
12/21/2017  |
12 PM - 3 PM  |
12/21/2017  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
12/21/2017 1:44:34 PM  |
12/22/2017  |
8 AM - 12 PM  |
12/22/2017  |
C  |
BEN  |
MEC - Underground Rough  |
12/21/2017 1:44:52 PM  |
12/22/2017  |
8 AM - 12 PM  |
12/22/2017  |
P  |
BEN  |
BLD - Pre-Slab Insp  |
12/25/2017 8:47:17 AM  |
12/26/2017  |
10 AM - 2 PM  |
12/26/2017  |
P  |
GCT  |
BLD - Reinforcing Insp  |
1/2/2018 2:28:51 PM  |
1/3/2018  |
  |
1/3/2018  |
P  |
GCT  |
BLD - Footings Insp  |
1/2/2018 2:28:59 PM  |
1/3/2018  |
  |
1/3/2018  |
P  |
GCT  |
BLD - Footings Insp  |
1/3/2018 3:49:05 PM  |
1/4/2018  |
10 AM - 2 PM  |
1/4/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
1/3/2018 3:49:14 PM  |
1/4/2018  |
10 AM - 2 PM  |
1/4/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
1/4/2018 3:22:12 PM  |
1/5/2018  |
8 AM - 12 PM  |
1/5/2018  |
C  |
MMO  |
BLD - Footings Insp  |
1/4/2018 3:22:23 PM  |
1/5/2018  |
8 AM - 12 PM  |
1/5/2018  |
C  |
MMO  |
BLD - Reinforcing Insp  |
1/5/2018 2:12:33 PM  |
1/8/2018  |
8 AM - 12 PM  |
1/8/2018  |
N  |
GCT  |
BLD - Footings Insp  |
1/5/2018 2:12:44 PM  |
1/8/2018  |
8 AM - 12 PM  |
1/8/2018  |
N  |
GCT  |
BLD - Footings Insp  |
1/8/2018 1:12:50 PM  |
1/9/2018  |
12 PM - 3 PM  |
1/9/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
1/8/2018 1:12:58 PM  |
1/9/2018  |
12 PM - 3 PM  |
1/9/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
1/9/2018 1:33:04 PM  |
1/10/2018  |
12 PM - 3 PM  |
1/10/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
1/10/2018 2:20:31 PM  |
1/11/2018  |
12 PM - 3 PM  |
1/11/2018  |
P  |
BEN  |
BLD - Pre-Slab Insp  |
1/10/2018 2:20:38 PM  |
1/11/2018  |
12 PM - 3 PM  |
1/11/2018  |
C  |
BEN  |
ELE - Underground conduit  |
1/10/2018 2:20:52 PM  |
1/11/2018  |
12 PM - 3 PM  |
1/11/2018  |
P  |
BEN  |
ELE - Ground Electrode/UFER  |
1/10/2018 2:21:00 PM  |
1/11/2018  |
12 PM - 3 PM  |
1/11/2018  |
P  |
BEN  |
ELE - Ground Electrode/UFER  |
1/11/2018 9:30:46 AM  |
1/12/2018  |
12 PM - 3 PM  |
1/12/2018  |
C  |
BEN  |
ELE - Underground conduit  |
1/11/2018 9:31:11 AM  |
1/12/2018  |
12 PM - 3 PM  |
1/12/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
1/11/2018 4:21:37 PM  |
1/12/2018  |
12 PM - 3 PM  |
1/12/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
1/15/2018 1:56:06 PM  |
1/16/2018  |
8 AM - 12 PM  |
1/16/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
1/16/2018 2:36:03 PM  |
1/17/2018  |
12 PM - 3 PM  |
1/17/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
1/18/2018 2:40:00 PM  |
1/19/2018  |
12 PM - 3 PM  |
1/19/2018  |
P  |
BEN  |
BLD - Pre-Slab Insp  |
1/22/2018  |
1/22/2018  |
8 AM - 12 PM  |
1/22/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
1/22/2018 3:21:22 PM  |
1/23/2018  |
8 AM - 12 PM  |
1/23/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
1/23/2018 2:29:06 PM  |
1/24/2018  |
12 PM - 3 PM  |
1/24/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
1/31/2018 3:33:35 PM  |
2/1/2018  |
12 PM - 3 PM  |
2/1/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
2/1/2018 3:11:07 PM  |
2/2/2018  |
12 PM - 3 PM  |
2/2/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
2/2/2018 2:13:42 PM  |
2/5/2018  |
10 AM - 2 PM  |
2/5/2018  |
C  |
BEN  |
ELE - Underground conduit  |
2/5/2018 1:33:39 PM  |
2/6/2018  |
10 AM - 2 PM  |
2/6/2018  |
C  |
BCJ  |
BLD - Reinforcing Insp  |
2/5/2018 2:19:21 PM  |
2/6/2018  |
10 AM - 2 PM  |
2/6/2018  |
C  |
BCJ  |
BLD - Footings Insp  |
2/5/2018 3:06:05 PM  |
2/6/2018  |
10 AM - 2 PM  |
2/6/2018  |
C  |
BCJ  |
BLD - Reinforcing Insp  |
2/6/2018 2:50:46 PM  |
2/7/2018  |
12 PM - 3 PM  |
2/7/2018  |
C  |
BEN  |
ELE - Underground conduit  |
2/6/2018 2:51:02 PM  |
2/7/2018  |
12 PM - 3 PM  |
2/7/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
2/6/2018 2:51:09 PM  |
2/7/2018  |
12 PM - 3 PM  |
2/7/2018  |
C  |
BEN  |
BLD -Floor Joists/Girders Insp  |
2/6/2018 2:51:21 PM  |
2/7/2018  |
12 PM - 3 PM  |
2/7/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
2/7/2018 3:44:23 PM  |
2/8/2018  |
8 AM - 12 PM  |
2/8/2018  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
2/7/2018 3:44:31 PM  |
2/8/2018  |
8 AM - 12 PM  |
2/8/2018  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
2/8/2018 3:25:43 PM  |
2/9/2018  |
12 PM - 3 PM  |
2/9/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
2/8/2018 7:38:28 PM  |
2/9/2018  |
12 PM - 3 PM  |
2/9/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
2/9/2018 2:31:43 PM  |
2/12/2018  |
  |
2/12/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
2/12/2018 2:57:48 PM  |
2/13/2018  |
12 PM - 3 PM  |
2/13/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
2/13/2018 3:14:46 PM  |
2/14/2018  |
12 PM - 3 PM  |
2/14/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
2/13/2018 3:14:53 PM  |
2/14/2018  |
12 PM - 3 PM  |
2/14/2018  |
P  |
BEN  |
PLM - Rough/Topout  |
2/13/2018 3:15:20 PM  |
2/14/2018  |
12 PM - 3 PM  |
2/14/2018  |
N  |
BEN  |
PLM - Ground/Underfloor waste  |
2/13/2018 3:15:37 PM  |
2/14/2018  |
12 PM - 3 PM  |
2/14/2018  |
P  |
BEN  |
BLD - Footings Insp  |
2/14/2018 3:33:21 PM  |
2/15/2018  |
12 PM - 3 PM  |
2/15/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
2/14/2018 3:33:30 PM  |
2/15/2018  |
12 PM - 3 PM  |
2/15/2018  |
C  |
BEN  |
BLD -Floor Joists/Girders Insp  |
2/14/2018 3:33:42 PM  |
2/15/2018  |
12 PM - 3 PM  |
2/15/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
2/14/2018 3:34:36 PM  |
2/15/2018  |
12 PM - 3 PM  |
2/15/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
2/15/2018 2:41:21 PM  |
2/16/2018  |
12 PM - 3 PM  |
2/16/2018  |
P  |
BEN  |
BLD -Floor Joists/Girders Insp  |
2/15/2018 2:41:53 PM  |
2/16/2018  |
12 PM - 3 PM  |
2/16/2018  |
C  |
BEN  |
MEC - Rough Mechanical  |
2/15/2018 2:42:11 PM  |
2/16/2018  |
12 PM - 3 PM  |
2/16/2018  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
2/15/2018 2:42:22 PM  |
2/16/2018  |
12 PM - 3 PM  |
2/16/2018  |
P  |
BEN  |
PLM - Ground/Underfloor water  |
2/15/2018 2:43:24 PM  |
2/16/2018  |
12 PM - 3 PM  |
2/16/2018  |
P  |
BEN  |
PLM - Rough/Topout  |
2/15/2018 2:45:10 PM  |
2/16/2018  |
12 PM - 3 PM  |
2/16/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
2/15/2018 2:45:25 PM  |
2/16/2018  |
12 PM - 3 PM  |
2/16/2018  |
N  |
BEN  |
BLD - Footings Insp  |
2/15/2018 8:06:10 PM  |
2/16/2018  |
12 PM - 3 PM  |
2/16/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
2/20/2018  |
2/20/2018  |
10 AM - 2 PM  |
2/20/2018  |
P  |
GCT  |
ELE - Underground conduit  |
2/20/2018  |
2/20/2018  |
10 AM - 2 PM  |
2/20/2018  |
P  |
GCT  |
PLM - Ground/Underfloor waste  |
2/20/2018  |
2/20/2018  |
10 AM - 2 PM  |
2/20/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
2/20/2018  |
2/21/2018  |
8 AM - 12 PM  |
2/21/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
2/20/2018  |
2/21/2018  |
8 AM - 12 PM  |
2/21/2018  |
P  |
GCT  |
BLD - Pre-Slab Insp  |
2/20/2018  |
2/21/2018  |
8 AM - 12 PM  |
2/21/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
2/21/2018 12:02:05 PM  |
2/22/2018  |
12 PM - 3 PM  |
2/22/2018  |
P  |
BEN  |
MEC - Rough Mechanical  |
2/21/2018 12:02:26 PM  |
2/22/2018  |
12 PM - 3 PM  |
2/22/2018  |
P  |
BEN  |
MEC - Gas Test  |
2/21/2018 12:02:40 PM  |
2/22/2018  |
12 PM - 3 PM  |
2/22/2018  |
C  |
BEN  |
PLM - Rough/Topout  |
2/21/2018 12:03:03 PM  |
2/22/2018  |
12 PM - 3 PM  |
2/22/2018  |
C  |
BEN  |
PLM - Ground/Underfloor waste  |
2/21/2018 12:04:04 PM  |
2/22/2018  |
12 PM - 3 PM  |
2/22/2018  |
P  |
BEN  |
ELE - Underground conduit  |
2/21/2018 3:08:56 PM  |
2/22/2018  |
12 PM - 3 PM  |
2/22/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
2/22/2018 11:28:38 AM  |
2/23/2018  |
12 PM - 3 PM  |
2/23/2018  |
C  |
BEN  |
PLM - Ground/Underfloor water  |
2/28/2018 3:13:07 PM  |
3/1/2018  |
12 PM - 3 PM  |
3/1/2018  |
P  |
BEN  |
MEC - Rough Mechanical  |
2/28/2018 3:13:55 PM  |
3/1/2018  |
12 PM - 3 PM  |
3/1/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
3/1/2018 2:30:17 PM  |
3/2/2018  |
12 PM - 3 PM  |
3/2/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/1/2018 2:30:24 PM  |
3/2/2018  |
12 PM - 3 PM  |
3/2/2018  |
C  |
BEN  |
MEC - Rough Mechanical  |
3/1/2018 2:30:35 PM  |
3/2/2018  |
12 PM - 3 PM  |
3/2/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
3/2/2018 2:19:03 PM  |
3/5/2018  |
  |
3/5/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
3/2/2018 2:19:13 PM  |
3/5/2018  |
  |
3/5/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
3/5/2018 2:46:13 PM  |
3/6/2018  |
  |
3/6/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/5/2018 2:46:20 PM  |
3/6/2018  |
  |
3/6/2018  |
C  |
BEN  |
PLM - Ground/Underfloor waste  |
3/6/2018 11:09:33 AM  |
3/7/2018  |
12 PM - 3 PM  |
3/7/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
3/7/2018 1:07:28 PM  |
3/8/2018  |
12 PM - 3 PM  |
3/8/2018  |
P  |
BEN  |
PLM - Rough/Topout  |
3/7/2018 1:08:41 PM  |
3/8/2018  |
12 PM - 3 PM  |
3/8/2018  |
C  |
BEN  |
PLM - Underground gas  |
3/7/2018 3:42:57 PM  |
3/8/2018  |
12 PM - 3 PM  |
3/8/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
3/8/2018 11:05:41 AM  |
3/9/2018  |
12 PM - 3 PM  |
3/9/2018  |
N  |
BEN  |
BLD - Framing Insp.  |
3/9/2018 1:51:29 PM  |
3/12/2018  |
12 PM - 3 PM  |
3/12/2018  |
N  |
GCT  |
BLD - Drywall Inspection  |
3/9/2018 1:51:48 PM  |
3/12/2018  |
12 PM - 3 PM  |
3/12/2018  |
N  |
GCT  |
BLD - Framing Insp.  |
3/12/2018 1:54:06 PM  |
3/13/2018  |
12 PM - 3 PM  |
3/13/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
3/12/2018 1:54:15 PM  |
3/13/2018  |
12 PM - 3 PM  |
3/13/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
3/12/2018 1:54:24 PM  |
3/13/2018  |
12 PM - 3 PM  |
3/13/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
3/12/2018 1:54:32 PM  |
3/13/2018  |
12 PM - 3 PM  |
3/13/2018  |
C  |
BEN  |
BLD - Penetrations -Fire Rated  |
3/12/2018 1:55:01 PM  |
3/13/2018  |
12 PM - 3 PM  |
3/13/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
3/12/2018 1:55:24 PM  |
3/13/2018  |
12 PM - 3 PM  |
3/13/2018  |
C  |
BEN  |
MEC - Rough Duct  |
3/12/2018 1:59:29 PM  |
3/13/2018  |
12 PM - 3 PM  |
3/13/2018  |
C  |
BEN  |
MEC - Rough Mechanical  |
3/12/2018 2:29:34 PM  |
3/13/2018  |
12 PM - 3 PM  |
3/13/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
3/13/2018 2:20:05 PM  |
3/14/2018  |
12 PM - 3 PM  |
3/14/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/13/2018 2:20:11 PM  |
3/14/2018  |
12 PM - 3 PM  |
3/14/2018  |
C  |
BEN  |
ELE - Ground Electrode/UFER  |
3/13/2018 2:20:19 PM  |
3/14/2018  |
12 PM - 3 PM  |
3/14/2018  |
P  |
BEN  |
MEC - Rough Mechanical  |
3/13/2018 2:20:34 PM  |
3/14/2018  |
12 PM - 3 PM  |
3/14/2018  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
3/13/2018 2:20:46 PM  |
3/14/2018  |
12 PM - 3 PM  |
3/14/2018  |
P  |
BEN  |
PLM - Ground/Underfloor water  |
3/13/2018 2:20:54 PM  |
3/14/2018  |
12 PM - 3 PM  |
3/14/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
3/14/2018 11:40:53 AM  |
3/15/2018  |
12 PM - 3 PM  |
3/15/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/14/2018 11:41:01 AM  |
3/15/2018  |
12 PM - 3 PM  |
3/15/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
3/14/2018 11:41:09 AM  |
3/15/2018  |
12 PM - 3 PM  |
3/15/2018  |
C  |
BEN  |
ELE - Underground conduit  |
3/14/2018 2:39:49 PM  |
3/15/2018  |
12 PM - 3 PM  |
3/15/2018  |
C  |
BEN  |
PLM - Ground/Underfloor waste  |
3/14/2018 2:40:04 PM  |
3/15/2018  |
12 PM - 3 PM  |
3/15/2018  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
3/16/2018 12:24:37 PM  |
3/19/2018  |
8 AM - 12 PM  |
3/19/2018  |
P  |
GCT  |
PLM - Ground/Underfloor water  |
3/16/2018 12:24:49 PM  |
3/19/2018  |
8 AM - 12 PM  |
3/19/2018  |
P  |
GCT  |
BLD - Footings Insp  |
3/19/2018 2:33:44 PM  |
3/20/2018  |
8 AM - 12 PM  |
3/20/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
3/19/2018 2:40:29 PM  |
3/20/2018  |
8 AM - 12 PM  |
3/20/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/20/2018 4:10:45 PM  |
3/21/2018  |
10 AM - 2 PM  |
3/21/2018  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
3/20/2018 4:11:01 PM  |
3/21/2018  |
10 AM - 2 PM  |
3/21/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
3/22/2018 2:19:45 PM  |
3/23/2018  |
8 AM - 12 PM  |
3/23/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/22/2018 2:21:24 PM  |
3/23/2018  |
8 AM - 12 PM  |
3/23/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
3/23/2018 2:53:09 PM  |
3/26/2018  |
10 AM - 2 PM  |
3/26/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
3/23/2018 2:53:27 PM  |
3/26/2018  |
10 AM - 2 PM  |
3/26/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
3/23/2018 2:54:00 PM  |
3/26/2018  |
10 AM - 2 PM  |
3/26/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
3/26/2018 1:14:53 PM  |
3/27/2018  |
8 AM - 12 PM  |
3/27/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/26/2018 1:15:01 PM  |
3/27/2018  |
8 AM - 12 PM  |
3/27/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
3/26/2018 1:15:10 PM  |
3/27/2018  |
8 AM - 12 PM  |
3/27/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
3/27/2018 2:27:49 PM  |
3/28/2018  |
8 AM - 12 PM  |
3/28/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/27/2018 2:27:55 PM  |
3/28/2018  |
8 AM - 12 PM  |
3/28/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
3/27/2018 2:28:07 PM  |
3/28/2018  |
8 AM - 12 PM  |
3/28/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
3/28/2018 2:17:57 PM  |
3/29/2018  |
10 AM - 2 PM  |
3/29/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/28/2018 2:18:08 PM  |
3/29/2018  |
10 AM - 2 PM  |
3/29/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
3/28/2018 2:18:24 PM  |
3/29/2018  |
10 AM - 2 PM  |
3/29/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
3/29/2018 1:43:21 PM  |
3/30/2018  |
12 PM - 3 PM  |
3/30/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/29/2018 1:43:28 PM  |
3/30/2018  |
12 PM - 3 PM  |
3/30/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
3/29/2018 1:43:39 PM  |
3/30/2018  |
12 PM - 3 PM  |
3/30/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
3/30/2018 11:30:50 AM  |
4/2/2018  |
8 AM - 12 PM  |
4/2/2018  |
C  |
JOS  |
BLD - Drywall Inspection  |
3/30/2018 11:30:57 AM  |
4/2/2018  |
8 AM - 12 PM  |
4/2/2018  |
C  |
JOS  |
ELE - Rough Electrical  |
3/30/2018 11:31:05 AM  |
4/2/2018  |
8 AM - 12 PM  |
4/2/2018  |
F  |
JOS  |
BLD - Framing Insp.  |
4/2/2018 3:27:23 PM  |
4/3/2018  |
10 AM - 2 PM  |
4/3/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
4/2/2018 3:27:33 PM  |
4/3/2018  |
10 AM - 2 PM  |
4/3/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
4/2/2018 3:27:43 PM  |
4/3/2018  |
10 AM - 2 PM  |
4/3/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
4/3/2018 3:10:57 PM  |
4/4/2018  |
10 AM - 2 PM  |
4/4/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
4/3/2018 3:11:03 PM  |
4/4/2018  |
10 AM - 2 PM  |
4/4/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
4/3/2018 3:11:20 PM  |
4/4/2018  |
10 AM - 2 PM  |
4/4/2018  |
C  |
BEN  |
MEC - Rough Duct  |
4/3/2018 3:11:33 PM  |
4/4/2018  |
10 AM - 2 PM  |
4/4/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
4/4/2018 2:12:22 PM  |
4/5/2018  |
12 PM - 3 PM  |
4/5/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
4/4/2018 2:12:28 PM  |
4/5/2018  |
12 PM - 3 PM  |
4/5/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
4/4/2018 2:13:02 PM  |
4/5/2018  |
12 PM - 3 PM  |
4/5/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
4/6/2018 1:47:39 PM  |
4/9/2018  |
10 AM - 2 PM  |
4/9/2018  |
C  |
JOS  |
BLD - Drywall Inspection  |
4/6/2018 1:47:45 PM  |
4/9/2018  |
10 AM - 2 PM  |
4/9/2018  |
C  |
JOS  |
ELE - Rough Electrical  |
4/6/2018 1:47:59 PM  |
4/9/2018  |
10 AM - 2 PM  |
4/9/2018  |
C  |
JOS  |
MEC - Rough Duct  |
4/10/2018 2:14:15 PM  |
4/11/2018  |
12 PM - 3 PM  |
4/11/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
4/12/2018 12:01:42 PM  |
4/13/2018  |
8 AM - 12 PM  |
4/13/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
4/12/2018 1:24:55 PM  |
4/13/2018  |
8 AM - 12 PM  |
4/13/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
4/13/2018 11:55:11 AM  |
4/16/2018  |
  |
4/16/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
4/13/2018 11:55:22 AM  |
4/16/2018  |
  |
4/16/2018  |
P  |
GCT  |
MEC - Rough Duct  |
4/17/2018 2:48:44 PM  |
4/18/2018  |
8 AM - 12 PM  |
4/18/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
4/18/2018 1:43:14 PM  |
4/19/2018  |
8 AM - 12 PM  |
4/19/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
4/18/2018 1:44:11 PM  |
4/19/2018  |
8 AM - 12 PM  |
4/19/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
4/18/2018 1:44:20 PM  |
4/19/2018  |
8 AM - 12 PM  |
4/19/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
4/19/2018 3:04:55 PM  |
4/20/2018  |
10 AM - 2 PM  |
4/20/2018  |
C  |
JOS  |
ELE - Rough Electrical  |
4/19/2018 3:05:17 PM  |
4/20/2018  |
10 AM - 2 PM  |
4/20/2018  |
C  |
JOS  |
BLD - Framing Insp.  |
4/20/2018 1:42:29 PM  |
4/23/2018  |
10 AM - 2 PM  |
4/23/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
4/20/2018 1:42:36 PM  |
4/23/2018  |
10 AM - 2 PM  |
4/23/2018  |
P  |
GCT  |
BLD - Penetrations -Fire Rated  |
4/20/2018 1:42:50 PM  |
4/23/2018  |
10 AM - 2 PM  |
4/23/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
4/20/2018 1:43:01 PM  |
4/23/2018  |
10 AM - 2 PM  |
4/23/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
4/23/2018 2:16:16 PM  |
4/24/2018  |
10 AM - 2 PM  |
4/24/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
4/23/2018 2:16:43 PM  |
4/24/2018  |
10 AM - 2 PM  |
4/24/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
4/24/2018 2:40:36 PM  |
4/25/2018  |
10 AM - 2 PM  |
4/25/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
4/24/2018 2:40:45 PM  |
4/25/2018  |
10 AM - 2 PM  |
4/25/2018  |
P  |
GCT  |
PLM - Ground/Underfloor waste  |
4/25/2018 2:22:15 PM  |
4/26/2018  |
8 AM - 12 PM  |
4/26/2018  |
P  |
JOS  |
MEC - Underground Rough  |
4/25/2018 2:22:24 PM  |
4/26/2018  |
8 AM - 12 PM  |
4/26/2018  |
C  |
JOS  |
BLD - Framing Insp.  |
4/26/2018 1:35:28 PM  |
4/27/2018  |
8 AM - 12 PM  |
4/27/2018  |
P  |
MMO  |
ELE - Rough Electrical  |
4/26/2018 1:36:28 PM  |
4/27/2018  |
8 AM - 12 PM  |
4/27/2018  |
P  |
MMO  |
PLM - Ground/Underfloor waste  |
4/26/2018 1:36:37 PM  |
4/27/2018  |
8 AM - 12 PM  |
4/27/2018  |
P  |
MMO  |
MEC - Rough Mechanical  |
4/26/2018 1:36:51 PM  |
4/27/2018  |
8 AM - 12 PM  |
4/27/2018  |
P  |
MMO  |
BLD - Framing Insp.  |
4/27/2018 3:02:33 PM  |
4/30/2018  |
10 AM - 2 PM  |
4/30/2018  |
P  |
GCT  |
BLD - Roof Sheathing Insp.  |
4/27/2018 3:02:49 PM  |
4/30/2018  |
10 AM - 2 PM  |
4/30/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
4/27/2018 3:03:06 PM  |
4/30/2018  |
10 AM - 2 PM  |
4/30/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
4/27/2018 3:03:21 PM  |
4/30/2018  |
10 AM - 2 PM  |
4/30/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
4/30/2018 2:29:22 PM  |
5/1/2018  |
10 AM - 2 PM  |
5/1/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
4/30/2018 2:29:30 PM  |
5/1/2018  |
10 AM - 2 PM  |
5/1/2018  |
P  |
GCT  |
PLM - Ground/Underfloor waste  |
4/30/2018 2:29:40 PM  |
5/1/2018  |
10 AM - 2 PM  |
5/1/2018  |
P  |
GCT  |
PLM - Ground/Underfloor water  |
4/30/2018 2:29:47 PM  |
5/1/2018  |
10 AM - 2 PM  |
5/1/2018  |
P  |
GCT  |
BLD - Roof Sheathing Insp.  |
5/3/2018 2:47:57 PM  |
5/4/2018  |
8 AM - 12 PM  |
5/4/2018  |
P  |
MMO  |
BLD - Framing Insp.  |
5/7/2018 1:17:02 PM  |
5/8/2018  |
8 AM - 12 PM  |
5/8/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
5/7/2018 3:12:05 PM  |
5/8/2018  |
8 AM - 12 PM  |
5/8/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
5/8/2018 12:47:25 PM  |
5/9/2018  |
12 PM - 3 PM  |
5/9/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
5/8/2018 12:47:32 PM  |
5/9/2018  |
12 PM - 3 PM  |
5/9/2018  |
N  |
BEN  |
BLD - Reinforcing Insp  |
5/8/2018 12:47:44 PM  |
5/9/2018  |
12 PM - 3 PM  |
5/9/2018  |
N  |
BEN  |
BLD - Framing Insp.  |
5/9/2018 2:48:47 PM  |
5/10/2018  |
8 AM - 12 PM  |
5/10/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
5/9/2018 2:48:55 PM  |
5/10/2018  |
8 AM - 12 PM  |
5/10/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
5/10/2018 3:17:29 PM  |
5/11/2018  |
12 PM - 3 PM  |
5/11/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
5/10/2018 3:17:36 PM  |
5/11/2018  |
12 PM - 3 PM  |
5/11/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
5/10/2018 3:17:44 PM  |
5/11/2018  |
12 PM - 3 PM  |
5/11/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
5/10/2018 3:17:50 PM  |
5/11/2018  |
12 PM - 3 PM  |
5/11/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
5/11/2018 1:19:58 PM  |
5/14/2018  |
8 AM - 12 PM  |
5/14/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
5/11/2018 1:20:05 PM  |
5/14/2018  |
8 AM - 12 PM  |
5/14/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
5/11/2018 1:20:17 PM  |
5/14/2018  |
8 AM - 12 PM  |
5/14/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
5/11/2018 1:20:24 PM  |
5/14/2018  |
8 AM - 12 PM  |
5/14/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
5/14/2018 2:43:15 PM  |
5/15/2018  |
8 AM - 12 PM  |
5/15/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
5/14/2018 2:43:24 PM  |
5/15/2018  |
8 AM - 12 PM  |
5/15/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
5/14/2018 2:43:36 PM  |
5/15/2018  |
8 AM - 12 PM  |
5/15/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
5/15/2018 1:57:05 PM  |
5/16/2018  |
12 PM - 3 PM  |
5/16/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
5/15/2018 1:57:17 PM  |
5/16/2018  |
12 PM - 3 PM  |
5/16/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
5/16/2018 2:35:28 PM  |
5/17/2018  |
8 AM - 12 PM  |
5/17/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
5/16/2018 8:25:55 PM  |
5/17/2018  |
8 AM - 12 PM  |
5/17/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
5/16/2018 8:26:26 PM  |
5/17/2018  |
8 AM - 12 PM  |
5/17/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
5/17/2018 2:35:18 PM  |
5/18/2018  |
12 PM - 3 PM  |
5/18/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
5/18/2018 1:24:31 PM  |
5/21/2018  |
8 AM - 12 PM  |
5/21/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
5/18/2018 1:24:40 PM  |
5/21/2018  |
8 AM - 12 PM  |
5/21/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
5/21/2018 2:02:25 PM  |
5/22/2018  |
12 PM - 3 PM  |
5/22/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
5/21/2018 2:02:32 PM  |
5/22/2018  |
12 PM - 3 PM  |
5/22/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
5/21/2018 2:02:57 PM  |
5/22/2018  |
12 PM - 3 PM  |
5/22/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
5/22/2018 2:36:58 PM  |
5/23/2018  |
12 PM - 3 PM  |
5/24/2018  |
C  |
MMO  |
BLD - Exterior Lath Insp  |
5/22/2018 2:37:36 PM  |
5/23/2018  |
12 PM - 3 PM  |
5/24/2018  |
C  |
MMO  |
BLD - Framing Insp.  |
5/22/2018 2:37:49 PM  |
5/23/2018  |
12 PM - 3 PM  |
5/24/2018  |
P  |
MMO  |
BLD - Reinforcing Insp  |
5/23/2018 5:42:35 AM  |
5/24/2018  |
  |
5/24/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
5/23/2018 5:42:43 AM  |
5/24/2018  |
  |
5/24/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
5/23/2018 5:42:50 AM  |
5/24/2018  |
  |
5/24/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
5/23/2018 5:43:02 AM  |
5/24/2018  |
  |
5/24/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
5/24/2018 2:47:07 PM  |
5/25/2018  |
  |
5/25/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
5/25/2018 11:22:55 AM  |
5/29/2018  |
8 AM - 12 PM  |
5/29/2018  |
C  |
MMO  |
BLD - Framing Insp.  |
5/25/2018 11:23:04 AM  |
5/29/2018  |
8 AM - 12 PM  |
5/29/2018  |
C  |
MMO  |
BLD - Framing Insp.  |
5/29/2018  |
5/30/2018  |
  |
5/30/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
5/29/2018  |
5/30/2018  |
  |
5/30/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
5/30/2018 10:12:52 AM  |
5/31/2018  |
12 PM - 3 PM  |
5/31/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
5/30/2018 10:12:59 AM  |
5/31/2018  |
12 PM - 3 PM  |
5/31/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
5/30/2018 10:13:06 AM  |
5/31/2018  |
12 PM - 3 PM  |
5/31/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
5/31/2018 2:28:43 PM  |
6/1/2018  |
8 AM - 12 PM  |
6/1/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
5/31/2018 2:28:49 PM  |
6/1/2018  |
8 AM - 12 PM  |
6/1/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
5/31/2018 2:28:59 PM  |
6/1/2018  |
8 AM - 12 PM  |
6/1/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
5/31/2018 2:29:08 PM  |
6/1/2018  |
8 AM - 12 PM  |
6/1/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
6/1/2018 2:36:50 PM  |
6/4/2018  |
  |
6/4/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
6/1/2018 2:43:31 PM  |
6/4/2018  |
  |
6/4/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
6/1/2018 2:43:37 PM  |
6/4/2018  |
  |
6/4/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
6/1/2018 2:43:48 PM  |
6/4/2018  |
  |
6/4/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
6/1/2018 5:30:52 PM  |
6/4/2018  |
  |
6/4/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
6/4/2018 3:25:28 PM  |
6/5/2018  |
10 AM - 2 PM  |
6/5/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/4/2018 3:25:37 PM  |
6/5/2018  |
10 AM - 2 PM  |
6/5/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
6/4/2018 3:25:44 PM  |
6/5/2018  |
10 AM - 2 PM  |
6/5/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/4/2018 3:26:34 PM  |
6/5/2018  |
10 AM - 2 PM  |
6/5/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
6/5/2018 2:42:04 PM  |
6/6/2018  |
10 AM - 2 PM  |
6/6/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
6/5/2018 2:42:09 PM  |
6/6/2018  |
10 AM - 2 PM  |
6/6/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
6/5/2018 2:42:18 PM  |
6/6/2018  |
10 AM - 2 PM  |
6/6/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
6/5/2018 2:42:27 PM  |
6/6/2018  |
10 AM - 2 PM  |
6/6/2018  |
C  |
BEN  |
BLD -Floor Joists/Girders Insp  |
6/6/2018 1:51:58 PM  |
6/7/2018  |
8 AM - 12 PM  |
6/7/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/6/2018 1:52:12 PM  |
6/7/2018  |
8 AM - 12 PM  |
6/7/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/6/2018 1:52:23 PM  |
6/7/2018  |
8 AM - 12 PM  |
6/7/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/6/2018 1:52:30 PM  |
6/7/2018  |
8 AM - 12 PM  |
6/7/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
6/6/2018 1:52:37 PM  |
6/7/2018  |
8 AM - 12 PM  |
6/7/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
6/7/2018 3:11:24 PM  |
6/8/2018  |
10 AM - 2 PM  |
6/8/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/7/2018 3:11:34 PM  |
6/8/2018  |
10 AM - 2 PM  |
6/8/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
6/7/2018 3:11:40 PM  |
6/8/2018  |
10 AM - 2 PM  |
6/8/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/7/2018 3:11:49 PM  |
6/8/2018  |
10 AM - 2 PM  |
6/8/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/7/2018 3:12:01 PM  |
6/8/2018  |
10 AM - 2 PM  |
6/8/2018  |
P  |
BEN  |
BLD -Floor Joists/Girders Insp  |
6/7/2018 3:12:15 PM  |
6/8/2018  |
10 AM - 2 PM  |
6/8/2018  |
C  |
BEN  |
Approved Alternate MatL/Method  |
6/7/2018  |
  |
  |
6/29/2018  |
DONE  |
CSG  |
Route To Alternate MatL/Method  |
6/7/2018  |
6/26/2018  |
  |
6/13/2018  |
CORR  |
CSG  |
BLD - Reinforcing Insp  |
6/8/2018 2:02:47 PM  |
6/11/2018  |
  |
6/11/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
6/8/2018 2:03:00 PM  |
6/11/2018  |
  |
6/11/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
6/8/2018 2:03:12 PM  |
6/11/2018  |
  |
6/11/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
6/8/2018 2:03:19 PM  |
6/11/2018  |
  |
6/11/2018  |
P  |
GCT  |
BLD - Insulation Insp  |
6/8/2018 2:03:34 PM  |
6/11/2018  |
  |
6/11/2018  |
P  |
GCT  |
BLD - T-Bar (Structural) Insp  |
6/8/2018 2:03:43 PM  |
6/11/2018  |
  |
6/11/2018  |
N  |
GCT  |
ELE - Rough Electrical  |
6/8/2018 2:03:51 PM  |
6/11/2018  |
  |
6/11/2018  |
P  |
GCT  |
BLD -Floor Joists/Girders Insp  |
6/8/2018 2:04:09 PM  |
6/11/2018  |
  |
6/11/2018  |
N  |
GCT  |
BLD - Reinforcing Insp  |
6/11/2018 3:03:53 PM  |
6/12/2018  |
10 AM - 2 PM  |
6/12/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/11/2018 3:04:02 PM  |
6/12/2018  |
10 AM - 2 PM  |
6/12/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
6/11/2018 3:04:06 PM  |
6/12/2018  |
10 AM - 2 PM  |
6/12/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/11/2018 3:04:12 PM  |
6/12/2018  |
10 AM - 2 PM  |
6/12/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
6/11/2018 3:04:26 PM  |
6/12/2018  |
10 AM - 2 PM  |
6/12/2018  |
C  |
BEN  |
BLD -Floor Joists/Girders Insp  |
6/11/2018 3:04:41 PM  |
6/12/2018  |
10 AM - 2 PM  |
6/12/2018  |
C  |
BEN  |
BLD - Insulation Insp  |
6/11/2018 5:09:08 PM  |
6/12/2018  |
10 AM - 2 PM  |
6/12/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
6/12/2018 2:16:29 PM  |
6/13/2018  |
12 PM - 3 PM  |
6/13/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
6/12/2018 2:16:40 PM  |
6/13/2018  |
12 PM - 3 PM  |
6/13/2018  |
N  |
BEN  |
BLD - Drywall Inspection  |
6/12/2018 2:16:45 PM  |
6/13/2018  |
12 PM - 3 PM  |
6/13/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/12/2018 2:16:55 PM  |
6/13/2018  |
12 PM - 3 PM  |
6/13/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/12/2018 2:17:15 PM  |
6/13/2018  |
12 PM - 3 PM  |
6/13/2018  |
C  |
BEN  |
BLD -Floor Joists/Girders Insp  |
6/12/2018 2:17:39 PM  |
6/13/2018  |
12 PM - 3 PM  |
6/13/2018  |
P  |
BEN  |
Route To Alternate MatL/Method  |
  |
  |
  |
6/29/2018  |
APPR  |
CSG  |
BLD - Framing Insp.  |
6/13/2018 2:47:50 PM  |
6/14/2018  |
12 PM - 3 PM  |
6/14/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
6/13/2018 2:47:57 PM  |
6/14/2018  |
12 PM - 3 PM  |
6/14/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/13/2018 2:48:05 PM  |
6/14/2018  |
12 PM - 3 PM  |
6/14/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/13/2018 2:48:19 PM  |
6/14/2018  |
12 PM - 3 PM  |
6/14/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/14/2018 4:01:33 PM  |
6/15/2018  |
8 AM - 12 PM  |
6/15/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
6/14/2018 4:01:53 PM  |
6/15/2018  |
8 AM - 12 PM  |
6/15/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/14/2018 4:02:01 PM  |
6/15/2018  |
8 AM - 12 PM  |
6/15/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/14/2018 4:02:26 PM  |
6/15/2018  |
8 AM - 12 PM  |
6/15/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/15/2018 10:50:23 AM  |
6/18/2018  |
10 AM - 2 PM  |
6/18/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
6/15/2018 10:50:28 AM  |
6/18/2018  |
10 AM - 2 PM  |
6/18/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
6/15/2018 10:50:33 AM  |
6/18/2018  |
10 AM - 2 PM  |
6/18/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
6/15/2018 10:50:57 AM  |
6/18/2018  |
10 AM - 2 PM  |
6/18/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
6/15/2018 11:29:39 AM  |
6/18/2018  |
10 AM - 2 PM  |
6/18/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
6/18/2018 2:18:29 PM  |
6/19/2018  |
8 AM - 12 PM  |
6/19/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/18/2018 2:18:37 PM  |
6/19/2018  |
8 AM - 12 PM  |
6/19/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/19/2018 2:29:00 PM  |
6/20/2018  |
8 AM - 12 PM  |
6/20/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/19/2018 2:29:11 PM  |
6/20/2018  |
8 AM - 12 PM  |
6/20/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/20/2018 1:35:02 PM  |
6/21/2018  |
8 AM - 12 PM  |
6/21/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
6/20/2018 1:35:13 PM  |
6/21/2018  |
8 AM - 12 PM  |
6/21/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
6/21/2018 2:45:37 PM  |
6/22/2018  |
8 AM - 12 PM  |
6/22/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/21/2018 2:45:46 PM  |
6/22/2018  |
8 AM - 12 PM  |
6/22/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
6/21/2018 2:45:53 PM  |
6/22/2018  |
8 AM - 12 PM  |
6/22/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/21/2018 2:46:00 PM  |
6/22/2018  |
8 AM - 12 PM  |
6/22/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/21/2018 2:46:09 PM  |
6/22/2018  |
8 AM - 12 PM  |
6/22/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
6/22/2018 11:31:03 AM  |
6/25/2018  |
  |
6/25/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
6/22/2018 11:31:13 AM  |
6/25/2018  |
  |
6/25/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
6/22/2018 11:31:24 AM  |
6/25/2018  |
  |
6/25/2018  |
P  |
GCT  |
BLD -Floor Joists/Girders Insp  |
6/22/2018 11:31:46 AM  |
6/25/2018  |
  |
6/25/2018  |
N  |
GCT  |
BLD - Framing Insp.  |
6/25/2018 1:42:14 PM  |
6/26/2018  |
8 AM - 12 PM  |
6/26/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
6/25/2018 1:42:20 PM  |
6/26/2018  |
8 AM - 12 PM  |
6/26/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/25/2018 1:42:37 PM  |
6/26/2018  |
8 AM - 12 PM  |
6/26/2018  |
P  |
BEN  |
BLD -Floor Joists/Girders Insp  |
6/25/2018 1:42:42 PM  |
6/26/2018  |
8 AM - 12 PM  |
6/26/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/26/2018 2:43:03 PM  |
6/27/2018  |
8 AM - 12 PM  |
6/27/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
6/26/2018 2:43:17 PM  |
6/27/2018  |
8 AM - 12 PM  |
6/27/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/26/2018 2:43:23 PM  |
6/27/2018  |
8 AM - 12 PM  |
6/27/2018  |
P  |
BEN  |
BLD - Interior Lath  |
6/26/2018 2:43:31 PM  |
6/27/2018  |
8 AM - 12 PM  |
6/27/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
6/26/2018 2:43:51 PM  |
6/27/2018  |
8 AM - 12 PM  |
6/27/2018  |
C  |
BEN  |
BLD -Floor Joists/Girders Insp  |
6/26/2018 2:43:57 PM  |
6/27/2018  |
8 AM - 12 PM  |
6/27/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/27/2018 10:12:26 AM  |
6/28/2018  |
8 AM - 12 PM  |
6/28/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
6/27/2018 10:12:34 AM  |
6/28/2018  |
8 AM - 12 PM  |
6/28/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/27/2018 10:12:41 AM  |
6/28/2018  |
8 AM - 12 PM  |
6/28/2018  |
N  |
BEN  |
ELE - Rough Electrical  |
6/27/2018 10:12:52 AM  |
6/28/2018  |
8 AM - 12 PM  |
6/28/2018  |
C  |
BEN  |
BLD - Interior Lath  |
6/27/2018 10:13:05 AM  |
6/28/2018  |
8 AM - 12 PM  |
6/28/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/27/2018 10:21:50 AM  |
6/29/2018  |
8 AM - 12 PM  |
6/29/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
6/27/2018 10:22:01 AM  |
6/29/2018  |
8 AM - 12 PM  |
6/29/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/27/2018 10:22:18 AM  |
6/29/2018  |
8 AM - 12 PM  |
6/29/2018  |
C  |
BEN  |
BLD - Interior Lath  |
6/27/2018 10:22:28 AM  |
6/29/2018  |
8 AM - 12 PM  |
6/29/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
6/27/2018 10:22:40 AM  |
6/29/2018  |
8 AM - 12 PM  |
6/29/2018  |
P  |
BEN  |
BLD -Floor Joists/Girders Insp  |
6/27/2018 10:22:49 AM  |
6/29/2018  |
8 AM - 12 PM  |
6/29/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
6/28/2018 11:43:02 AM  |
7/2/2018  |
8 AM - 12 PM  |
7/2/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
6/28/2018 11:43:13 AM  |
7/2/2018  |
8 AM - 12 PM  |
7/2/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
6/28/2018 11:44:26 AM  |
7/2/2018  |
8 AM - 12 PM  |
7/2/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
6/28/2018 11:44:37 AM  |
7/2/2018  |
8 AM - 12 PM  |
7/2/2018  |
P  |
BEN  |
MEC - Rough Duct  |
6/28/2018 2:37:56 PM  |
6/29/2018  |
8 AM - 12 PM  |
6/29/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
7/1/2018 9:16:17 AM  |
7/2/2018  |
8 AM - 12 PM  |
7/2/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/2/2018 2:26:40 PM  |
7/3/2018  |
10 AM - 2 PM  |
7/3/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
7/2/2018 2:26:56 PM  |
7/3/2018  |
10 AM - 2 PM  |
7/3/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/2/2018 2:27:12 PM  |
7/3/2018  |
10 AM - 2 PM  |
7/3/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/2/2018 2:27:31 PM  |
7/3/2018  |
10 AM - 2 PM  |
7/3/2018  |
P  |
BEN  |
BLD -Floor Joists/Girders Insp  |
7/2/2018 2:27:43 PM  |
7/3/2018  |
10 AM - 2 PM  |
7/3/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/3/2018 12:41:58 PM  |
7/5/2018  |
8 AM - 12 PM  |
7/5/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/3/2018 12:42:03 PM  |
7/5/2018  |
8 AM - 12 PM  |
7/5/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/3/2018 12:42:10 PM  |
7/5/2018  |
8 AM - 12 PM  |
7/5/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/3/2018 12:42:17 PM  |
7/5/2018  |
8 AM - 12 PM  |
7/5/2018  |
C  |
BEN  |
BLD -Floor Joists/Girders Insp  |
7/3/2018 1:10:22 PM  |
7/5/2018  |
8 AM - 12 PM  |
7/5/2018  |
C  |
BEN  |
BLD - Interior Lath  |
7/4/2018 10:12:06 PM  |
7/5/2018  |
8 AM - 12 PM  |
7/5/2018  |
P  |
BEN  |
BLD - Insulation Insp  |
7/4/2018 10:12:39 PM  |
7/5/2018  |
8 AM - 12 PM  |
7/5/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/5/2018 1:32:02 PM  |
7/6/2018  |
8 AM - 12 PM  |
7/6/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
7/5/2018 1:32:08 PM  |
7/6/2018  |
8 AM - 12 PM  |
7/6/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/5/2018 1:32:20 PM  |
7/6/2018  |
8 AM - 12 PM  |
7/6/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/5/2018 1:32:30 PM  |
7/6/2018  |
8 AM - 12 PM  |
7/6/2018  |
P  |
BEN  |
BLD -Floor Joists/Girders Insp  |
7/5/2018 1:32:46 PM  |
7/6/2018  |
8 AM - 12 PM  |
7/6/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
7/6/2018 11:37:49 AM  |
7/9/2018  |
  |
7/9/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
7/6/2018 11:37:54 AM  |
7/9/2018  |
  |
7/9/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
7/6/2018 11:38:05 AM  |
7/9/2018  |
  |
7/9/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
7/6/2018 11:38:14 AM  |
7/9/2018  |
  |
7/9/2018  |
C  |
GCT  |
ELE - Rough Electrical  |
7/6/2018 11:38:21 AM  |
7/9/2018  |
  |
7/9/2018  |
P  |
GCT  |
BLD -Floor Joists/Girders Insp  |
7/6/2018 11:38:27 AM  |
7/9/2018  |
  |
7/9/2018  |
P  |
GCT  |
BLD - Reinforcing Insp  |
7/9/2018 1:14:19 PM  |
7/10/2018  |
12 PM - 3 PM  |
7/10/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
7/9/2018 1:14:24 PM  |
7/10/2018  |
12 PM - 3 PM  |
7/10/2018  |
N  |
BEN  |
BLD - Drywall Inspection  |
7/9/2018 1:14:30 PM  |
7/10/2018  |
12 PM - 3 PM  |
7/10/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/9/2018 1:14:35 PM  |
7/10/2018  |
12 PM - 3 PM  |
7/10/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/9/2018 1:14:50 PM  |
7/10/2018  |
12 PM - 3 PM  |
7/10/2018  |
N  |
BEN  |
BLD -Floor Joists/Girders Insp  |
7/9/2018 1:15:19 PM  |
7/10/2018  |
12 PM - 3 PM  |
7/10/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/10/2018 2:15:43 PM  |
7/11/2018  |
8 AM - 12 PM  |
7/11/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/10/2018 2:15:51 PM  |
7/11/2018  |
8 AM - 12 PM  |
7/11/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/10/2018 2:15:59 PM  |
7/11/2018  |
8 AM - 12 PM  |
7/11/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
7/10/2018 2:16:22 PM  |
7/11/2018  |
8 AM - 12 PM  |
7/11/2018  |
C  |
BEN  |
BLD - Interior Lath  |
7/10/2018 2:16:33 PM  |
7/11/2018  |
8 AM - 12 PM  |
7/11/2018  |
P  |
BEN  |
BLD -Floor Joists/Girders Insp  |
7/10/2018 2:17:28 PM  |
7/11/2018  |
8 AM - 12 PM  |
7/11/2018  |
P  |
BEN  |
Approved Revision Structural  |
7/11/2018  |
  |
  |
7/19/2018  |
DONE  |
CSG  |
Route Revision Structural  |
7/11/2018  |
7/27/2018  |
  |
7/19/2018  |
APPR  |
CSG  |
BLD - Framing Insp.  |
7/11/2018 2:31:24 PM  |
7/12/2018  |
8 AM - 12 PM  |
7/12/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/11/2018 2:31:33 PM  |
7/12/2018  |
8 AM - 12 PM  |
7/12/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/11/2018 2:31:46 PM  |
7/12/2018  |
8 AM - 12 PM  |
7/12/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/11/2018 2:31:59 PM  |
7/12/2018  |
8 AM - 12 PM  |
7/12/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/12/2018 2:45:55 PM  |
7/13/2018  |
8 AM - 12 PM  |
7/13/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
7/12/2018 2:46:04 PM  |
7/13/2018  |
8 AM - 12 PM  |
7/13/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
7/12/2018 2:49:20 PM  |
7/13/2018  |
8 AM - 12 PM  |
7/13/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
7/12/2018 2:50:45 PM  |
7/13/2018  |
8 AM - 12 PM  |
7/13/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
7/13/2018 12:39:53 PM  |
7/16/2018  |
12 PM - 3 PM  |
7/16/2018  |
C  |
JOS  |
BLD - Drywall Inspection  |
7/13/2018 12:39:58 PM  |
7/16/2018  |
12 PM - 3 PM  |
7/16/2018  |
C  |
JOS  |
BLD - Exterior Lath Insp  |
7/13/2018 12:40:04 PM  |
7/16/2018  |
12 PM - 3 PM  |
7/16/2018  |
C  |
JOS  |
ELE - Rough Electrical  |
7/13/2018 12:40:14 PM  |
7/16/2018  |
12 PM - 3 PM  |
7/16/2018  |
C  |
JOS  |
BLD - Framing Insp.  |
7/16/2018 2:44:51 PM  |
7/17/2018  |
8 AM - 12 PM  |
7/17/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
7/16/2018 2:45:04 PM  |
7/17/2018  |
8 AM - 12 PM  |
7/17/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/16/2018 2:45:22 PM  |
7/17/2018  |
8 AM - 12 PM  |
7/17/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/16/2018 2:45:39 PM  |
7/17/2018  |
8 AM - 12 PM  |
7/17/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
7/17/2018 1:40:18 PM  |
7/18/2018  |
8 AM - 12 PM  |
7/18/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/17/2018 1:43:53 PM  |
7/18/2018  |
8 AM - 12 PM  |
7/18/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/17/2018 1:46:12 PM  |
7/18/2018  |
8 AM - 12 PM  |
7/18/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/17/2018 1:46:25 PM  |
7/18/2018  |
8 AM - 12 PM  |
7/18/2018  |
C  |
BEN  |
BLD - Insulation Insp  |
7/17/2018 1:51:11 PM  |
7/18/2018  |
8 AM - 12 PM  |
7/18/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/18/2018 3:29:27 PM  |
7/19/2018  |
8 AM - 12 PM  |
7/19/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/18/2018 3:29:34 PM  |
7/19/2018  |
8 AM - 12 PM  |
7/19/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/18/2018 3:29:40 PM  |
7/19/2018  |
8 AM - 12 PM  |
7/19/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/18/2018 3:29:49 PM  |
7/19/2018  |
8 AM - 12 PM  |
7/19/2018  |
C  |
BEN  |
BLD - Interior Lath  |
7/18/2018 3:29:57 PM  |
7/19/2018  |
8 AM - 12 PM  |
7/19/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
7/19/2018 2:25:10 PM  |
7/20/2018  |
8 AM - 12 PM  |
7/20/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/19/2018 2:25:16 PM  |
7/20/2018  |
8 AM - 12 PM  |
7/20/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/19/2018 2:25:25 PM  |
7/20/2018  |
8 AM - 12 PM  |
7/20/2018  |
P  |
BEN  |
BLD - T-Bar (Structural) Insp  |
7/19/2018 2:25:32 PM  |
7/20/2018  |
8 AM - 12 PM  |
7/20/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/19/2018 2:25:41 PM  |
7/20/2018  |
8 AM - 12 PM  |
7/20/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/20/2018 2:09:57 PM  |
7/23/2018  |
8 AM - 12 PM  |
7/23/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
7/20/2018 2:10:04 PM  |
7/23/2018  |
8 AM - 12 PM  |
7/23/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
7/20/2018 2:10:12 PM  |
7/23/2018  |
8 AM - 12 PM  |
7/23/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
7/20/2018 2:10:41 PM  |
7/23/2018  |
8 AM - 12 PM  |
7/23/2018  |
C  |
GCT  |
BLD - T-Bar (Structural) Insp  |
7/20/2018 2:11:02 PM  |
7/23/2018  |
8 AM - 12 PM  |
7/23/2018  |
C  |
GCT  |
BLD - Reinforcing Insp  |
7/20/2018 2:14:55 PM  |
7/23/2018  |
8 AM - 12 PM  |
7/23/2018  |
C  |
GCT  |
BLD - Insulation Insp  |
7/22/2018 4:37:48 PM  |
7/23/2018  |
8 AM - 12 PM  |
7/23/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
7/23/2018 10:58:26 AM  |
7/24/2018  |
8 AM - 12 PM  |
7/24/2018  |
N  |
BEN  |
BLD - Drywall Inspection  |
7/23/2018 10:58:36 AM  |
7/24/2018  |
8 AM - 12 PM  |
7/24/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/23/2018 10:58:54 AM  |
7/24/2018  |
8 AM - 12 PM  |
7/24/2018  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
7/23/2018 10:59:01 AM  |
7/24/2018  |
8 AM - 12 PM  |
7/24/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/23/2018 10:59:20 AM  |
7/24/2018  |
8 AM - 12 PM  |
7/24/2018  |
N  |
BEN  |
BLD - Insulation Insp  |
7/23/2018 3:00:02 PM  |
7/24/2018  |
8 AM - 12 PM  |
7/24/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/24/2018 11:12:18 AM  |
7/25/2018  |
8 AM - 12 PM  |
7/25/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/24/2018 11:12:56 AM  |
7/25/2018  |
8 AM - 12 PM  |
7/25/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/24/2018 11:13:03 AM  |
7/25/2018  |
8 AM - 12 PM  |
7/25/2018  |
C  |
BEN  |
BLD - Insulation Insp  |
7/24/2018 11:13:11 AM  |
7/25/2018  |
8 AM - 12 PM  |
7/25/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/24/2018 11:13:19 AM  |
7/25/2018  |
8 AM - 12 PM  |
7/25/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/25/2018 12:03:26 PM  |
7/26/2018  |
12 PM - 3 PM  |
7/26/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
7/25/2018 12:03:32 PM  |
7/26/2018  |
12 PM - 3 PM  |
7/26/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
7/25/2018 12:03:37 PM  |
7/26/2018  |
12 PM - 3 PM  |
7/26/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/25/2018 12:03:45 PM  |
7/26/2018  |
12 PM - 3 PM  |
7/26/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
7/26/2018 2:35:48 PM  |
7/27/2018  |
8 AM - 12 PM  |
7/27/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/26/2018 2:36:00 PM  |
7/27/2018  |
8 AM - 12 PM  |
7/27/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/26/2018 2:36:18 PM  |
7/27/2018  |
8 AM - 12 PM  |
7/27/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/26/2018 2:36:28 PM  |
7/27/2018  |
8 AM - 12 PM  |
7/27/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/27/2018 1:34:26 PM  |
7/30/2018  |
  |
7/30/2018  |
C  |
GCT  |
BLD - Drywall Inspection  |
7/27/2018 1:34:34 PM  |
7/30/2018  |
  |
7/30/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
7/27/2018 1:34:47 PM  |
7/30/2018  |
  |
7/30/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
7/27/2018 1:34:59 PM  |
7/30/2018  |
  |
7/30/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
7/30/2018 1:24:46 PM  |
7/31/2018  |
12 PM - 3 PM  |
7/31/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/30/2018 1:25:43 PM  |
7/31/2018  |
12 PM - 3 PM  |
7/31/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/30/2018 1:25:49 PM  |
7/31/2018  |
12 PM - 3 PM  |
7/31/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/30/2018 1:26:22 PM  |
7/31/2018  |
12 PM - 3 PM  |
7/31/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
7/31/2018 2:34:43 PM  |
8/1/2018  |
8 AM - 12 PM  |
8/1/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/31/2018 2:34:54 PM  |
8/1/2018  |
8 AM - 12 PM  |
8/1/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
7/31/2018 2:35:07 PM  |
8/1/2018  |
8 AM - 12 PM  |
8/1/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
7/31/2018 2:35:16 PM  |
8/1/2018  |
8 AM - 12 PM  |
8/1/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/1/2018 2:24:48 PM  |
8/2/2018  |
8 AM - 12 PM  |
8/2/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/1/2018 2:25:06 PM  |
8/2/2018  |
8 AM - 12 PM  |
8/2/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
8/1/2018 2:25:37 PM  |
8/2/2018  |
8 AM - 12 PM  |
8/2/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
8/1/2018 2:26:23 PM  |
8/2/2018  |
8 AM - 12 PM  |
8/2/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/2/2018 1:42:41 PM  |
8/3/2018  |
8 AM - 12 PM  |
8/3/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/2/2018 1:42:47 PM  |
8/3/2018  |
8 AM - 12 PM  |
8/3/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/2/2018 1:43:35 PM  |
8/3/2018  |
8 AM - 12 PM  |
8/3/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
8/2/2018 1:43:44 PM  |
8/3/2018  |
8 AM - 12 PM  |
8/3/2018  |
C  |
BEN  |
MEC - Rough Mechanical  |
8/2/2018 1:44:37 PM  |
8/3/2018  |
8 AM - 12 PM  |
8/3/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
8/3/2018 2:49:15 PM  |
8/6/2018  |
8 AM - 12 PM  |
8/27/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
8/3/2018 2:49:23 PM  |
8/6/2018  |
8 AM - 12 PM  |
8/6/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
8/3/2018 2:49:32 PM  |
8/6/2018  |
8 AM - 12 PM  |
8/6/2018  |
C  |
GCT  |
ELE - Rough Electrical  |
8/3/2018 2:49:40 PM  |
8/6/2018  |
8 AM - 12 PM  |
8/27/2018  |
C  |
GCT  |
BLD - Reinforcing Insp  |
8/3/2018 2:49:50 PM  |
8/6/2018  |
8 AM - 12 PM  |
8/6/2018  |
C  |
GCT  |
BLD - Framing Insp.  |
8/6/2018 12:07:12 PM  |
8/7/2018  |
8 AM - 12 PM  |
8/7/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/6/2018 12:07:21 PM  |
8/7/2018  |
8 AM - 12 PM  |
8/7/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/6/2018 12:07:43 PM  |
8/7/2018  |
8 AM - 12 PM  |
8/7/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
8/6/2018 12:07:50 PM  |
8/7/2018  |
8 AM - 12 PM  |
8/7/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/7/2018 1:53:09 PM  |
8/8/2018  |
10 AM - 2 PM  |
8/8/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/7/2018 1:54:13 PM  |
8/8/2018  |
10 AM - 2 PM  |
8/8/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/7/2018 1:56:17 PM  |
8/8/2018  |
10 AM - 2 PM  |
8/8/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
8/7/2018 1:56:41 PM  |
8/8/2018  |
10 AM - 2 PM  |
8/8/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/8/2018 3:34:15 PM  |
8/9/2018  |
12 PM - 3 PM  |
8/9/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/8/2018 3:34:20 PM  |
8/9/2018  |
12 PM - 3 PM  |
8/9/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/8/2018 3:34:28 PM  |
8/9/2018  |
12 PM - 3 PM  |
8/9/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
8/8/2018 3:35:02 PM  |
8/9/2018  |
12 PM - 3 PM  |
8/9/2018  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
8/8/2018 3:35:29 PM  |
8/9/2018  |
12 PM - 3 PM  |
8/9/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/9/2018 12:13:11 PM  |
8/10/2018  |
8 AM - 12 PM  |
8/10/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
8/9/2018 12:13:28 PM  |
8/10/2018  |
8 AM - 12 PM  |
8/10/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/9/2018 12:13:40 PM  |
8/10/2018  |
8 AM - 12 PM  |
8/10/2018  |
N  |
BEN  |
ELE - Rough Electrical  |
8/9/2018 12:13:49 PM  |
8/10/2018  |
8 AM - 12 PM  |
8/10/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/10/2018 2:23:15 PM  |
8/13/2018  |
8 AM - 12 PM  |
8/13/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
8/10/2018 2:23:51 PM  |
8/13/2018  |
8 AM - 12 PM  |
8/13/2018  |
P  |
PJJ  |
ELE - Rough Electrical  |
8/10/2018 2:24:02 PM  |
8/13/2018  |
8 AM - 12 PM  |
8/13/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
8/13/2018 10:02:32 AM  |
8/14/2018  |
8 AM - 12 PM  |
8/14/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/13/2018 10:02:39 AM  |
8/14/2018  |
8 AM - 12 PM  |
8/14/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
8/13/2018 10:02:52 AM  |
8/14/2018  |
8 AM - 12 PM  |
8/14/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/13/2018 1:46:01 PM  |
8/14/2018  |
8 AM - 12 PM  |
8/14/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/14/2018 2:27:47 PM  |
8/15/2018  |
8 AM - 12 PM  |
8/15/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/14/2018 2:27:53 PM  |
8/15/2018  |
8 AM - 12 PM  |
8/15/2018  |
C  |
BEN  |
BLD -Floor Joists/Girders Insp  |
8/14/2018 2:28:27 PM  |
8/15/2018  |
8 AM - 12 PM  |
8/15/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
8/14/2018 2:28:39 PM  |
8/15/2018  |
8 AM - 12 PM  |
8/15/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
8/14/2018 2:29:36 PM  |
8/15/2018  |
8 AM - 12 PM  |
8/15/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/15/2018 11:18:43 AM  |
8/16/2018  |
8 AM - 12 PM  |
8/16/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/15/2018 11:18:49 AM  |
8/16/2018  |
8 AM - 12 PM  |
8/16/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/15/2018 11:19:06 AM  |
8/16/2018  |
8 AM - 12 PM  |
8/16/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
8/15/2018 11:19:15 AM  |
8/16/2018  |
8 AM - 12 PM  |
8/16/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/16/2018 1:31:25 PM  |
8/17/2018  |
8 AM - 12 PM  |
8/17/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/16/2018 1:31:31 PM  |
8/17/2018  |
8 AM - 12 PM  |
8/17/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/16/2018 1:32:06 PM  |
8/17/2018  |
8 AM - 12 PM  |
8/17/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
8/16/2018 1:32:14 PM  |
8/17/2018  |
8 AM - 12 PM  |
8/17/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/16/2018 1:46:03 PM  |
8/20/2018  |
  |
8/20/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/16/2018 1:46:11 PM  |
8/20/2018  |
  |
8/20/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
8/16/2018 1:46:18 PM  |
8/20/2018  |
  |
8/20/2018  |
P  |
PJJ  |
ELE - Rough Electrical  |
8/16/2018 1:46:31 PM  |
8/20/2018  |
  |
8/20/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
8/20/2018 10:15:34 AM  |
8/21/2018  |
12 PM - 3 PM  |
8/21/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/20/2018 10:15:39 AM  |
8/21/2018  |
12 PM - 3 PM  |
8/21/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/20/2018 10:15:58 AM  |
8/21/2018  |
12 PM - 3 PM  |
8/21/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
8/20/2018 10:16:09 AM  |
8/21/2018  |
12 PM - 3 PM  |
8/21/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/21/2018 8:30:04 AM  |
8/22/2018  |
8 AM - 12 PM  |
8/22/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
8/21/2018 8:30:09 AM  |
8/22/2018  |
8 AM - 12 PM  |
8/22/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/21/2018 8:30:16 AM  |
8/22/2018  |
8 AM - 12 PM  |
8/22/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
8/21/2018 8:30:24 AM  |
8/22/2018  |
8 AM - 12 PM  |
8/22/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
8/21/2018 2:25:05 PM  |
8/22/2018  |
8 AM - 12 PM  |
8/22/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/22/2018 7:49:28 AM  |
8/23/2018  |
12 PM - 3 PM  |
8/23/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/22/2018 7:49:34 AM  |
8/23/2018  |
12 PM - 3 PM  |
8/23/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
8/22/2018 7:49:45 AM  |
8/23/2018  |
12 PM - 3 PM  |
8/23/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
8/22/2018 7:49:53 AM  |
8/23/2018  |
12 PM - 3 PM  |
8/23/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
8/22/2018 12:22:15 PM  |
8/23/2018  |
12 PM - 3 PM  |
8/23/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/23/2018 6:01:41 AM  |
8/24/2018  |
8 AM - 12 PM  |
8/24/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
8/23/2018 6:01:48 AM  |
8/24/2018  |
8 AM - 12 PM  |
8/24/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
8/23/2018 6:02:16 AM  |
8/24/2018  |
8 AM - 12 PM  |
8/24/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
8/23/2018 6:02:34 AM  |
8/24/2018  |
8 AM - 12 PM  |
8/24/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
8/23/2018 6:03:57 AM  |
8/24/2018  |
8 AM - 12 PM  |
8/24/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
8/26/2018 10:58:17 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
8/26/2018 10:58:30 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
8/26/2018 10:58:44 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
C  |
GCT  |
BLD - Penetrations -Fire Rated  |
8/26/2018 10:59:46 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
C  |
GCT  |
BLD - Insulation Insp  |
8/26/2018 10:59:56 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
8/26/2018 11:00:07 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
C  |
GCT  |
BLD -Floor Joists/Girders Insp  |
8/26/2018 11:00:24 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
C  |
GCT  |
PLM - Rough/Topout  |
8/26/2018 11:20:13 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
C  |
GCT  |
BLD - Reinforcing Insp  |
8/26/2018 11:20:26 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
C  |
GCT  |
BLD - T-Bar (Structural) Insp  |
8/26/2018 11:20:45 AM  |
8/27/2018  |
8 AM - 12 PM  |
8/27/2018  |
C  |
GCT  |
BLD - Framing Insp.  |
8/27/2018 1:50:34 PM  |
8/28/2018  |
  |
8/28/2018  |
P  |
GCT  |
Route to Struct/Architectual  |
8/29/2018  |
9/17/2018  |
  |
9/4/2018  |
APPR  |
CSG  |
Apprv. by Struct/Architectural  |
8/29/2018  |
  |
  |
9/4/2018 1:52:28 PM  |
APPR  |
CSG  |
BLD - Exterior Lath Insp  |
8/29/2018 1:58:12 PM  |
8/30/2018  |
8 AM - 12 PM  |
8/30/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
8/30/2018 1:58:37 PM  |
8/31/2018  |
8 AM - 12 PM  |
8/31/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
8/30/2018 1:58:57 PM  |
8/31/2018  |
8 AM - 12 PM  |
8/31/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
8/31/2018 10:40:19 AM  |
9/4/2018  |
8 AM - 12 PM  |
9/4/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
9/4/2018 1:19:49 PM  |
9/5/2018  |
12 PM - 3 PM  |
9/5/2018  |
N  |
BEN  |
ELE - Rough Electrical  |
9/4/2018 1:19:57 PM  |
9/5/2018  |
12 PM - 3 PM  |
9/5/2018  |
P  |
BEN  |
BLD - Reinforcing Insp  |
9/5/2018 12:09:02 PM  |
9/6/2018  |
8 AM - 12 PM  |
9/6/2018  |
P  |
BEN  |
PLM - Ground/Underfloor water  |
9/5/2018 12:09:32 PM  |
9/6/2018  |
8 AM - 12 PM  |
9/6/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
9/5/2018 2:27:21 PM  |
9/6/2018  |
8 AM - 12 PM  |
9/6/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
9/5/2018 2:27:56 PM  |
9/6/2018  |
8 AM - 12 PM  |
9/6/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
9/6/2018 1:53:09 PM  |
9/7/2018  |
8 AM - 12 PM  |
9/7/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
9/7/2018 12:33:13 PM  |
9/10/2018  |
8 AM - 12 PM  |
9/10/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
9/7/2018 12:33:22 PM  |
9/10/2018  |
8 AM - 12 PM  |
9/10/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
9/7/2018 12:33:30 PM  |
9/10/2018  |
8 AM - 12 PM  |
9/10/2018  |
C  |
BEN  |
PLM - Ground/Underfloor waste  |
9/7/2018 12:33:41 PM  |
9/10/2018  |
8 AM - 12 PM  |
9/10/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
9/9/2018 4:10:51 PM  |
9/10/2018  |
8 AM - 12 PM  |
9/10/2018  |
C  |
BEN  |
PLM - Rough/Topout  |
9/9/2018 4:11:49 PM  |
9/10/2018  |
8 AM - 12 PM  |
9/10/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
9/10/2018 2:37:11 PM  |
9/11/2018  |
8 AM - 12 PM  |
9/11/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
9/10/2018 2:37:20 PM  |
9/11/2018  |
8 AM - 12 PM  |
9/11/2018  |
C  |
BEN  |
PLM - Ground/Underfloor waste  |
9/10/2018 2:37:30 PM  |
9/11/2018  |
8 AM - 12 PM  |
9/11/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
9/11/2018 3:34:01 PM  |
9/12/2018  |
8 AM - 12 PM  |
9/12/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
9/11/2018 3:34:30 PM  |
9/12/2018  |
8 AM - 12 PM  |
9/12/2018  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
9/13/2018 1:17:41 PM  |
9/14/2018  |
12 PM - 3 PM  |
9/14/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
9/13/2018 1:17:50 PM  |
9/14/2018  |
12 PM - 3 PM  |
9/14/2018  |
P  |
BEN  |
ELE - Underground conduit  |
9/13/2018 1:18:01 PM  |
9/14/2018  |
12 PM - 3 PM  |
9/14/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
9/13/2018 3:13:00 PM  |
9/14/2018  |
12 PM - 3 PM  |
9/14/2018  |
C  |
BEN  |
Route to Planning Zoning  |
9/14/2018  |
10/2/2018  |
  |
9/25/2018  |
APPR  |
EYT  |
Approved by Planning Zoning  |
9/14/2018  |
  |
  |
9/25/2018  |
DONE  |
EYT  |
Route to Struct/Architectual  |
9/14/2018  |
10/2/2018  |
  |
9/24/2018  |
APPR  |
CSG  |
Apprv. by Struct/Architectural  |
9/14/2018  |
  |
  |
9/24/2018 12:28:41 PM  |
APPR  |
CSG  |
BLD - Framing Insp.  |
9/14/2018 12:41:51 PM  |
9/17/2018  |
8 AM - 12 PM  |
9/17/2018  |
P  |
PJJ  |
ELE - Rough Electrical  |
9/14/2018 12:41:59 PM  |
9/17/2018  |
8 AM - 12 PM  |
9/17/2018  |
P  |
PJJ  |
BLD - Exterior Lath Insp  |
9/17/2018 11:07:05 AM  |
9/18/2018  |
12 PM - 3 PM  |
9/18/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
9/17/2018 11:07:17 AM  |
9/18/2018  |
12 PM - 3 PM  |
9/18/2018  |
N  |
BEN  |
ELE - Rough Electrical  |
9/17/2018 2:45:00 PM  |
9/18/2018  |
12 PM - 3 PM  |
9/18/2018  |
N  |
BEN  |
BLD -Floor Joists/Girders Insp  |
9/17/2018 2:45:26 PM  |
9/18/2018  |
12 PM - 3 PM  |
9/18/2018  |
P  |
BEN  |
BLD - Pre-Slab Insp  |
9/18/2018 3:44:43 PM  |
9/19/2018  |
12 PM - 3 PM  |
9/19/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
9/18/2018 3:44:58 PM  |
9/19/2018  |
12 PM - 3 PM  |
9/19/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
9/18/2018 3:45:18 PM  |
9/19/2018  |
12 PM - 3 PM  |
9/19/2018  |
C  |
BEN  |
BLD -Floor Joists/Girders Insp  |
9/18/2018 3:45:44 PM  |
9/19/2018  |
12 PM - 3 PM  |
9/19/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
9/19/2018 2:12:46 PM  |
9/20/2018  |
12 PM - 3 PM  |
9/20/2018  |
P  |
BEN  |
BLD - Interior Lath  |
9/19/2018 2:12:53 PM  |
9/20/2018  |
12 PM - 3 PM  |
9/20/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
9/19/2018 2:13:01 PM  |
9/20/2018  |
12 PM - 3 PM  |
9/20/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
9/20/2018 12:58:25 PM  |
9/21/2018  |
8 AM - 12 PM  |
9/21/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
9/20/2018 12:58:33 PM  |
9/21/2018  |
8 AM - 12 PM  |
9/21/2018  |
P  |
BEN  |
Approved Revision Structural  |
9/20/2018  |
  |
  |
9/20/2018  |
APPR  |
CSG  |
Route Revision Structural  |
9/20/2018  |
10/8/2018  |
  |
9/20/2018  |
APPR  |
CSG  |
BLD - Framing Insp.  |
9/23/2018 10:17:53 AM  |
9/24/2018  |
8 AM - 12 PM  |
9/24/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
9/23/2018 10:18:30 AM  |
9/24/2018  |
8 AM - 12 PM  |
9/24/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
9/23/2018 10:18:45 AM  |
9/24/2018  |
8 AM - 12 PM  |
9/24/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
9/24/2018 1:59:52 PM  |
9/25/2018  |
8 AM - 12 PM  |
9/25/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
9/24/2018 2:00:02 PM  |
9/25/2018  |
8 AM - 12 PM  |
9/25/2018  |
C  |
BEN  |
BLD - Roof Sheathing Insp.  |
9/24/2018 2:00:14 PM  |
9/25/2018  |
8 AM - 12 PM  |
9/25/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
9/24/2018 2:00:27 PM  |
9/25/2018  |
8 AM - 12 PM  |
9/25/2018  |
C  |
BEN  |
BLD - Footings Insp  |
9/25/2018 12:13:57 PM  |
9/26/2018  |
8 AM - 12 PM  |
9/26/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
9/25/2018 12:14:03 PM  |
9/26/2018  |
8 AM - 12 PM  |
9/26/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
9/25/2018 12:14:10 PM  |
9/26/2018  |
8 AM - 12 PM  |
9/26/2018  |
P  |
BEN  |
BLD - Roof Sheathing Insp.  |
9/25/2018 12:14:15 PM  |
9/26/2018  |
8 AM - 12 PM  |
9/26/2018  |
C  |
BEN  |
ELE - Underground conduit  |
9/25/2018 12:14:25 PM  |
9/26/2018  |
8 AM - 12 PM  |
9/26/2018  |
A  |
BEN  |
ELE - Rough Electrical  |
9/25/2018 12:14:32 PM  |
9/26/2018  |
8 AM - 12 PM  |
9/26/2018  |
C  |
BEN  |
MEC - Underground Rough  |
9/25/2018 12:14:50 PM  |
9/26/2018  |
8 AM - 12 PM  |
9/26/2018  |
A  |
BEN  |
PLM - Ground/Underfloor waste  |
9/25/2018 12:14:57 PM  |
9/26/2018  |
8 AM - 12 PM  |
9/26/2018  |
A  |
BEN  |
PLM - Ground/Underfloor water  |
9/25/2018 12:15:07 PM  |
9/26/2018  |
8 AM - 12 PM  |
9/26/2018  |
A  |
BEN  |
BLD - Framing Insp.  |
9/26/2018 2:17:19 PM  |
9/27/2018  |
12 PM - 3 PM  |
9/27/2018  |
C  |
BEN  |
BLD - Roof Sheathing Insp.  |
9/26/2018 2:17:30 PM  |
9/27/2018  |
12 PM - 3 PM  |
9/27/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
9/26/2018 2:17:38 PM  |
9/27/2018  |
12 PM - 3 PM  |
9/27/2018  |
C  |
BEN  |
BLD - Interior Lath  |
9/26/2018 2:17:54 PM  |
9/27/2018  |
12 PM - 3 PM  |
9/27/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
9/27/2018 2:24:58 PM  |
9/28/2018  |
8 AM - 12 PM  |
9/28/2018  |
C  |
BEN  |
BLD - Roof Sheathing Insp.  |
9/27/2018 2:25:23 PM  |
9/28/2018  |
8 AM - 12 PM  |
9/28/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
9/27/2018 2:25:30 PM  |
9/28/2018  |
8 AM - 12 PM  |
9/28/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
9/27/2018 2:25:43 PM  |
9/28/2018  |
8 AM - 12 PM  |
9/28/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
9/30/2018 8:46:51 AM  |
10/1/2018  |
8 AM - 12 PM  |
10/1/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
9/30/2018 8:47:04 AM  |
10/1/2018  |
8 AM - 12 PM  |
10/1/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
9/30/2018 8:48:26 AM  |
10/1/2018  |
8 AM - 12 PM  |
10/1/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
9/30/2018 8:48:36 AM  |
10/1/2018  |
8 AM - 12 PM  |
10/1/2018  |
C  |
PJJ  |
BLD - Roof Sheathing Insp.  |
9/30/2018 2:23:27 PM  |
10/1/2018  |
8 AM - 12 PM  |
10/1/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
10/1/2018 2:51:23 PM  |
10/2/2018  |
  |
10/2/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
10/1/2018 2:51:40 PM  |
10/2/2018  |
  |
10/2/2018  |
P  |
GCT  |
BLD - Interior Lath  |
10/1/2018 2:51:47 PM  |
10/2/2018  |
  |
10/2/2018  |
P  |
GCT  |
BLD - Roof Sheathing Insp.  |
10/1/2018 2:51:55 PM  |
10/2/2018  |
  |
10/2/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
10/1/2018 2:52:08 PM  |
10/2/2018  |
  |
10/10/2018  |
N  |
GCT  |
BLD - Framing Insp.  |
10/2/2018 3:22:52 PM  |
10/3/2018  |
8 AM - 12 PM  |
10/3/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
10/2/2018 3:23:52 PM  |
10/3/2018  |
8 AM - 12 PM  |
10/3/2018  |
P  |
PJJ  |
BLD - Roof Sheathing Insp.  |
10/2/2018 3:24:08 PM  |
10/3/2018  |
8 AM - 12 PM  |
10/3/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
10/2/2018 3:24:37 PM  |
10/3/2018  |
8 AM - 12 PM  |
10/3/2018  |
C  |
PJJ  |
BLD - Interior Lath  |
10/2/2018 3:25:00 PM  |
10/3/2018  |
8 AM - 12 PM  |
10/3/2018  |
C  |
PJJ  |
BLD - Roof Sheathing Insp.  |
10/3/2018 2:50:41 PM  |
10/4/2018  |
8 AM - 12 PM  |
10/4/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/3/2018 2:50:57 PM  |
10/4/2018  |
8 AM - 12 PM  |
10/4/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
10/3/2018 2:51:11 PM  |
10/4/2018  |
8 AM - 12 PM  |
10/4/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
10/4/2018 11:01:53 AM  |
10/5/2018  |
8 AM - 12 PM  |
10/5/2018  |
P  |
BEN  |
BLD - Roof Sheathing Insp.  |
10/4/2018 11:02:01 AM  |
10/5/2018  |
8 AM - 12 PM  |
10/5/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/4/2018 11:02:12 AM  |
10/5/2018  |
8 AM - 12 PM  |
10/5/2018  |
P  |
BEN  |
BLD -Floor Joists/Girders Insp  |
10/4/2018 2:28:25 PM  |
10/5/2018  |
8 AM - 12 PM  |
10/5/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/5/2018 10:06:16 AM  |
10/8/2018  |
8 AM - 12 PM  |
10/8/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
10/5/2018 10:06:23 AM  |
10/8/2018  |
8 AM - 12 PM  |
10/8/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
10/5/2018 10:06:31 AM  |
10/8/2018  |
8 AM - 12 PM  |
10/8/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
10/5/2018 10:06:40 AM  |
10/8/2018  |
8 AM - 12 PM  |
10/8/2018  |
C  |
PJJ  |
BLD - Roof Sheathing Insp.  |
10/5/2018 10:07:56 AM  |
10/8/2018  |
8 AM - 12 PM  |
10/8/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
10/8/2018 1:43:13 PM  |
10/9/2018  |
8 AM - 12 PM  |
10/9/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/8/2018 1:43:24 PM  |
10/9/2018  |
8 AM - 12 PM  |
10/9/2018  |
C  |
BEN  |
BLD - Roof Sheathing Insp.  |
10/8/2018 1:43:38 PM  |
10/9/2018  |
8 AM - 12 PM  |
10/9/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/8/2018 1:43:49 PM  |
10/9/2018  |
8 AM - 12 PM  |
10/9/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/9/2018 2:08:26 PM  |
10/10/2018  |
8 AM - 12 PM  |
10/10/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/9/2018 2:08:34 PM  |
10/10/2018  |
8 AM - 12 PM  |
10/10/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
10/10/2018 2:32:26 PM  |
10/11/2018  |
12 PM - 3 PM  |
10/11/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/10/2018 2:32:35 PM  |
10/11/2018  |
12 PM - 3 PM  |
10/11/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
10/11/2018 11:40:58 AM  |
10/12/2018  |
8 AM - 12 PM  |
10/12/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
10/11/2018 11:41:10 AM  |
10/12/2018  |
8 AM - 12 PM  |
10/12/2018  |
C  |
BEN  |
BLD - Roof Sheathing Insp.  |
10/11/2018 12:39:31 PM  |
10/12/2018  |
8 AM - 12 PM  |
10/12/2018  |
C  |
BEN  |
BLD - Reinforcing Insp  |
10/14/2018 3:10:43 PM  |
10/15/2018  |
8 AM - 12 PM  |
10/15/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
10/14/2018 3:10:54 PM  |
10/15/2018  |
8 AM - 12 PM  |
10/15/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
10/14/2018 3:11:05 PM  |
10/15/2018  |
8 AM - 12 PM  |
10/15/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
10/14/2018 3:11:17 PM  |
10/15/2018  |
8 AM - 12 PM  |
10/15/2018  |
C  |
PJJ  |
BLD - Roof Sheathing Insp.  |
10/14/2018 3:11:29 PM  |
10/15/2018  |
8 AM - 12 PM  |
10/15/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
10/14/2018 3:11:48 PM  |
10/15/2018  |
8 AM - 12 PM  |
10/15/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
10/15/2018 1:59:49 PM  |
10/16/2018  |
8 AM - 12 PM  |
10/16/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/15/2018 1:59:55 PM  |
10/16/2018  |
8 AM - 12 PM  |
10/16/2018  |
P  |
BEN  |
BLD - Roof Sheathing Insp.  |
10/15/2018 2:00:05 PM  |
10/16/2018  |
8 AM - 12 PM  |
10/16/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/15/2018 2:00:16 PM  |
10/16/2018  |
8 AM - 12 PM  |
10/16/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/16/2018 11:44:40 AM  |
10/17/2018  |
8 AM - 12 PM  |
10/17/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/16/2018 11:44:48 AM  |
10/17/2018  |
8 AM - 12 PM  |
10/17/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/16/2018 11:44:58 AM  |
10/17/2018  |
8 AM - 12 PM  |
10/17/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/16/2018 11:45:05 AM  |
10/17/2018  |
8 AM - 12 PM  |
10/17/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/17/2018 1:14:15 PM  |
10/18/2018  |
12 PM - 3 PM  |
10/18/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/17/2018 1:14:23 PM  |
10/18/2018  |
12 PM - 3 PM  |
10/18/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/17/2018 1:14:27 PM  |
10/18/2018  |
12 PM - 3 PM  |
10/18/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/17/2018 1:14:35 PM  |
10/18/2018  |
12 PM - 3 PM  |
10/18/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/18/2018 10:39:50 AM  |
10/19/2018  |
8 AM - 12 PM  |
10/19/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/18/2018 10:39:57 AM  |
10/19/2018  |
8 AM - 12 PM  |
10/19/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/18/2018 10:40:05 AM  |
10/19/2018  |
8 AM - 12 PM  |
10/19/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/18/2018 10:40:16 AM  |
10/19/2018  |
8 AM - 12 PM  |
10/19/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/19/2018 1:50:34 PM  |
10/22/2018  |
8 AM - 12 PM  |
10/22/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
10/19/2018 1:50:45 PM  |
10/22/2018  |
8 AM - 12 PM  |
10/22/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
10/19/2018 1:50:51 PM  |
10/22/2018  |
8 AM - 12 PM  |
10/22/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
10/19/2018 1:51:31 PM  |
10/22/2018  |
8 AM - 12 PM  |
10/22/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
10/22/2018 12:49:24 PM  |
10/23/2018  |
8 AM - 12 PM  |
10/23/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/22/2018 12:49:30 PM  |
10/23/2018  |
8 AM - 12 PM  |
10/23/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
10/22/2018 12:49:34 PM  |
10/23/2018  |
8 AM - 12 PM  |
10/23/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/22/2018 12:49:43 PM  |
10/23/2018  |
8 AM - 12 PM  |
10/23/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/23/2018 2:25:25 PM  |
10/24/2018  |
12 PM - 3 PM  |
10/24/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/23/2018 2:25:30 PM  |
10/24/2018  |
12 PM - 3 PM  |
10/24/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/23/2018 2:25:36 PM  |
10/24/2018  |
12 PM - 3 PM  |
10/24/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/23/2018 2:25:44 PM  |
10/24/2018  |
12 PM - 3 PM  |
10/24/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/24/2018 1:45:07 PM  |
10/25/2018  |
12 PM - 3 PM  |
10/25/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/24/2018 1:45:13 PM  |
10/25/2018  |
12 PM - 3 PM  |
10/25/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/24/2018 1:45:21 PM  |
10/25/2018  |
12 PM - 3 PM  |
10/25/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/24/2018 1:45:32 PM  |
10/25/2018  |
12 PM - 3 PM  |
10/25/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/25/2018 1:33:52 PM  |
10/26/2018  |
12 PM - 3 PM  |
10/26/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/25/2018 1:34:00 PM  |
10/26/2018  |
12 PM - 3 PM  |
10/26/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/25/2018 1:34:07 PM  |
10/26/2018  |
12 PM - 3 PM  |
10/26/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
10/25/2018 1:34:13 PM  |
10/26/2018  |
12 PM - 3 PM  |
10/26/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/25/2018  |
10/27/2018  |
  |
10/30/2018  |
P  |
BEN  |
ELE - Rough Electrical  |
10/25/2018  |
10/30/2018  |
8 AM - 12 PM  |
10/30/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
10/26/2018 10:40:54 AM  |
10/29/2018  |
8 AM - 12 PM  |
10/29/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
10/26/2018 10:40:59 AM  |
10/29/2018  |
8 AM - 12 PM  |
10/29/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
10/26/2018 10:41:05 AM  |
10/29/2018  |
8 AM - 12 PM  |
10/29/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
10/26/2018 10:41:19 AM  |
10/29/2018  |
8 AM - 12 PM  |
10/29/2018  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
10/26/2018 10:41:37 AM  |
10/29/2018  |
8 AM - 12 PM  |
10/29/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
10/29/2018 1:46:15 PM  |
10/30/2018  |
8 AM - 12 PM  |
10/30/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/29/2018 1:46:22 PM  |
10/30/2018  |
8 AM - 12 PM  |
10/30/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/29/2018 1:46:32 PM  |
10/30/2018  |
8 AM - 12 PM  |
10/30/2018  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
10/29/2018 1:46:38 PM  |
10/30/2018  |
8 AM - 12 PM  |
10/30/2018  |
P  |
BEN  |
BLD -Floor Joists/Girders Insp  |
10/29/2018 1:46:59 PM  |
10/30/2018  |
8 AM - 12 PM  |
10/30/2018  |
P  |
BEN  |
BLD - Roof Sheathing Insp.  |
10/29/2018 2:16:29 PM  |
10/30/2018  |
8 AM - 12 PM  |
10/30/2018  |
C  |
BEN  |
BLD - Roof Sheathing Insp.  |
10/30/2018 12:59:14 PM  |
10/31/2018  |
8 AM - 12 PM  |
10/31/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/30/2018 12:59:42 PM  |
10/31/2018  |
8 AM - 12 PM  |
10/31/2018  |
P  |
BEN  |
BLD - T-Bar (Structural) Insp  |
10/30/2018 12:59:52 PM  |
10/31/2018  |
8 AM - 12 PM  |
10/31/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
10/31/2018 1:35:42 PM  |
11/1/2018  |
12 PM - 3 PM  |
11/1/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/31/2018 1:35:48 PM  |
11/1/2018  |
12 PM - 3 PM  |
11/1/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
10/31/2018 1:35:53 PM  |
11/1/2018  |
12 PM - 3 PM  |
11/1/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
10/31/2018 1:36:01 PM  |
11/1/2018  |
12 PM - 3 PM  |
11/1/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/1/2018 10:03:50 AM  |
11/2/2018  |
12 PM - 3 PM  |
11/2/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/1/2018 10:03:56 AM  |
11/2/2018  |
12 PM - 3 PM  |
11/2/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/1/2018 10:04:01 AM  |
11/2/2018  |
12 PM - 3 PM  |
11/2/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/1/2018 10:04:08 AM  |
11/2/2018  |
12 PM - 3 PM  |
11/2/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/4/2018 1:00:51 PM  |
11/5/2018  |
8 AM - 12 PM  |
11/5/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
11/4/2018 1:01:04 PM  |
11/5/2018  |
8 AM - 12 PM  |
11/5/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
11/4/2018 1:01:12 PM  |
11/5/2018  |
8 AM - 12 PM  |
11/5/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
11/4/2018 1:01:23 PM  |
11/5/2018  |
8 AM - 12 PM  |
11/5/2018  |
C  |
PJJ  |
MEC - Rough Mechanical  |
11/4/2018 1:01:44 PM  |
11/5/2018  |
8 AM - 12 PM  |
11/5/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
11/5/2018 1:34:00 PM  |
11/6/2018  |
12 PM - 3 PM  |
11/6/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/5/2018 1:34:08 PM  |
11/6/2018  |
12 PM - 3 PM  |
11/6/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/5/2018 1:34:15 PM  |
11/6/2018  |
12 PM - 3 PM  |
11/6/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/5/2018 1:34:46 PM  |
11/6/2018  |
12 PM - 3 PM  |
11/6/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/6/2018 2:19:34 PM  |
11/7/2018  |
  |
11/7/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
11/6/2018 2:19:40 PM  |
11/7/2018  |
  |
11/7/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
11/6/2018 2:19:46 PM  |
11/7/2018  |
  |
11/7/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
11/6/2018 2:19:55 PM  |
11/7/2018  |
  |
11/7/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
11/7/2018 1:59:11 PM  |
11/8/2018  |
8 AM - 12 PM  |
11/8/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
11/7/2018 1:59:18 PM  |
11/8/2018  |
8 AM - 12 PM  |
11/8/2018  |
P  |
PJJ  |
BLD - Exterior Lath Insp  |
11/7/2018 1:59:23 PM  |
11/8/2018  |
8 AM - 12 PM  |
11/8/2018  |
P  |
PJJ  |
ELE - Rough Electrical  |
11/7/2018 1:59:31 PM  |
11/8/2018  |
8 AM - 12 PM  |
11/8/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
11/8/2018 10:17:03 AM  |
11/9/2018  |
12 PM - 3 PM  |
11/9/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/8/2018 10:17:09 AM  |
11/9/2018  |
12 PM - 3 PM  |
11/9/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/8/2018 10:17:15 AM  |
11/9/2018  |
12 PM - 3 PM  |
11/9/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/8/2018 10:17:22 AM  |
11/9/2018  |
12 PM - 3 PM  |
11/9/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/9/2018 10:06:33 AM  |
11/13/2018  |
8 AM - 12 PM  |
11/13/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
11/9/2018 10:06:38 AM  |
11/13/2018  |
8 AM - 12 PM  |
11/13/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
11/9/2018 10:06:43 AM  |
11/13/2018  |
8 AM - 12 PM  |
11/13/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
11/9/2018 10:06:50 AM  |
11/13/2018  |
8 AM - 12 PM  |
11/13/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
11/13/2018 12:12:17 PM  |
11/14/2018  |
12 PM - 3 PM  |
11/14/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
11/13/2018 12:12:28 PM  |
11/14/2018  |
12 PM - 3 PM  |
11/14/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/13/2018 12:12:35 PM  |
11/14/2018  |
12 PM - 3 PM  |
11/14/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/13/2018 12:12:42 PM  |
11/14/2018  |
12 PM - 3 PM  |
11/14/2018  |
C  |
BEN  |
BLD - Footings Insp  |
11/14/2018 3:01:44 PM  |
11/15/2018  |
8 AM - 12 PM  |
11/15/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/14/2018 3:01:55 PM  |
11/15/2018  |
8 AM - 12 PM  |
11/15/2018  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
11/14/2018 3:02:06 PM  |
11/15/2018  |
8 AM - 12 PM  |
11/15/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/14/2018 3:02:15 PM  |
11/15/2018  |
8 AM - 12 PM  |
11/15/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/15/2018 1:33:33 PM  |
11/16/2018  |
12 PM - 3 PM  |
11/16/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/15/2018 1:35:00 PM  |
11/16/2018  |
12 PM - 3 PM  |
11/16/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/15/2018 1:35:05 PM  |
11/16/2018  |
12 PM - 3 PM  |
11/16/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/15/2018 1:35:11 PM  |
11/16/2018  |
12 PM - 3 PM  |
11/16/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/16/2018 11:22:30 AM  |
11/19/2018  |
10 AM - 2 PM  |
11/19/2018  |
P  |
GCT  |
BLD - Drywall Inspection  |
11/16/2018 11:22:36 AM  |
11/19/2018  |
10 AM - 2 PM  |
11/19/2018  |
P  |
GCT  |
BLD - Exterior Lath Insp  |
11/16/2018 11:22:42 AM  |
11/19/2018  |
10 AM - 2 PM  |
11/19/2018  |
P  |
GCT  |
ELE - Rough Electrical  |
11/16/2018 11:22:51 AM  |
11/19/2018  |
10 AM - 2 PM  |
11/19/2018  |
P  |
GCT  |
BLD - Framing Insp.  |
11/19/2018 11:20:16 AM  |
11/20/2018  |
8 AM - 12 PM  |
11/20/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/19/2018 11:20:23 AM  |
11/20/2018  |
8 AM - 12 PM  |
11/20/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/19/2018 11:20:34 AM  |
11/20/2018  |
8 AM - 12 PM  |
11/20/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/19/2018 11:20:47 AM  |
11/20/2018  |
8 AM - 12 PM  |
11/20/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/20/2018 6:00:35 AM  |
11/21/2018  |
8 AM - 12 PM  |
11/21/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/20/2018 6:00:42 AM  |
11/21/2018  |
8 AM - 12 PM  |
11/21/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/20/2018 6:00:49 AM  |
11/21/2018  |
8 AM - 12 PM  |
11/21/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/20/2018 6:00:56 AM  |
11/21/2018  |
8 AM - 12 PM  |
11/21/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/21/2018 6:10:46 AM  |
11/26/2018  |
8 AM - 12 PM  |
11/26/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
11/21/2018 6:10:51 AM  |
11/26/2018  |
8 AM - 12 PM  |
11/26/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
11/21/2018 6:10:57 AM  |
11/26/2018  |
8 AM - 12 PM  |
11/26/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
11/21/2018 6:11:06 AM  |
11/26/2018  |
8 AM - 12 PM  |
11/26/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
11/26/2018 12:30:32 PM  |
11/27/2018  |
12 PM - 3 PM  |
11/27/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/26/2018 12:30:39 PM  |
11/27/2018  |
12 PM - 3 PM  |
11/27/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/26/2018 12:30:46 PM  |
11/27/2018  |
12 PM - 3 PM  |
11/27/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/26/2018 12:30:53 PM  |
11/27/2018  |
12 PM - 3 PM  |
11/27/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/27/2018 11:18:57 AM  |
11/28/2018  |
8 AM - 12 PM  |
11/28/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/27/2018 11:19:03 AM  |
11/28/2018  |
8 AM - 12 PM  |
11/28/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/27/2018 11:19:13 AM  |
11/28/2018  |
8 AM - 12 PM  |
11/28/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/27/2018 11:19:22 AM  |
11/28/2018  |
8 AM - 12 PM  |
11/28/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/28/2018 11:35:20 AM  |
11/29/2018  |
12 PM - 3 PM  |
11/29/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/28/2018 11:35:26 AM  |
11/29/2018  |
12 PM - 3 PM  |
11/29/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/28/2018 11:35:33 AM  |
11/29/2018  |
12 PM - 3 PM  |
11/29/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/28/2018 11:35:44 AM  |
11/29/2018  |
12 PM - 3 PM  |
11/29/2018  |
C  |
BEN  |
MEC - Rough Duct  |
11/28/2018 2:29:57 PM  |
11/29/2018  |
12 PM - 3 PM  |
11/29/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/29/2018 12:16:38 PM  |
11/30/2018  |
8 AM - 12 PM  |
11/30/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/29/2018 12:16:43 PM  |
11/30/2018  |
8 AM - 12 PM  |
11/30/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/29/2018 12:16:48 PM  |
11/30/2018  |
8 AM - 12 PM  |
11/30/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
11/29/2018 12:16:57 PM  |
11/30/2018  |
8 AM - 12 PM  |
11/30/2018  |
C  |
BEN  |
MEC - Rough Duct  |
11/29/2018 12:17:08 PM  |
11/30/2018  |
8 AM - 12 PM  |
11/30/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
11/30/2018 11:31:10 AM  |
12/3/2018  |
8 AM - 12 PM  |
12/3/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
11/30/2018 11:31:15 AM  |
12/3/2018  |
8 AM - 12 PM  |
12/3/2018  |
P  |
PJJ  |
BLD - Exterior Lath Insp  |
11/30/2018 11:31:20 AM  |
12/3/2018  |
8 AM - 12 PM  |
12/3/2018  |
P  |
PJJ  |
ELE - Rough Electrical  |
11/30/2018 11:31:31 AM  |
12/3/2018  |
8 AM - 12 PM  |
12/3/2018  |
P  |
PJJ  |
MEC - Rough Duct  |
11/30/2018 11:31:38 AM  |
12/3/2018  |
8 AM - 12 PM  |
12/3/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
12/3/2018 12:03:03 PM  |
12/4/2018  |
8 AM - 12 PM  |
12/4/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
12/3/2018 12:03:08 PM  |
12/4/2018  |
8 AM - 12 PM  |
12/4/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
12/3/2018 12:03:15 PM  |
12/4/2018  |
8 AM - 12 PM  |
12/4/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
12/3/2018 12:03:22 PM  |
12/4/2018  |
8 AM - 12 PM  |
12/4/2018  |
C  |
PJJ  |
MEC - Rough Duct  |
12/3/2018 12:03:33 PM  |
12/4/2018  |
8 AM - 12 PM  |
12/4/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
12/4/2018 2:13:48 PM  |
12/5/2018  |
8 AM - 12 PM  |
12/5/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
12/4/2018 2:13:54 PM  |
12/5/2018  |
8 AM - 12 PM  |
12/5/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
12/4/2018 2:14:02 PM  |
12/5/2018  |
8 AM - 12 PM  |
12/5/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
12/4/2018 2:14:11 PM  |
12/5/2018  |
8 AM - 12 PM  |
12/5/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
12/5/2018 2:27:18 PM  |
12/6/2018  |
8 AM - 12 PM  |
12/6/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
12/5/2018 2:27:23 PM  |
12/6/2018  |
8 AM - 12 PM  |
12/6/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
12/5/2018 2:29:31 PM  |
12/6/2018  |
8 AM - 12 PM  |
12/6/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
12/5/2018 2:29:43 PM  |
12/6/2018  |
8 AM - 12 PM  |
12/6/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
12/6/2018 1:13:58 PM  |
12/7/2018  |
8 AM - 12 PM  |
12/7/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
12/6/2018 1:14:08 PM  |
12/7/2018  |
8 AM - 12 PM  |
12/7/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
12/6/2018 1:14:14 PM  |
12/7/2018  |
8 AM - 12 PM  |
12/7/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
12/6/2018 1:14:24 PM  |
12/7/2018  |
8 AM - 12 PM  |
12/7/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
12/9/2018 2:18:43 PM  |
12/10/2018  |
8 AM - 12 PM  |
12/10/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
12/9/2018 2:18:55 PM  |
12/10/2018  |
8 AM - 12 PM  |
12/10/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
12/9/2018 2:19:20 PM  |
12/10/2018  |
8 AM - 12 PM  |
12/10/2018  |
C  |
PJJ  |
ELE - Penetrations- Fire Rated  |
12/9/2018 2:19:36 PM  |
12/10/2018  |
8 AM - 12 PM  |
12/10/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
12/14/2018 9:59:05 AM  |
12/17/2018  |
10 AM - 2 PM  |
12/17/2018  |
C  |
JOS  |
BLD - Exterior Lath Insp  |
12/14/2018 9:59:11 AM  |
12/17/2018  |
10 AM - 2 PM  |
12/17/2018  |
C  |
JOS  |
BLD - Drywall Inspection  |
12/14/2018 9:59:18 AM  |
12/17/2018  |
10 AM - 2 PM  |
12/17/2018  |
C  |
JOS  |
ELE - Rough Electrical  |
12/14/2018 9:59:26 AM  |
12/17/2018  |
10 AM - 2 PM  |
12/17/2018  |
C  |
JOS  |
BLD - T-Bar (Structural) Insp  |
12/16/2018 3:34:23 PM  |
12/17/2018  |
10 AM - 2 PM  |
12/17/2018  |
C  |
JOS  |
BLD - T-Bar (Structural) Insp  |
12/17/2018 11:48:46 AM  |
12/18/2018  |
  |
12/19/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
12/17/2018 11:48:55 AM  |
12/18/2018  |
  |
12/19/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
12/17/2018 11:49:04 AM  |
12/18/2018  |
  |
12/19/2018  |
C  |
PJJ  |
MEC - Rough Duct  |
12/17/2018 12:50:33 PM  |
12/18/2018  |
12 PM - 3 PM  |
12/19/2018  |
C  |
PJJ  |
MEC - Rough Mechanical  |
12/17/2018 12:50:42 PM  |
12/18/2018  |
12 PM - 3 PM  |
12/19/2018  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
12/18/2018 10:20:16 AM  |
12/19/2018  |
8 AM - 12 PM  |
12/19/2018  |
C  |
PJJ  |
MEC - Rough Duct  |
12/18/2018 10:20:25 AM  |
12/19/2018  |
8 AM - 12 PM  |
12/19/2018  |
C  |
PJJ  |
MEC - Rough Mechanical  |
12/18/2018 10:20:32 AM  |
12/19/2018  |
8 AM - 12 PM  |
12/19/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
12/19/2018 11:12:21 AM  |
12/20/2018  |
8 AM - 12 PM  |
12/20/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
12/19/2018 11:12:26 AM  |
12/20/2018  |
8 AM - 12 PM  |
12/20/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
12/19/2018 11:12:40 AM  |
12/20/2018  |
8 AM - 12 PM  |
12/20/2018  |
P  |
BEN  |
BLD - Roof Sheathing Insp.  |
12/19/2018 11:13:09 AM  |
12/20/2018  |
8 AM - 12 PM  |
12/20/2018  |
C  |
BEN  |
BLD - Drywall Inspection  |
12/19/2018 11:19:06 AM  |
12/20/2018  |
8 AM - 12 PM  |
12/20/2018  |
P  |
BEN  |
BLD - Framing Insp.  |
12/20/2018 2:08:29 PM  |
12/21/2018  |
8 AM - 12 PM  |
12/21/2018  |
P  |
BEN  |
BLD - Drywall Inspection  |
12/20/2018 2:08:35 PM  |
12/21/2018  |
8 AM - 12 PM  |
12/21/2018  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
12/20/2018 2:08:40 PM  |
12/21/2018  |
8 AM - 12 PM  |
12/21/2018  |
C  |
BEN  |
BLD - Roof Sheathing Insp.  |
12/20/2018 2:08:46 PM  |
12/21/2018  |
8 AM - 12 PM  |
12/21/2018  |
C  |
BEN  |
ELE - Rough Electrical  |
12/20/2018 2:08:54 PM  |
12/21/2018  |
8 AM - 12 PM  |
12/21/2018  |
C  |
BEN  |
BLD - Framing Insp.  |
12/21/2018 10:31:13 AM  |
12/24/2018  |
8 AM - 12 PM  |
12/24/2018  |
C  |
PJJ  |
BLD - Drywall Inspection  |
12/21/2018 10:31:20 AM  |
12/24/2018  |
8 AM - 12 PM  |
12/24/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
12/21/2018 10:31:27 AM  |
12/24/2018  |
8 AM - 12 PM  |
12/24/2018  |
C  |
PJJ  |
ELE - Rough Electrical  |
12/21/2018 10:31:34 AM  |
12/24/2018  |
8 AM - 12 PM  |
12/24/2018  |
C  |
PJJ  |
BLD - Framing Insp.  |
12/25/2018 5:19:53 AM  |
12/26/2018  |
8 AM - 12 PM  |
12/26/2018  |
P  |
PJJ  |
BLD - Drywall Inspection  |
12/25/2018 5:20:05 AM  |
12/26/2018  |
8 AM - 12 PM  |
12/26/2018  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
12/25/2018 5:20:21 AM  |
12/26/2018  |
8 AM - 12 PM  |
12/26/2018  |
P  |
PJJ  |
ELE - Rough Electrical  |
12/25/2018 5:20:38 AM  |
12/26/2018  |
8 AM - 12 PM  |
12/26/2018  |
P  |
PJJ  |
BLD - Framing Insp.  |
1/2/2019 1:35:33 PM  |
1/3/2019  |
12 PM - 3 PM  |
1/3/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/2/2019 1:35:38 PM  |
1/3/2019  |
12 PM - 3 PM  |
1/3/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/2/2019 1:35:46 PM  |
1/3/2019  |
12 PM - 3 PM  |
1/3/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/2/2019 1:35:59 PM  |
1/3/2019  |
12 PM - 3 PM  |
1/3/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/3/2019 1:32:24 PM  |
1/4/2019  |
10 AM - 2 PM  |
1/4/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/3/2019 1:32:30 PM  |
1/4/2019  |
10 AM - 2 PM  |
1/4/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/3/2019 1:32:36 PM  |
1/4/2019  |
10 AM - 2 PM  |
1/4/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/3/2019 1:32:48 PM  |
1/4/2019  |
10 AM - 2 PM  |
1/4/2019  |
C  |
BEN  |
MEC - Rough Duct  |
1/3/2019 1:33:05 PM  |
1/4/2019  |
10 AM - 2 PM  |
1/4/2019  |
N  |
BEN  |
MEC - Rough Mechanical  |
1/3/2019 1:33:15 PM  |
1/4/2019  |
10 AM - 2 PM  |
1/4/2019  |
N  |
BEN  |
BLD - Framing Insp.  |
1/4/2019 1:40:07 PM  |
1/7/2019  |
10 AM - 2 PM  |
1/7/2019  |
C  |
PJJ  |
BLD - Drywall Inspection  |
1/4/2019 1:40:12 PM  |
1/7/2019  |
10 AM - 2 PM  |
1/7/2019  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
1/4/2019 1:40:17 PM  |
1/7/2019  |
10 AM - 2 PM  |
1/7/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
1/4/2019 1:40:28 PM  |
1/7/2019  |
10 AM - 2 PM  |
1/7/2019  |
C  |
PJJ  |
MEC - Rough Duct  |
1/4/2019 1:41:10 PM  |
1/7/2019  |
10 AM - 2 PM  |
1/7/2019  |
C  |
PJJ  |
MEC - Rough Mechanical  |
1/4/2019 1:41:18 PM  |
1/7/2019  |
10 AM - 2 PM  |
1/7/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
1/7/2019 1:01:32 PM  |
1/8/2019  |
12 PM - 3 PM  |
1/8/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/7/2019 1:01:37 PM  |
1/8/2019  |
12 PM - 3 PM  |
1/8/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/7/2019 1:01:52 PM  |
1/8/2019  |
12 PM - 3 PM  |
1/8/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/7/2019 1:02:01 PM  |
1/8/2019  |
12 PM - 3 PM  |
1/8/2019  |
C  |
BEN  |
MEC - Rough Mechanical  |
1/7/2019 1:02:09 PM  |
1/8/2019  |
12 PM - 3 PM  |
1/8/2019  |
N  |
BEN  |
MEC - Rough Duct  |
1/7/2019 1:02:19 PM  |
1/8/2019  |
12 PM - 3 PM  |
1/8/2019  |
N  |
BEN  |
BLD - Framing Insp.  |
1/8/2019 1:35:00 PM  |
1/9/2019  |
8 AM - 12 PM  |
1/9/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/8/2019 1:35:06 PM  |
1/9/2019  |
8 AM - 12 PM  |
1/9/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/8/2019 1:35:13 PM  |
1/9/2019  |
8 AM - 12 PM  |
1/9/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/8/2019 1:35:23 PM  |
1/9/2019  |
8 AM - 12 PM  |
1/9/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/9/2019 11:28:02 AM  |
1/10/2019  |
8 AM - 12 PM  |
1/10/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/9/2019 11:28:08 AM  |
1/10/2019  |
8 AM - 12 PM  |
1/10/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/9/2019 11:28:18 AM  |
1/10/2019  |
8 AM - 12 PM  |
1/10/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/9/2019 11:28:35 AM  |
1/10/2019  |
8 AM - 12 PM  |
1/10/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/10/2019 1:55:35 PM  |
1/11/2019  |
8 AM - 12 PM  |
1/11/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/10/2019 1:56:07 PM  |
1/11/2019  |
8 AM - 12 PM  |
1/11/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/10/2019 1:56:15 PM  |
1/11/2019  |
8 AM - 12 PM  |
1/11/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/13/2019 1:57:50 PM  |
1/14/2019  |
8 AM - 12 PM  |
1/14/2019  |
C  |
PJJ  |
BLD - Drywall Inspection  |
1/13/2019 1:58:02 PM  |
1/14/2019  |
8 AM - 12 PM  |
1/14/2019  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
1/13/2019 1:58:17 PM  |
1/14/2019  |
8 AM - 12 PM  |
1/14/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
1/13/2019 1:58:32 PM  |
1/14/2019  |
8 AM - 12 PM  |
1/14/2019  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
1/13/2019 1:59:28 PM  |
1/14/2019  |
8 AM - 12 PM  |
1/14/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
1/14/2019 1:24:10 PM  |
1/15/2019  |
8 AM - 12 PM  |
1/15/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/14/2019 1:24:16 PM  |
1/15/2019  |
8 AM - 12 PM  |
1/15/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/14/2019 1:24:23 PM  |
1/15/2019  |
8 AM - 12 PM  |
1/15/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/14/2019 1:24:33 PM  |
1/15/2019  |
8 AM - 12 PM  |
1/15/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/15/2019 8:47:24 AM  |
1/16/2019  |
10 AM - 2 PM  |
1/16/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/15/2019 8:47:56 AM  |
1/16/2019  |
10 AM - 2 PM  |
1/16/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/15/2019 8:48:04 AM  |
1/16/2019  |
10 AM - 2 PM  |
1/16/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/15/2019 8:48:12 AM  |
1/16/2019  |
10 AM - 2 PM  |
1/16/2019  |
C  |
BEN  |
MEC - Rough Mechanical  |
1/15/2019 9:05:18 PM  |
1/16/2019  |
10 AM - 2 PM  |
1/16/2019  |
C  |
BEN  |
MEC - Rough Duct  |
1/15/2019 9:05:31 PM  |
1/16/2019  |
10 AM - 2 PM  |
1/16/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/16/2019 11:05:28 AM  |
1/17/2019  |
8 AM - 12 PM  |
1/17/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/16/2019 11:05:37 AM  |
1/17/2019  |
8 AM - 12 PM  |
1/17/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/16/2019 11:05:49 AM  |
1/17/2019  |
8 AM - 12 PM  |
1/17/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/17/2019 8:13:39 AM  |
1/18/2019  |
12 PM - 3 PM  |
1/18/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/17/2019 8:13:46 AM  |
1/18/2019  |
12 PM - 3 PM  |
1/18/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/17/2019 8:13:55 AM  |
1/18/2019  |
12 PM - 3 PM  |
1/18/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/18/2019 10:41:21 AM  |
1/22/2019  |
10 AM - 2 PM  |
1/22/2019  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
1/18/2019 10:41:28 AM  |
1/22/2019  |
10 AM - 2 PM  |
1/22/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
1/18/2019 10:41:40 AM  |
1/22/2019  |
10 AM - 2 PM  |
1/22/2019  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
1/21/2019 1:39:13 PM  |
1/22/2019  |
10 AM - 2 PM  |
1/22/2019  |
C  |
PJJ  |
ELE - T-Bar Electrical  |
1/21/2019 1:39:25 PM  |
1/22/2019  |
10 AM - 2 PM  |
1/22/2019  |
C  |
PJJ  |
MEC - Rough Mechanical  |
1/21/2019 1:59:10 PM  |
1/22/2019  |
10 AM - 2 PM  |
1/22/2019  |
C  |
PJJ  |
MEC - Rough Duct  |
1/21/2019 1:59:19 PM  |
1/22/2019  |
10 AM - 2 PM  |
1/22/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
1/22/2019 9:42:02 AM  |
1/23/2019  |
12 PM - 3 PM  |
1/23/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/22/2019 9:42:07 AM  |
1/23/2019  |
12 PM - 3 PM  |
1/23/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/22/2019 9:42:11 AM  |
1/23/2019  |
12 PM - 3 PM  |
1/23/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/22/2019 9:42:17 AM  |
1/23/2019  |
12 PM - 3 PM  |
1/23/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
1/22/2019 9:42:24 AM  |
1/23/2019  |
12 PM - 3 PM  |
1/23/2019  |
C  |
BEN  |
MEC - Rough Duct  |
1/22/2019 9:42:34 AM  |
1/23/2019  |
12 PM - 3 PM  |
1/23/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/23/2019 11:12:15 AM  |
1/24/2019  |
8 AM - 12 PM  |
1/24/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/23/2019 11:12:20 AM  |
1/24/2019  |
8 AM - 12 PM  |
1/24/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/23/2019 11:12:27 AM  |
1/24/2019  |
8 AM - 12 PM  |
1/24/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
1/23/2019 11:12:36 AM  |
1/24/2019  |
8 AM - 12 PM  |
1/24/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/23/2019 11:12:44 AM  |
1/24/2019  |
8 AM - 12 PM  |
1/24/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/24/2019 6:42:52 AM  |
1/25/2019  |
8 AM - 12 PM  |
1/25/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/24/2019 6:42:59 AM  |
1/25/2019  |
8 AM - 12 PM  |
1/25/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/24/2019 6:43:07 AM  |
1/25/2019  |
8 AM - 12 PM  |
1/25/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/24/2019 6:43:34 AM  |
1/25/2019  |
8 AM - 12 PM  |
1/25/2019  |
N  |
BEN  |
BLD - T-Bar (Structural) Insp  |
1/24/2019 6:43:46 AM  |
1/25/2019  |
8 AM - 12 PM  |
1/25/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/25/2019 10:08:59 AM  |
1/28/2019  |
10 AM - 2 PM  |
1/28/2019  |
C  |
PJJ  |
BLD - Drywall Inspection  |
1/25/2019 10:09:42 AM  |
1/28/2019  |
10 AM - 2 PM  |
1/28/2019  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
1/25/2019 10:09:49 AM  |
1/28/2019  |
10 AM - 2 PM  |
1/28/2019  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
1/25/2019 10:09:57 AM  |
1/28/2019  |
10 AM - 2 PM  |
1/28/2019  |
P  |
PJJ  |
ELE - Rough Electrical  |
1/25/2019 10:10:09 AM  |
1/28/2019  |
10 AM - 2 PM  |
1/28/2019  |
P  |
PJJ  |
Approved by Planning Zoning  |
1/24/2019  |
  |
  |
1/31/2019 11:23:51 AM  |
APPR  |
EYT  |
Route to Planning Zoning  |
1/24/2019  |
2/11/2019  |
  |
1/31/2019  |
APPR  |
EYT  |
Apprv. by PW Develop. Services  |
1/24/2019  |
  |
  |
1/30/2019 10:44:16 AM  |
APPR  |
SXA  |
Route to PW Develop. Services  |
1/24/2019  |
2/11/2019  |
  |
1/30/2019  |
APPR  |
SXA  |
Approved by Traffic Eng.  |
1/24/2019  |
  |
  |
1/30/2019 10:19:09 AM  |
APPR  |
RXC  |
Route to Traffic Engineering  |
1/24/2019  |
2/11/2019  |
  |
1/30/2019  |
APPR  |
RXC  |
Apprv. by Struct/Architectural  |
1/24/2019  |
  |
  |
1/31/2019 2:48:43 PM  |
APPR  |
CSG  |
Route to Struct/Architectual  |
1/24/2019  |
2/11/2019  |
  |
1/31/2019  |
APPR  |
CSG  |
Route to Fire Department  |
1/24/2019  |
2/11/2019  |
  |
2/5/2019  |
NR  |
EPO  |
Approved by Fire Department  |
1/24/2019  |
  |
  |
2/5/2019 10:48:06 AM  |
NR  |
EPO  |
BLD - Framing Insp.  |
1/28/2019 10:31:23 AM  |
1/29/2019  |
8 AM - 12 PM  |
1/29/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/28/2019 10:31:47 AM  |
1/29/2019  |
8 AM - 12 PM  |
1/29/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/28/2019 10:31:54 AM  |
1/29/2019  |
8 AM - 12 PM  |
1/29/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
1/28/2019 10:32:04 AM  |
1/29/2019  |
8 AM - 12 PM  |
1/29/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/28/2019 10:32:14 AM  |
1/29/2019  |
8 AM - 12 PM  |
1/29/2019  |
C  |
BEN  |
MEC - Rough Duct  |
1/28/2019 12:47:23 PM  |
1/29/2019  |
8 AM - 12 PM  |
1/29/2019  |
N  |
BEN  |
MEC - Rough Mechanical  |
1/28/2019 12:47:31 PM  |
1/29/2019  |
8 AM - 12 PM  |
1/29/2019  |
N  |
BEN  |
BLD - Framing Insp.  |
1/29/2019 9:37:36 AM  |
1/30/2019  |
12 PM - 3 PM  |
1/30/2019  |
C  |
BEN  |
BLD - Pre-Slab Insp  |
1/29/2019 9:37:55 AM  |
1/30/2019  |
12 PM - 3 PM  |
1/30/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
1/29/2019 9:38:20 AM  |
1/30/2019  |
12 PM - 3 PM  |
1/30/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/29/2019 9:38:26 AM  |
1/30/2019  |
12 PM - 3 PM  |
1/30/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/29/2019 9:38:36 AM  |
1/30/2019  |
12 PM - 3 PM  |
1/30/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/30/2019 12:25:16 PM  |
1/31/2019  |
12 PM - 3 PM  |
1/31/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
1/30/2019 12:25:25 PM  |
1/31/2019  |
12 PM - 3 PM  |
1/31/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/30/2019 12:25:32 PM  |
1/31/2019  |
12 PM - 3 PM  |
1/31/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
1/31/2019 11:03:16 AM  |
2/1/2019  |
8 AM - 12 PM  |
2/1/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
1/31/2019 11:03:26 AM  |
2/1/2019  |
8 AM - 12 PM  |
2/1/2019  |
C  |
BEN  |
MEC - Rough Duct  |
1/31/2019 2:20:52 PM  |
2/1/2019  |
8 AM - 12 PM  |
2/1/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
2/1/2019 10:54:49 AM  |
2/4/2019  |
8 AM - 12 PM  |
2/4/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
2/1/2019 10:54:57 AM  |
2/4/2019  |
8 AM - 12 PM  |
2/4/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
2/4/2019 1:29:20 PM  |
2/5/2019  |
8 AM - 12 PM  |
2/5/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/4/2019 1:29:27 PM  |
2/5/2019  |
8 AM - 12 PM  |
2/5/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
2/5/2019 11:22:57 AM  |
2/6/2019  |
8 AM - 12 PM  |
2/6/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/5/2019 11:23:07 AM  |
2/6/2019  |
8 AM - 12 PM  |
2/6/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
2/6/2019 10:59:22 AM  |
2/7/2019  |
12 PM - 3 PM  |
2/7/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/6/2019 10:59:31 AM  |
2/7/2019  |
12 PM - 3 PM  |
2/7/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
2/7/2019 12:18:54 PM  |
2/8/2019  |
12 PM - 3 PM  |
2/8/2019  |
P  |
BEN  |
ELE - Rough Electrical  |
2/7/2019 12:19:01 PM  |
2/8/2019  |
12 PM - 3 PM  |
2/8/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
2/8/2019 7:51:06 AM  |
2/11/2019  |
10 AM - 2 PM  |
2/11/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
2/8/2019 7:51:13 AM  |
2/11/2019  |
10 AM - 2 PM  |
2/11/2019  |
P  |
PJJ  |
BLD - Reinforcing Insp  |
2/10/2019 1:43:51 PM  |
2/11/2019  |
10 AM - 2 PM  |
2/11/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
2/11/2019 11:51:59 AM  |
2/12/2019  |
8 AM - 12 PM  |
2/12/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/11/2019 11:52:11 AM  |
2/12/2019  |
8 AM - 12 PM  |
2/12/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/11/2019 12:54:22 PM  |
2/12/2019  |
8 AM - 12 PM  |
2/12/2019  |
N  |
BEN  |
BLD - Framing Insp.  |
2/12/2019 1:27:08 PM  |
2/13/2019  |
8 AM - 12 PM  |
2/13/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
2/12/2019 1:27:14 PM  |
2/13/2019  |
8 AM - 12 PM  |
2/13/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/12/2019 1:27:22 PM  |
2/13/2019  |
8 AM - 12 PM  |
2/13/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/12/2019 1:27:32 PM  |
2/13/2019  |
8 AM - 12 PM  |
2/13/2019  |
C  |
BEN  |
PLM - Gas Test  |
2/12/2019 1:27:51 PM  |
2/13/2019  |
8 AM - 12 PM  |
2/13/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
2/13/2019 10:54:31 AM  |
2/14/2019  |
8 AM - 12 PM  |
2/14/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
2/13/2019 10:54:38 AM  |
2/14/2019  |
8 AM - 12 PM  |
2/14/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/13/2019 10:54:46 AM  |
2/14/2019  |
8 AM - 12 PM  |
2/14/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
2/14/2019 1:11:13 PM  |
2/15/2019  |
8 AM - 12 PM  |
2/15/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
2/14/2019 1:11:18 PM  |
2/15/2019  |
8 AM - 12 PM  |
2/15/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/14/2019 1:11:28 PM  |
2/15/2019  |
8 AM - 12 PM  |
2/15/2019  |
C  |
BEN  |
PLM - Gas Test  |
2/14/2019 1:13:41 PM  |
2/15/2019  |
8 AM - 12 PM  |
2/15/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
2/18/2019 10:52:41 AM  |
2/19/2019  |
8 AM - 12 PM  |
2/19/2019  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
2/18/2019 10:52:48 AM  |
2/19/2019  |
8 AM - 12 PM  |
2/19/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
2/18/2019 10:52:58 AM  |
2/19/2019  |
8 AM - 12 PM  |
2/19/2019  |
C  |
PJJ  |
PLM - Underground gas  |
2/18/2019 10:53:10 AM  |
2/19/2019  |
8 AM - 12 PM  |
2/19/2019  |
P  |
PJJ  |
Route to Fire Department  |
2/15/2019  |
3/6/2019  |
  |
2/27/2019  |
NR  |
EPO  |
Approved by Fire Department  |
2/15/2019  |
  |
  |
2/27/2019 11:37:46 AM  |
NR  |
EPO  |
Approved by Planning Zoning  |
2/15/2019  |
  |
  |
2/21/2019 1:05:33 PM  |
APPR  |
EYT  |
Route to Planning Zoning  |
2/15/2019  |
3/6/2019  |
  |
2/21/2019  |
APPR  |
EYT  |
Apprv. by Struct/Architectural  |
2/15/2019  |
  |
  |
2/26/2019 10:19:39 AM  |
APPR  |
CSG  |
Route to Struct/Architectual  |
2/15/2019  |
3/6/2019  |
  |
2/26/2019  |
APPR  |
CSG  |
BLD - Framing Insp.  |
2/19/2019 1:57:59 PM  |
2/20/2019  |
8 AM - 12 PM  |
2/20/2019  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
2/19/2019 1:58:07 PM  |
2/20/2019  |
8 AM - 12 PM  |
2/20/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
2/19/2019 1:58:17 PM  |
2/20/2019  |
8 AM - 12 PM  |
2/20/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
2/20/2019 1:01:12 PM  |
2/21/2019  |
8 AM - 12 PM  |
2/21/2019  |
P  |
PJJ  |
BLD - Exterior Lath Insp  |
2/20/2019 1:01:20 PM  |
2/21/2019  |
8 AM - 12 PM  |
2/21/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
2/20/2019 1:02:03 PM  |
2/21/2019  |
8 AM - 12 PM  |
2/21/2019  |
P  |
PJJ  |
BLD - Framing Insp.  |
2/21/2019 10:49:28 AM  |
2/22/2019  |
8 AM - 12 PM  |
2/22/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
2/21/2019 10:49:35 AM  |
2/22/2019  |
8 AM - 12 PM  |
2/22/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/21/2019 10:49:53 AM  |
2/22/2019  |
8 AM - 12 PM  |
2/22/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/24/2019 8:00:19 AM  |
2/25/2019  |
10 AM - 2 PM  |
2/25/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
2/24/2019 12:09:08 PM  |
2/25/2019  |
10 AM - 2 PM  |
2/25/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
2/24/2019 12:09:25 PM  |
2/25/2019  |
10 AM - 2 PM  |
2/25/2019  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
2/24/2019 12:10:20 PM  |
2/25/2019  |
10 AM - 2 PM  |
2/25/2019  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
2/25/2019 1:47:40 PM  |
2/26/2019  |
8 AM - 12 PM  |
2/26/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
2/25/2019 1:48:39 PM  |
2/26/2019  |
8 AM - 12 PM  |
2/26/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
2/25/2019 1:48:54 PM  |
2/26/2019  |
8 AM - 12 PM  |
2/26/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/25/2019 1:49:05 PM  |
2/26/2019  |
8 AM - 12 PM  |
2/26/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
2/26/2019 12:14:33 PM  |
2/27/2019  |
8 AM - 12 PM  |
2/27/2019  |
C  |
BEN  |
BLD - Insulation Insp  |
2/26/2019 12:14:43 PM  |
2/27/2019  |
8 AM - 12 PM  |
2/27/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
2/26/2019 12:14:56 PM  |
2/27/2019  |
8 AM - 12 PM  |
2/27/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/26/2019 12:15:08 PM  |
2/27/2019  |
8 AM - 12 PM  |
2/27/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/26/2019 12:15:20 PM  |
2/27/2019  |
8 AM - 12 PM  |
2/27/2019  |
C  |
BEN  |
Inspection by Fire Department  |
2/27/2019  |
3/15/2019  |
  |
5/3/2019  |
DONE  |
A836  |
BLD - Framing Insp.  |
2/27/2019 11:53:36 AM  |
2/28/2019  |
8 AM - 12 PM  |
2/28/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
2/27/2019 11:53:47 AM  |
2/28/2019  |
8 AM - 12 PM  |
2/28/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/27/2019 11:53:53 AM  |
2/28/2019  |
8 AM - 12 PM  |
2/28/2019  |
N  |
BEN  |
ELE - Rough Electrical  |
2/27/2019 11:54:03 AM  |
2/28/2019  |
8 AM - 12 PM  |
2/28/2019  |
C  |
BEN  |
Route to Planning Zoning  |
2/27/2019  |
3/15/2019  |
  |
3/1/2019  |
APPR  |
EYT  |
Approved by Planning Zoning  |
2/27/2019  |
  |
  |
3/1/2019 8:42:03 AM  |
APPR  |
EYT  |
Route to Struct/Architectual  |
2/27/2019  |
3/15/2019  |
  |
3/4/2019  |
APPR  |
CSG  |
Apprv. by Struct/Architectural  |
2/27/2019  |
  |
  |
3/4/2019  |
DONE  |
CSG  |
BLD - Framing Insp.  |
2/28/2019 8:02:51 AM  |
3/1/2019  |
8 AM - 12 PM  |
3/1/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
2/28/2019 8:03:02 AM  |
3/1/2019  |
8 AM - 12 PM  |
3/1/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
2/28/2019 8:03:08 AM  |
3/1/2019  |
8 AM - 12 PM  |
3/1/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
2/28/2019 8:03:15 AM  |
3/1/2019  |
8 AM - 12 PM  |
3/1/2019  |
C  |
BEN  |
Route to Struct/Architectual  |
2/28/2019  |
3/18/2019  |
  |
3/7/2019  |
APPR  |
CSG  |
Apprv. by Struct/Architectural  |
2/28/2019  |
  |
  |
3/4/2019 11:40:44 AM  |
APPR  |
CSG  |
BLD - Framing Insp.  |
3/1/2019 11:07:39 AM  |
3/4/2019  |
8 AM - 12 PM  |
3/4/2019  |
P  |
PJJ  |
BLD - Insulation Insp  |
3/1/2019 11:07:58 AM  |
3/4/2019  |
8 AM - 12 PM  |
3/4/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
3/1/2019 11:08:06 AM  |
3/4/2019  |
8 AM - 12 PM  |
3/4/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
3/4/2019 10:28:08 AM  |
3/5/2019  |
8 AM - 12 PM  |
3/5/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
3/4/2019 10:28:13 AM  |
3/5/2019  |
8 AM - 12 PM  |
3/5/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/4/2019 10:28:23 AM  |
3/5/2019  |
8 AM - 12 PM  |
3/5/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/5/2019 12:17:15 PM  |
3/6/2019  |
12 PM - 3 PM  |
3/6/2019  |
C  |
BEN  |
BLD - Insulation Insp  |
3/5/2019 12:17:36 PM  |
3/6/2019  |
12 PM - 3 PM  |
3/6/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/5/2019 12:17:43 PM  |
3/6/2019  |
12 PM - 3 PM  |
3/6/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/6/2019 9:45:19 AM  |
3/7/2019  |
8 AM - 12 PM  |
3/7/2019  |
C  |
BEN  |
BLD - Insulation Insp  |
3/6/2019 9:45:25 AM  |
3/7/2019  |
8 AM - 12 PM  |
3/7/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/6/2019 9:45:32 AM  |
3/7/2019  |
8 AM - 12 PM  |
3/7/2019  |
C  |
BEN  |
Apprv. by Struct/Architectural  |
3/6/2019  |
  |
  |
3/7/2019 2:05:48 PM  |
APPR  |
CSG  |
Route to Struct/Architectual  |
3/6/2019  |
3/13/2019  |
  |
3/21/2019  |
APPR  |
CSG  |
Approved by Fire Department  |
3/6/2019  |
  |
  |
3/22/2019 2:26:07 PM  |
NR  |
472  |
Route to Fire Department  |
3/6/2019  |
3/22/2019  |
  |
3/22/2019  |
NR  |
472  |
BLD - Framing Insp.  |
3/7/2019 1:22:49 PM  |
3/8/2019  |
  |
3/8/2019  |
C  |
BEN  |
BLD - Insulation Insp  |
3/7/2019 1:23:00 PM  |
3/8/2019  |
  |
3/8/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/7/2019 1:23:10 PM  |
3/8/2019  |
  |
3/8/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/8/2019 10:06:32 AM  |
3/11/2019  |
8 AM - 12 PM  |
3/11/2019  |
P  |
PJJ  |
BLD - Insulation Insp  |
3/8/2019 10:06:44 AM  |
3/11/2019  |
8 AM - 12 PM  |
3/11/2019  |
P  |
PJJ  |
ELE - Rough Electrical  |
3/8/2019 10:06:57 AM  |
3/11/2019  |
8 AM - 12 PM  |
3/11/2019  |
P  |
PJJ  |
BLD - Framing Insp.  |
3/11/2019 8:41:25 AM  |
3/12/2019  |
8 AM - 12 PM  |
3/12/2019  |
C  |
BEN  |
BLD - Insulation Insp  |
3/11/2019 8:41:33 AM  |
3/12/2019  |
8 AM - 12 PM  |
3/12/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/11/2019 8:41:41 AM  |
3/12/2019  |
8 AM - 12 PM  |
3/12/2019  |
C  |
BEN  |
MEC - Rough Mechanical  |
3/11/2019 10:38:44 AM  |
3/12/2019  |
8 AM - 12 PM  |
3/12/2019  |
C  |
BEN  |
MEC - Rough Duct  |
3/11/2019 10:38:54 AM  |
3/12/2019  |
8 AM - 12 PM  |
3/12/2019  |
P  |
BEN  |
PLM - Ground/Underfloor waste  |
3/11/2019 10:39:03 AM  |
3/12/2019  |
8 AM - 12 PM  |
3/12/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/12/2019 2:06:37 PM  |
3/13/2019  |
8 AM - 12 PM  |
3/13/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
3/12/2019 2:06:49 PM  |
3/13/2019  |
8 AM - 12 PM  |
3/13/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/12/2019 2:07:26 PM  |
3/13/2019  |
8 AM - 12 PM  |
3/13/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/13/2019 1:10:11 PM  |
3/14/2019  |
8 AM - 12 PM  |
3/14/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
3/13/2019 1:10:19 PM  |
3/14/2019  |
8 AM - 12 PM  |
3/14/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/13/2019 1:12:29 PM  |
3/14/2019  |
8 AM - 12 PM  |
3/14/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/15/2019 6:44:43 AM  |
3/18/2019  |
10 AM - 2 PM  |
3/18/2019  |
C  |
PJJ  |
BLD - Exterior Lath Insp  |
3/15/2019 6:44:49 AM  |
3/18/2019  |
10 AM - 2 PM  |
3/18/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
3/15/2019 6:46:53 AM  |
3/18/2019  |
10 AM - 2 PM  |
3/18/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
3/18/2019 1:19:43 PM  |
3/19/2019  |
12 PM - 3 PM  |
3/19/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
3/18/2019 1:19:50 PM  |
3/19/2019  |
12 PM - 3 PM  |
3/19/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/18/2019 1:20:03 PM  |
3/19/2019  |
12 PM - 3 PM  |
3/19/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/19/2019 8:50:12 AM  |
3/20/2019  |
12 PM - 3 PM  |
3/20/2019  |
N  |
BEN  |
BLD - Pre-Slab Insp  |
3/19/2019 1:59:16 PM  |
3/20/2019  |
12 PM - 3 PM  |
3/20/2019  |
A  |
BEN  |
BLD - Drywall Inspection  |
3/19/2019 1:59:25 PM  |
3/20/2019  |
12 PM - 3 PM  |
3/20/2019  |
N  |
BEN  |
BLD - Insulation Insp  |
3/19/2019 1:59:32 PM  |
3/20/2019  |
12 PM - 3 PM  |
3/20/2019  |
A  |
BEN  |
BLD - Framing Insp.  |
3/19/2019 1:59:39 PM  |
3/20/2019  |
12 PM - 3 PM  |
3/20/2019  |
N  |
BEN  |
BLD - T-Bar (Structural) Insp  |
3/19/2019 1:59:47 PM  |
3/20/2019  |
12 PM - 3 PM  |
3/20/2019  |
N  |
BEN  |
ELE - T-Bar Electrical  |
3/19/2019 1:59:56 PM  |
3/20/2019  |
12 PM - 3 PM  |
3/20/2019  |
N  |
BEN  |
PLM - Rough/Topout  |
3/19/2019 2:00:04 PM  |
3/20/2019  |
12 PM - 3 PM  |
3/20/2019  |
N  |
BEN  |
MEC - Rough Mechanical  |
3/19/2019 2:00:15 PM  |
3/20/2019  |
12 PM - 3 PM  |
3/20/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
3/20/2019 12:03:36 PM  |
3/21/2019  |
12 PM - 3 PM  |
3/21/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/20/2019 12:03:45 PM  |
3/21/2019  |
12 PM - 3 PM  |
3/21/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/20/2019 12:04:20 PM  |
3/21/2019  |
12 PM - 3 PM  |
3/21/2019  |
C  |
BEN  |
PLM - Rough/Topout  |
3/20/2019 12:04:30 PM  |
3/21/2019  |
12 PM - 3 PM  |
3/21/2019  |
C  |
BEN  |
MEC - Rough Mechanical  |
3/20/2019 12:04:40 PM  |
3/21/2019  |
12 PM - 3 PM  |
3/21/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/21/2019 2:30:52 PM  |
3/22/2019  |
12 PM - 3 PM  |
3/22/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/21/2019 2:31:14 PM  |
3/22/2019  |
12 PM - 3 PM  |
3/22/2019  |
P  |
BEN  |
ELE - Rough Electrical  |
3/21/2019 2:31:46 PM  |
3/22/2019  |
12 PM - 3 PM  |
3/22/2019  |
C  |
BEN  |
PLM - Rough/Topout  |
3/21/2019 2:31:53 PM  |
3/22/2019  |
12 PM - 3 PM  |
3/22/2019  |
C  |
BEN  |
MEC - Rough Mechanical  |
3/21/2019 2:32:00 PM  |
3/22/2019  |
12 PM - 3 PM  |
3/22/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
3/22/2019 12:42:37 PM  |
3/25/2019  |
8 AM - 12 PM  |
3/25/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
3/22/2019 12:42:52 PM  |
3/25/2019  |
8 AM - 12 PM  |
3/25/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
3/22/2019 12:43:17 PM  |
3/25/2019  |
8 AM - 12 PM  |
3/25/2019  |
C  |
PJJ  |
PLM - Rough/Topout  |
3/22/2019 12:43:25 PM  |
3/25/2019  |
8 AM - 12 PM  |
3/25/2019  |
C  |
PJJ  |
MEC - Rough Mechanical  |
3/22/2019 12:43:45 PM  |
3/25/2019  |
8 AM - 12 PM  |
3/25/2019  |
C  |
PJJ  |
Approved by Planning Zoning  |
3/6/2019  |
  |
  |
3/22/2019 2:40:26 PM  |
APPR  |
EYT  |
Route to Planning Zoning  |
3/6/2019  |
3/22/2019  |
  |
3/22/2019  |
APPR  |
EYT  |
BLD - Drywall Inspection  |
3/25/2019 10:02:24 AM  |
3/26/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
3/25/2019 10:02:42 AM  |
3/26/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
PLM - Rough/Topout  |
3/25/2019 10:03:00 AM  |
3/26/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
MEC - Rough Mechanical  |
3/25/2019 10:03:06 AM  |
3/26/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/25/2019 10:03:14 AM  |
3/26/2019  |
8 AM - 12 PM  |
3/27/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
3/26/2019 2:37:24 PM  |
3/27/2019  |
8 AM - 12 PM  |
3/27/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
3/26/2019 2:37:30 PM  |
3/27/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
3/26/2019 2:37:59 PM  |
3/27/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/26/2019 2:38:09 PM  |
3/27/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
PLM - Rough/Topout  |
3/26/2019 2:38:16 PM  |
3/27/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
MEC - Rough Mechanical  |
3/26/2019 2:38:23 PM  |
3/27/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
MEC - Rough Duct  |
3/26/2019 2:38:37 PM  |
3/27/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
ELE - T-Bar Electrical  |
3/26/2019 2:38:56 PM  |
3/27/2019  |
8 AM - 12 PM  |
3/27/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
3/27/2019 12:49:16 PM  |
3/28/2019  |
10 AM - 2 PM  |
3/28/2019  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
3/27/2019 12:49:42 PM  |
3/28/2019  |
10 AM - 2 PM  |
3/28/2019  |
C  |
PJJ  |
ELE - T-Bar Electrical  |
3/27/2019 12:49:49 PM  |
3/28/2019  |
10 AM - 2 PM  |
3/28/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
3/27/2019 12:50:00 PM  |
3/28/2019  |
10 AM - 2 PM  |
3/28/2019  |
C  |
PJJ  |
PLM - Rough/Topout  |
3/27/2019 12:50:09 PM  |
3/28/2019  |
10 AM - 2 PM  |
3/28/2019  |
C  |
PJJ  |
MEC - Rough Mechanical  |
3/27/2019 12:50:21 PM  |
3/28/2019  |
10 AM - 2 PM  |
3/28/2019  |
C  |
PJJ  |
MEC - Rough Duct  |
3/27/2019 12:50:29 PM  |
3/28/2019  |
10 AM - 2 PM  |
3/28/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
3/28/2019 11:31:11 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
3/28/2019 11:31:25 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
C  |
BEN  |
ELE - T-Bar Electrical  |
3/28/2019 11:31:33 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
3/28/2019 11:31:42 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
C  |
BEN  |
PLM - Rough/Topout  |
3/28/2019 11:31:49 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
C  |
BEN  |
MEC - Rough Duct  |
3/28/2019 11:32:21 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
A  |
BEN  |
MEC - Rough Mechanical  |
3/28/2019 11:32:28 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
A  |
BEN  |
BLD - Exterior Lath Insp  |
3/28/2019 11:32:37 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
A  |
BEN  |
BLD - Interior Lath  |
3/28/2019 11:33:11 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
A  |
BEN  |
BLD - Drywall Inspection  |
3/28/2019 11:33:16 AM  |
3/29/2019  |
8 AM - 12 PM  |
3/29/2019  |
A  |
BEN  |
BLD - Framing Insp.  |
3/29/2019 12:54:22 PM  |
4/1/2019  |
8 AM - 12 PM  |
4/1/2019  |
P  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
3/29/2019 12:54:29 PM  |
4/1/2019  |
8 AM - 12 PM  |
4/1/2019  |
C  |
PJJ  |
ELE - T-Bar Electrical  |
3/29/2019 12:54:38 PM  |
4/1/2019  |
8 AM - 12 PM  |
4/1/2019  |
C  |
PJJ  |
ELE - Rough Electrical  |
3/29/2019 12:54:51 PM  |
4/1/2019  |
8 AM - 12 PM  |
4/1/2019  |
A  |
PJJ  |
PLM - Rough/Topout  |
3/29/2019 12:56:03 PM  |
4/1/2019  |
8 AM - 12 PM  |
4/1/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
4/1/2019 11:27:02 AM  |
4/2/2019  |
10 AM - 2 PM  |
4/2/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
4/1/2019 11:27:09 AM  |
4/2/2019  |
10 AM - 2 PM  |
4/2/2019  |
C  |
BEN  |
PLM - Rough/Topout  |
4/1/2019 11:27:19 AM  |
4/2/2019  |
10 AM - 2 PM  |
4/2/2019  |
C  |
BEN  |
ELE - Rough Electrical  |
4/1/2019 11:27:29 AM  |
4/2/2019  |
10 AM - 2 PM  |
4/2/2019  |
C  |
BEN  |
MEC - Rough Mechanical  |
4/1/2019 11:27:38 AM  |
4/2/2019  |
10 AM - 2 PM  |
4/2/2019  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
4/2/2019 11:26:55 AM  |
4/3/2019  |
8 AM - 12 PM  |
4/3/2019  |
C  |
BEN  |
ELE - T-Bar Electrical  |
4/2/2019 11:27:04 AM  |
4/3/2019  |
8 AM - 12 PM  |
4/3/2019  |
C  |
BEN  |
PLM - Rough/Topout  |
4/2/2019 11:27:13 AM  |
4/3/2019  |
8 AM - 12 PM  |
4/3/2019  |
A  |
BEN  |
BLD - Framing Insp.  |
4/2/2019 11:27:19 AM  |
4/3/2019  |
8 AM - 12 PM  |
4/3/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
4/3/2019 10:56:33 AM  |
4/4/2019  |
8 AM - 12 PM  |
4/4/2019  |
N  |
BEN  |
BLD - T-Bar (Structural) Insp  |
4/3/2019 10:56:39 AM  |
4/4/2019  |
8 AM - 12 PM  |
4/4/2019  |
N  |
BEN  |
ELE - T-Bar Electrical  |
4/3/2019 10:56:47 AM  |
4/4/2019  |
8 AM - 12 PM  |
4/4/2019  |
N  |
BEN  |
PLM - Rough/Topout  |
4/3/2019 10:57:00 AM  |
4/4/2019  |
8 AM - 12 PM  |
4/4/2019  |
N  |
BEN  |
ELE - Rough Electrical  |
4/4/2019  |
4/6/2019  |
  |
4/8/2019  |
A  |
PJJ  |
BLD - Framing Insp.  |
4/4/2019 1:51:25 PM  |
4/5/2019  |
8 AM - 12 PM  |
4/5/2019  |
P  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
4/4/2019 1:51:45 PM  |
4/5/2019  |
8 AM - 12 PM  |
4/5/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
4/5/2019 9:39:12 AM  |
4/8/2019  |
8 AM - 12 PM  |
4/8/2019  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
4/5/2019 9:39:20 AM  |
4/8/2019  |
8 AM - 12 PM  |
4/8/2019  |
C  |
PJJ  |
ELE - T-Bar Electrical  |
4/5/2019 9:39:28 AM  |
4/8/2019  |
8 AM - 12 PM  |
4/8/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
4/8/2019 11:51:05 AM  |
4/9/2019  |
8 AM - 12 PM  |
4/9/2019  |
P  |
PJJ  |
BLD - Drywall Inspection  |
4/8/2019 11:52:55 AM  |
4/9/2019  |
8 AM - 12 PM  |
4/9/2019  |
A  |
PJJ  |
ELE - Rough Electrical  |
4/22/2019 9:56:42 AM  |
4/23/2019  |
12 PM - 3 PM  |
4/23/2019  |
N  |
BEN  |
Approved Alternate MatL/Method  |
4/23/2019  |
  |
  |
5/1/2019  |
DONE  |
AJP2  |
Approved Alternate MatL/Method  |
4/23/2019  |
  |
  |
5/1/2019  |
DONE  |
AJP2  |
Route To Alternate MatL/Method  |
4/23/2019  |
5/9/2019  |
  |
5/1/2019  |
APPR  |
AJP2  |
Route To Alternate MatL/Method  |
4/23/2019  |
5/9/2019  |
  |
5/1/2019  |
APPR  |
AJP2  |
Plumbing Final Insp Request  |
4/24/2019 4:38:29 PM  |
4/25/2019  |
12 PM - 3 PM  |
4/25/2019  |
N  |
BEN  |
Electrical Final Insp Request  |
4/24/2019 4:38:43 PM  |
4/25/2019  |
12 PM - 3 PM  |
4/25/2019  |
N  |
BEN  |
Mechanical Final Insp Request  |
4/24/2019 4:38:53 PM  |
4/25/2019  |
12 PM - 3 PM  |
4/25/2019  |
N  |
BEN  |
Electrical Final Insp Request  |
4/25/2019  |
4/26/2019  |
12 PM - 3 PM  |
4/26/2019  |
A  |
BEN  |
Mechanical Final Insp Request  |
4/25/2019  |
4/26/2019  |
12 PM - 3 PM  |
4/26/2019  |
A  |
BEN  |
Plumbing Final Insp Request  |
4/25/2019  |
4/26/2019  |
12 PM - 3 PM  |
4/26/2019  |
A  |
BEN  |
BLD - Framing Insp.  |
4/25/2019 7:11:55 PM  |
4/26/2019  |
12 PM - 3 PM  |
4/26/2019  |
A  |
BEN  |
Approved Alternate MatL/Method  |
4/26/2019  |
  |
  |
4/26/2019  |
A  |
TBA  |
Route To Alternate MatL/Method  |
4/26/2019  |
5/14/2019  |
  |
4/26/2019  |
APPR  |
TBA  |
Approved Alternate MatL/Method  |
4/26/2019  |
  |
  |
4/26/2019  |
A  |
TBA  |
Route To Alternate MatL/Method  |
4/26/2019  |
5/14/2019  |
  |
4/26/2019  |
APPR  |
TBA  |
BLD - TCO App Consideration  |
4/26/2019  |
4/26/2019  |
  |
4/26/2019  |
A  |
BEN  |
Plumbing Final  |
  |
  |
  |
4/26/2019  |
  |
BEN  |
Electrical Final  |
  |
  |
  |
4/26/2019  |
  |
BEN  |
Mechanical Final  |
  |
  |
  |
4/26/2019  |
  |
BEN  |
BLD - Framing Insp.  |
5/2/2019 4:38:38 PM  |
5/3/2019  |
  |
5/3/2019  |
C  |
BEN  |
Building Final Insp Request  |
5/6/2019 8:05:20 AM  |
5/7/2019  |
8 AM - 12 PM  |
5/7/2019  |
A  |
PJJ  |
Building Final  |
  |
  |
  |
5/7/2019  |
  |
PJJ  |
Planning GIS - Building Change  |
5/7/2019 1:41:34 PM  |
  |
  |
6/7/2019  |
DONE  |
HXN  |