Permit Number:  BLD2017-01420     Status:   Finaled     Map Info:   1313 S HARBOR BLVD
Name:  WALT DISNEY WORLD CO
Address: 1313 S HARBOR
Received Date: 04/06/2017 
Parcel: 08219019 
Plan Check Date:  
Issue Date: 04/26/2019 
Expiration Date: 05/17/2019 
Finaled Date: 05/07/2019 
Description: Disneyland - SW - DL Frontierland Expansion - BLDG 10020/Attraction #3 - New Commercial Construction: 25,416 s.ft 1 story retail building with restrooms. Arch structure 540 s.ft. (5) canopies total 848 s.ft. (15) attached awnings. Rock work on building. Overhead conveyor droid prop anchored to interior. (3) Exterior prefabricated themed apartment show ornamentation (faux) anchored to facilty. 

Activities
Type  Requested  Scheduled  Time of Inspection  Completed  Disposition  Employee 
Approved by Bus Lic (Sub List)  4/6/2017  3/28/2019    4/4/2019  APPR  RHZ 
Approved by Addressing  4/6/2017      4/7/2017 7:25:19 AM  APPR  HXN 
Route to Addressing  4/6/2017  4/24/2017    4/7/2017 7:25:19 AM  APPR  HXN 
Approved by Electrical  4/6/2017      4/21/2017 11:02:24 AM  APPR  MCS 
Route to Electrical  4/6/2017  4/24/2017    4/21/2017  APPR  MCS 
Approved by Elec Engineering  4/6/2017      4/18/2017 10:56:11 AM  APPR  JJB 
Route to Elec Engineering  4/6/2017  4/24/2017    4/18/2017  APPR  JJB 
Approved by Fire Department  4/6/2017      5/17/2017  APPR  408 
Route to Fire Department  4/6/2017  4/24/2017    4/26/2017  CORR  408 
Approved by Mechanical  4/6/2017      4/24/2017  NR  GAQ 
Route to Mechanical  4/6/2017  4/24/2017    4/24/2017  NR  GAQ 
Approved by Planning Zoning  4/6/2017      4/26/2017 3:36:11 PM  APPR  EYT 
Route to Planning Zoning  4/6/2017  4/24/2017    4/26/2017  APPR  EYT 
Approved by Plumbing  4/6/2017      4/24/2017  APPR  GAQ 
Route to Plumbing  4/6/2017  4/24/2017    4/24/2017  APPR  GAQ 
Apprv. by PW Develop. Services  4/6/2017      5/9/2017 5:33:54 PM  APPR  SXA 
Route to PW Develop. Services  4/6/2017  4/24/2017    5/9/2017  APPR  SXA 
Approved: School Fees Due  4/6/2017      7/10/2017  APPR  CMN 
Apprv. by Struct/Architectural  4/6/2017      5/17/2017 3:17:45 PM  APPR  CSG 
Route to Struct/Architectual  4/6/2017  4/24/2017    4/24/2017  CORR  CSG 
Approved by Traffic Eng.  4/6/2017      4/24/2017 3:05:51 PM  APPR  RXC 
Route to Traffic Engineering  4/6/2017  4/24/2017    4/24/2017  APPR  RXC 
Route to Water Engineering  4/6/2017  4/24/2017    4/17/2017  APPR  DRS 
Approved by Water Engineering  4/6/2017      4/17/2017 9:36:53 AM  APPR  DRS 
FIRE - Create BFP case  4/26/2017      4/26/2017  DONE  408 
Route to Fire Department  5/17/2017  6/5/2017    5/17/2017  APPR  408 
Route to Struct/Architectual  5/17/2017  6/5/2017    5/17/2017  APPR  CSG 
Route to Electrical  6/6/2017  6/22/2017    6/16/2017  APPR  MCS 
Approved by Electrical  6/6/2017      6/16/2017 10:36:28 AM  APPR  MCS 
Approved by Elec Engineering  6/6/2017      6/16/2017 2:04:44 PM  APPR  JJB 
Route to Elec Engineering  6/6/2017  6/22/2017    6/16/2017  APPR  JJB 
Approved by Fire Department  6/6/2017      6/21/2017 3:25:45 PM  APPR  408 
Route to Fire Department  6/6/2017  6/22/2017    6/21/2017  APPR  408 
Route to Mechanical  6/6/2017  6/22/2017    6/22/2017  APPR  GAQ 
Approved by Mechanical  6/6/2017      6/22/2017 3:39:02 PM  APPR  GAQ 
Approved by Planning Zoning  6/6/2017      6/28/2017 8:51:43 AM  APPR  EYT 
Route to Planning Zoning  6/6/2017  6/22/2017    6/28/2017  APPR  EYT 
Approved by Plumbing  6/6/2017      6/22/2017 3:39:17 PM  APPR  GAQ 
Route to Plumbing  6/6/2017  6/22/2017    6/22/2017  APPR  GAQ 
Apprv. by PW Develop. Services  6/6/2017      6/21/2017 1:23:58 PM  APPR  SXA 
Route to PW Develop. Services  6/6/2017  6/22/2017    6/21/2017  APPR  SXA 
Apprv. by Struct/Architectural  6/6/2017      7/25/2017 3:15:04 PM  APPR  CSG 
Route to Struct/Architectual  6/6/2017  6/22/2017    6/16/2017  CORR  CSG 
Approved by Traffic Eng.  6/6/2017      6/22/2017 1:45:56 PM  APPR  RXC 
Route to Traffic Engineering  6/6/2017  6/22/2017    6/22/2017  APPR  RXC 
Route to Water Engineering  6/6/2017  6/22/2017    6/22/2017  APPR  DRS 
Approved by Water Engineering  6/6/2017      6/22/2017 6:02:59 PM  APPR  DRS 
ELE - Underground conduit  6/21/2017  6/22/2017    6/22/2017  BEN 
ELE - Underground conduit  6/23/2017 11:46:56 AM  6/26/2017    6/26/2017  GCT 
ELE - Underground conduit  7/11/2017 3:52:39 PM  7/12/2017  12 PM - 3 PM  7/12/2017  GCT 
ELE - Underground conduit  7/12/2017 2:43:43 PM  7/13/2017  12 PM - 3 PM  7/13/2017  GCT 
BLD - Footings Insp  7/16/2017 11:12:14 AM  7/17/2017  8 AM - 12 PM  7/17/2017  GCT 
BLD - Footings Insp  7/20/2017 3:37:12 PM  7/21/2017  8 AM - 12 PM  7/21/2017  JOS 
Route To Alternate MatL/Method        7/21/2017  APPR  CSG 
Approved Alternate MatL/Method  7/21/2017      7/21/2017  DONE  CSG 
Route to Fire Department  7/21/2017  7/28/2017    7/28/2017  NR  408 
BLD - Footings Insp  7/22/2017 11:52:47 AM  7/24/2017  10 AM - 2 PM  7/24/2017  GCT 
Route to Struct/Architectual  7/21/2017  8/8/2017    7/25/2017  APPR  CSG 
BLD - Footings Insp  7/24/2017 2:54:19 PM  7/25/2017  8 AM - 12 PM  7/25/2017  GCT 
BLD - Footings Insp  7/31/2017 2:43:55 PM  8/1/2017  8 AM - 12 PM  8/1/2017  BEN 
BLD - Footings Insp  8/3/2017 2:57:46 PM  8/4/2017  12 PM - 3 PM  8/4/2017  BEN 
BLD - Footings Insp  8/4/2017 3:10:04 PM  8/7/2017  10 AM - 2 PM  8/7/2017  GCT 
BLD - Reinforcing Insp  8/4/2017 3:10:14 PM  8/7/2017  10 AM - 2 PM  8/7/2017  GCT 
BLD - Reinforcing Insp  8/7/2017 4:09:49 PM  8/8/2017  8 AM - 12 PM  8/8/2017  BEN 
BLD - Footings Insp  8/7/2017 4:09:57 PM  8/8/2017  8 AM - 12 PM  8/8/2017  BEN 
BLD - Footings Insp  8/8/2017 3:02:35 PM  8/9/2017  8 AM - 12 PM  8/9/2017  BEN 
BLD - Reinforcing Insp  8/8/2017 3:02:44 PM  8/9/2017  8 AM - 12 PM  8/9/2017  BEN 
BLD - Footings Insp  8/9/2017 5:16:08 PM  8/10/2017  10 AM - 2 PM  8/10/2017  BEN 
BLD - Reinforcing Insp  8/9/2017 5:16:21 PM  8/10/2017  10 AM - 2 PM  8/10/2017  BEN 
BLD - Reinforcing Insp  8/10/2017 3:49:16 PM  8/11/2017  10 AM - 2 PM  8/11/2017  BEN 
BLD - Footings Insp  8/10/2017 3:49:32 PM  8/11/2017  10 AM - 2 PM  8/11/2017  BEN 
BLD - Footings Insp  8/13/2017 2:22:01 PM  8/14/2017    8/14/2017  GCT 
BLD - Reinforcing Insp  8/13/2017 2:22:29 PM  8/14/2017    8/14/2017  GCT 
ELE - Underground conduit  8/13/2017 2:22:55 PM  8/14/2017    8/14/2017  GCT 
BLD - Footings Insp  8/14/2017 3:16:21 PM  8/15/2017  8 AM - 12 PM  8/15/2017  BEN 
BLD - Reinforcing Insp  8/14/2017 3:17:07 PM  8/15/2017  8 AM - 12 PM  8/15/2017  BEN 
BLD - Footings Insp  8/15/2017 2:50:00 PM  8/16/2017  12 PM - 3 PM  8/16/2017  BEN 
BLD - Reinforcing Insp  8/15/2017 2:50:10 PM  8/16/2017  12 PM - 3 PM  8/16/2017  BEN 
BLD - Footings Insp  8/16/2017 3:40:47 PM  8/17/2017  8 AM - 12 PM  8/17/2017  BEN 
BLD - Reinforcing Insp  8/16/2017 3:40:54 PM  8/17/2017  8 AM - 12 PM  8/17/2017  BEN 
BLD - Footings Insp  8/17/2017 2:36:22 PM  8/18/2017  8 AM - 12 PM  8/18/2017  BEN 
BLD - Reinforcing Insp  8/17/2017 2:36:30 PM  8/18/2017  8 AM - 12 PM  8/18/2017  BEN 
BLD - Footings Insp  8/18/2017 2:39:46 PM  8/21/2017  10 AM - 2 PM  8/21/2017  GCT 
BLD - Reinforcing Insp  8/18/2017 2:39:56 PM  8/21/2017  10 AM - 2 PM  8/21/2017  GCT 
ELE - Underground conduit  8/20/2017 6:01:12 PM  8/21/2017  10 AM - 2 PM  8/21/2017  GCT 
BLD - Reinforcing Insp  8/21/2017 3:17:28 PM  8/22/2017  12 PM - 3 PM  8/22/2017  BEN 
BLD - Footings Insp  8/21/2017 3:17:36 PM  8/22/2017  12 PM - 3 PM  8/22/2017  BEN 
ELE - Underground conduit  8/21/2017 3:18:05 PM  8/22/2017  12 PM - 3 PM  8/22/2017  BEN 
PLM - Ground/Underfloor waste  8/21/2017 3:18:41 PM  8/22/2017  12 PM - 3 PM  8/22/2017  BEN 
PLM - Sewer  8/21/2017 3:20:08 PM  8/22/2017  12 PM - 3 PM  8/22/2017  BEN 
BLD - Reinforcing Insp  8/22/2017 2:58:23 PM  8/23/2017  8 AM - 12 PM  8/23/2017  BEN 
BLD - Footings Insp  8/22/2017 2:58:30 PM  8/23/2017  8 AM - 12 PM  8/23/2017  BEN 
BLD - Reinforcing Insp  8/23/2017 2:56:56 PM  8/24/2017  12 PM - 3 PM  8/24/2017  BEN 
BLD - Footings Insp  8/23/2017 2:57:27 PM  8/24/2017  12 PM - 3 PM  8/24/2017  BEN 
BLD - Reinforcing Insp  9/6/2017 3:23:07 PM  9/7/2017  8 AM - 12 PM  9/7/2017  BEN 
BLD - Reinforcing Insp  9/7/2017 3:31:50 PM  9/8/2017  8 AM - 12 PM  9/8/2017  BEN 
PLM - Ground/Underfloor waste  9/7/2017 3:32:15 PM  9/8/2017  8 AM - 12 PM  9/8/2017  BEN 
PLM - Sewer  9/7/2017 3:32:35 PM  9/8/2017  8 AM - 12 PM  9/8/2017  BEN 
ELE - Underground conduit  9/11/2017 2:05:16 PM  9/12/2017  8 AM - 12 PM  9/12/2017  BEN 
PLM - Ground/Underfloor waste  9/12/2017 2:30:00 PM  9/13/2017  10 AM - 2 PM  9/13/2017  BEN 
MEC - Rough Mechanical  9/13/2017 3:03:19 PM  9/14/2017  12 PM - 3 PM  9/14/2017  BEN 
MEC - Underground Rough  9/15/2017 2:42:20 PM  9/18/2017  12 PM - 3 PM  9/18/2017  GCT 
PLM - Ground/Underfloor waste  9/15/2017 2:42:32 PM  9/18/2017  12 PM - 3 PM  9/18/2017  GCT 
BLD - Reinforcing Insp  9/17/2017 4:10:34 PM  9/18/2017  12 PM - 3 PM  9/18/2017  GCT 
BLD - Pre-Slab Insp  9/17/2017 4:10:52 PM  9/18/2017  12 PM - 3 PM  9/18/2017  GCT 
ELE - Underground conduit  9/17/2017 4:11:13 PM  9/18/2017  12 PM - 3 PM  9/18/2017  GCT 
MEC - Rough Duct  9/17/2017 4:11:52 PM  9/18/2017  12 PM - 3 PM  9/18/2017  GCT 
ELE - Underground conduit  9/19/2017 2:57:00 PM  9/20/2017    9/20/2017  BEN 
MEC - Underground Rough  9/19/2017 2:57:44 PM  9/20/2017    9/20/2017  BEN 
PLM - Gas Test  9/19/2017 2:57:58 PM  9/20/2017    9/20/2017  BEN 
PLM - Ground/Underfloor water  9/19/2017 2:58:10 PM  9/20/2017    9/20/2017  BEN 
PLM - Sewer  9/19/2017 2:58:21 PM  9/20/2017    9/20/2017  BEN 
BLD - Pre-Slab Insp  9/20/2017 3:24:08 PM  9/21/2017  8 AM - 12 PM  9/21/2017  BEN 
PLM - Ground/Underfloor waste  9/20/2017 3:24:26 PM  9/21/2017  8 AM - 12 PM  9/21/2017  BEN 
PLM - Ground/Underfloor water  9/20/2017 3:24:49 PM  9/21/2017  8 AM - 12 PM  9/21/2017  BEN 
ELE - Underground conduit  9/25/2017 2:46:43 PM  9/26/2017  10 AM - 2 PM  9/26/2017  BEN 
ELE - Underground conduit  9/26/2017 2:27:02 PM  9/27/2017  8 AM - 12 PM  9/27/2017  BEN 
PLM - Ground/Underfloor waste  9/27/2017 1:41:58 PM  9/28/2017  8 AM - 12 PM  9/28/2017  JOS 
PLM - Gas Test  9/27/2017 2:50:46 PM  9/28/2017  8 AM - 12 PM  9/28/2017  JOS 
PLM - Underground gas  9/27/2017 2:51:09 PM  9/28/2017  8 AM - 12 PM  9/28/2017  JOS 
PLM - Underground gas  9/28/2017 5:32:55 PM  9/29/2017  8 AM - 12 PM  9/29/2017  BEN 
Approved: School Fees Due  10/4/2017      10/25/2017  APPR  CMN 
Approved by Elec Engineering  10/4/2017      10/20/2017 9:36:00 AM  APPR  JJB 
Route to Elec Engineering  10/4/2017  10/20/2017    10/20/2017  APPR  JJB 
Approved by Electrical  10/4/2017      10/19/2017 3:16:28 PM  APPR  MCS 
Route to Electrical  10/4/2017  10/20/2017    10/19/2017  APPR  MCS 
Approved by Mechanical  10/4/2017      10/20/2017 3:43:47 PM  APPR  GAQ 
Route to Mechanical  10/4/2017  10/20/2017    10/20/2017  APPR  GAQ 
Approved by Planning Zoning  10/4/2017      10/24/2017 10:46:35 AM  APPR  EYT 
Route to Planning Zoning  10/4/2017  10/20/2017    10/24/2017  APPR  EYT 
Approved by Plumbing  10/4/2017      10/20/2017 3:43:37 PM  APPR  GAQ 
Route to Plumbing  10/4/2017  10/20/2017    10/20/2017  APPR  GAQ 
Apprv. by PW Develop. Services  10/4/2017      10/24/2017 10:59:28 AM  APPR  SXA 
Route to PW Develop. Services  10/4/2017  10/20/2017    10/24/2017  APPR  SXA 
Apprv. by Struct/Architectural  10/4/2017      10/23/2017 2:30:32 PM  APPR  CSG 
Route to Struct/Architectual  10/4/2017  10/20/2017    10/23/2017  APPR  CSG 
Approved by Traffic Eng.  10/4/2017      10/23/2017 4:15:50 PM  APPR  RXC 
Route to Traffic Engineering  10/4/2017  10/20/2017    10/23/2017  APPR  RXC 
Approved by Water Engineering  10/4/2017      10/23/2017 9:19:32 AM  APPR  DRS 
Route to Water Engineering  10/4/2017  10/20/2017    10/23/2017  APPR  DRS 
PLM - Water Service  10/5/2017 4:12:43 PM  10/6/2017  8 AM - 12 PM  10/6/2017  JOS 
MEC - Underground Rough  10/5/2017 4:13:00 PM  10/6/2017  8 AM - 12 PM  10/6/2017  JOS 
BLD - Reinforcing Insp  10/8/2017  10/10/2017  12 PM - 3 PM  10/10/2017  BEN 
BLD - Reinforcing Insp  10/9/2017  10/10/2017  12 PM - 3 PM  10/10/2017  BEN 
BLD - Pre-Slab Insp  10/9/2017 8:34:17 PM  10/10/2017  12 PM - 3 PM  10/10/2017  BEN 
ELE - Underground conduit  10/9/2017 8:44:52 PM  10/10/2017  12 PM - 3 PM  10/10/2017  BEN 
ELE - Underground conduit  10/10/2017 3:07:36 PM  10/11/2017  8 AM - 12 PM  10/11/2017  BEN 
PLM - Ground/Underfloor waste  10/10/2017 3:07:57 PM  10/11/2017  8 AM - 12 PM  10/11/2017  BEN 
ELE - Underground conduit  10/11/2017 3:55:36 PM  10/12/2017  12 PM - 3 PM  10/12/2017  BEN 
PLM - Ground/Underfloor waste  10/11/2017 3:56:02 PM  10/12/2017  12 PM - 3 PM  10/12/2017  BEN 
BLD - Pre-Slab Insp  10/17/2017 6:25:35 PM  10/18/2017  12 PM - 3 PM  10/18/2017  BEN 
BLD - Reinforcing Insp  10/17/2017 6:25:43 PM  10/18/2017  12 PM - 3 PM  10/18/2017  BEN 
BLD - Pre-Slab Insp  10/18/2017 3:20:33 PM  10/19/2017    10/19/2017  BEN 
PLM - Ground/Underfloor waste  10/18/2017 3:21:06 PM  10/19/2017    10/19/2017  BEN 
PLM - Sewer  10/18/2017 3:21:43 PM  10/19/2017    10/19/2017  BEN 
BLD - Pre-Slab Insp  10/19/2017 1:16:31 PM  10/20/2017  10 AM - 2 PM  10/20/2017  BEN 
BLD - Reinforcing Insp  10/19/2017 1:16:38 PM  10/20/2017  10 AM - 2 PM  10/20/2017  BEN 
ELE - Underground conduit  10/20/2017 2:28:30 PM  10/23/2017  10 AM - 2 PM  10/23/2017  GCT 
BLD - Footings Insp  10/20/2017 2:53:33 PM  10/23/2017  10 AM - 2 PM  10/23/2017  GCT 
BLD - Reinforcing Insp  10/20/2017 2:53:40 PM  10/23/2017  10 AM - 2 PM  10/23/2017  GCT 
BLD - Reinforcing Insp  10/23/2017 1:52:44 PM  10/24/2017  10 AM - 2 PM  10/24/2017  GCT 
BLD - Reinforcing Insp  10/24/2017 3:03:59 PM  10/25/2017  12 PM - 3 PM  10/25/2017  BEN 
BLD - Footings Insp  10/25/2017 12:46:02 PM  10/26/2017  12 PM - 3 PM  10/26/2017  BEN 
BLD - Footings Insp  10/26/2017 12:01:28 PM  10/27/2017  12 PM - 3 PM  10/27/2017  BEN 
BLD - Footings Insp  10/29/2017 2:15:48 PM  10/30/2017  12 PM - 3 PM  10/30/2017  GCT 
BLD - Pre-Slab Insp  10/29/2017 2:16:02 PM  10/30/2017  12 PM - 3 PM  10/30/2017  GCT 
BLD - Footings Insp  10/30/2017 1:04:45 PM  10/31/2017  12 PM - 3 PM  10/31/2017  BEN 
BLD - Pre-Slab Insp  10/30/2017 1:04:53 PM  10/31/2017  12 PM - 3 PM  10/31/2017  BEN 
BLD - Footings Insp  10/31/2017 1:57:45 PM  11/1/2017  12 PM - 3 PM  11/1/2017  BEN 
BLD - Pre-Slab Insp  10/31/2017 1:57:58 PM  11/1/2017  12 PM - 3 PM  11/1/2017  BEN 
ELE - Underground conduit  10/31/2017 1:58:06 PM  11/1/2017  12 PM - 3 PM  11/1/2017  BEN 
BLD - Footings Insp  11/1/2017 2:33:55 PM  11/2/2017  12 PM - 3 PM  11/2/2017  BEN 
BLD - Reinforcing Insp  11/1/2017 2:34:52 PM  11/2/2017  12 PM - 3 PM  11/2/2017  BEN 
ELE - Underground conduit  11/1/2017 2:35:21 PM  11/2/2017  12 PM - 3 PM  11/2/2017  BEN 
BLD - Reinforcing Insp  11/2/2017 3:44:11 PM  11/3/2017  12 PM - 3 PM  11/3/2017  BEN 
BLD - Footings Insp  11/2/2017 4:07:35 PM  11/3/2017  12 PM - 3 PM  11/3/2017  BEN 
BLD - Footings Insp  11/5/2017 3:45:34 PM  11/6/2017  10 AM - 2 PM  11/6/2017  MMO 
ELE - Underground conduit  11/5/2017 3:45:59 PM  11/6/2017  10 AM - 2 PM  11/6/2017  MMO 
BLD - Footings Insp  11/6/2017 2:15:26 PM  11/7/2017  12 PM - 3 PM  11/7/2017  BEN 
BLD - Footings Insp  11/7/2017 11:08:48 AM  11/8/2017  12 PM - 3 PM  11/8/2017  BEN 
ELE - Underground conduit  11/7/2017 11:34:40 AM  11/8/2017  12 PM - 3 PM  11/8/2017  BEN 
BLD - Footings Insp  11/8/2017 12:50:57 PM  11/9/2017  12 PM - 3 PM  11/9/2017  BEN 
ELE - Underground conduit  11/8/2017 12:51:08 PM  11/9/2017  12 PM - 3 PM  11/9/2017  BEN 
BLD - Footings Insp  11/12/2017 4:07:56 PM  11/13/2017  10 AM - 2 PM  11/13/2017  MMO 
ELE - Underground conduit  11/12/2017 4:08:09 PM  11/13/2017  10 AM - 2 PM  11/13/2017  MMO 
ELE - Underground conduit  11/13/2017 3:55:46 PM  11/14/2017  10 AM - 2 PM  11/14/2017  MMO 
ELE - Ground Electrode/UFER  11/13/2017 3:55:58 PM  11/14/2017  10 AM - 2 PM  11/14/2017  MMO 
BLD - Footings Insp  11/14/2017 3:19:25 PM  11/15/2017  12 PM - 3 PM  11/15/2017  BEN 
ELE - Underground conduit  11/14/2017 3:19:37 PM  11/15/2017  12 PM - 3 PM  11/15/2017  BEN 
BLD - Footings Insp  11/15/2017 2:02:11 PM  11/16/2017  12 PM - 3 PM  11/16/2017  BEN 
Approved: Health Set Required  6/6/2017      8/1/2017  APPR  CMN 
BLD - Footings Insp  11/16/2017 2:55:11 PM  11/17/2017  12 PM - 3 PM  11/17/2017  BEN 
BLD - Reinforcing Insp  11/28/2017 2:52:35 PM  11/29/2017  12 PM - 3 PM  11/29/2017  BEN 
BLD - Reinforcing Insp  11/30/2017 3:00:52 PM  12/1/2017    12/1/2017  BEN 
ELE - Underground conduit  12/1/2017 2:13:18 PM  12/4/2017  8 AM - 12 PM  12/4/2017  GCT 
BLD - Reinforcing Insp  12/4/2017 3:21:23 PM  12/5/2017  12 PM - 3 PM  12/5/2017  BEN 
ELE - Underground conduit  12/4/2017 3:21:31 PM  12/5/2017  12 PM - 3 PM  12/5/2017  BEN 
BLD - Reinforcing Insp  12/5/2017 2:23:55 PM  12/6/2017    12/6/2017  BEN 
BLD - Reinforcing Insp  12/6/2017 3:18:48 PM  12/7/2017  12 PM - 3 PM  12/7/2017  BEN 
BLD - Reinforcing Insp  12/8/2017  12/8/2017  12 PM - 3 PM  12/8/2017  BEN 
ELE - Ground Electrode/UFER  12/8/2017 3:28:31 PM  12/11/2017  10 AM - 2 PM  12/11/2017  GCT 
ELE - Ground Electrode/UFER  12/11/2017 2:54:26 PM  12/12/2017  12 PM - 3 PM  12/12/2017  BEN 
BLD - Reinforcing Insp  12/13/2017 2:54:45 PM  12/14/2017  12 PM - 3 PM  12/14/2017  BEN 
BLD - Footings Insp  12/13/2017 2:54:56 PM  12/14/2017  12 PM - 3 PM  12/14/2017  BEN 
BLD - Pre-Slab Insp  12/17/2017 4:04:17 PM  12/18/2017    12/18/2017  GCT 
BLD - Pre-Slab Insp  12/20/2017 2:40:32 PM  12/21/2017  12 PM - 3 PM  12/21/2017  BEN 
BLD - Pre-Slab Insp  12/21/2017 1:44:34 PM  12/22/2017  8 AM - 12 PM  12/22/2017  BEN 
MEC - Underground Rough  12/21/2017 1:44:52 PM  12/22/2017  8 AM - 12 PM  12/22/2017  BEN 
BLD - Pre-Slab Insp  12/25/2017 8:47:17 AM  12/26/2017  10 AM - 2 PM  12/26/2017  GCT 
BLD - Reinforcing Insp  1/2/2018 2:28:51 PM  1/3/2018    1/3/2018  GCT 
BLD - Footings Insp  1/2/2018 2:28:59 PM  1/3/2018    1/3/2018  GCT 
BLD - Footings Insp  1/3/2018 3:49:05 PM  1/4/2018  10 AM - 2 PM  1/4/2018  GCT 
BLD - Reinforcing Insp  1/3/2018 3:49:14 PM  1/4/2018  10 AM - 2 PM  1/4/2018  GCT 
BLD - Reinforcing Insp  1/4/2018 3:22:12 PM  1/5/2018  8 AM - 12 PM  1/5/2018  MMO 
BLD - Footings Insp  1/4/2018 3:22:23 PM  1/5/2018  8 AM - 12 PM  1/5/2018  MMO 
BLD - Reinforcing Insp  1/5/2018 2:12:33 PM  1/8/2018  8 AM - 12 PM  1/8/2018  GCT 
BLD - Footings Insp  1/5/2018 2:12:44 PM  1/8/2018  8 AM - 12 PM  1/8/2018  GCT 
BLD - Footings Insp  1/8/2018 1:12:50 PM  1/9/2018  12 PM - 3 PM  1/9/2018  BEN 
BLD - Reinforcing Insp  1/8/2018 1:12:58 PM  1/9/2018  12 PM - 3 PM  1/9/2018  BEN 
BLD - Reinforcing Insp  1/9/2018 1:33:04 PM  1/10/2018  12 PM - 3 PM  1/10/2018  BEN 
BLD - Reinforcing Insp  1/10/2018 2:20:31 PM  1/11/2018  12 PM - 3 PM  1/11/2018  BEN 
BLD - Pre-Slab Insp  1/10/2018 2:20:38 PM  1/11/2018  12 PM - 3 PM  1/11/2018  BEN 
ELE - Underground conduit  1/10/2018 2:20:52 PM  1/11/2018  12 PM - 3 PM  1/11/2018  BEN 
ELE - Ground Electrode/UFER  1/10/2018 2:21:00 PM  1/11/2018  12 PM - 3 PM  1/11/2018  BEN 
ELE - Ground Electrode/UFER  1/11/2018 9:30:46 AM  1/12/2018  12 PM - 3 PM  1/12/2018  BEN 
ELE - Underground conduit  1/11/2018 9:31:11 AM  1/12/2018  12 PM - 3 PM  1/12/2018  BEN 
BLD - Reinforcing Insp  1/11/2018 4:21:37 PM  1/12/2018  12 PM - 3 PM  1/12/2018  BEN 
BLD - Reinforcing Insp  1/15/2018 1:56:06 PM  1/16/2018  8 AM - 12 PM  1/16/2018  GCT 
BLD - Reinforcing Insp  1/16/2018 2:36:03 PM  1/17/2018  12 PM - 3 PM  1/17/2018  BEN 
BLD - Reinforcing Insp  1/18/2018 2:40:00 PM  1/19/2018  12 PM - 3 PM  1/19/2018  BEN 
BLD - Pre-Slab Insp  1/22/2018  1/22/2018  8 AM - 12 PM  1/22/2018  GCT 
BLD - Reinforcing Insp  1/22/2018 3:21:22 PM  1/23/2018  8 AM - 12 PM  1/23/2018  GCT 
BLD - Reinforcing Insp  1/23/2018 2:29:06 PM  1/24/2018  12 PM - 3 PM  1/24/2018  BEN 
BLD - Reinforcing Insp  1/31/2018 3:33:35 PM  2/1/2018  12 PM - 3 PM  2/1/2018  BEN 
BLD - Reinforcing Insp  2/1/2018 3:11:07 PM  2/2/2018  12 PM - 3 PM  2/2/2018  BEN 
BLD - Reinforcing Insp  2/2/2018 2:13:42 PM  2/5/2018  10 AM - 2 PM  2/5/2018  BEN 
ELE - Underground conduit  2/5/2018 1:33:39 PM  2/6/2018  10 AM - 2 PM  2/6/2018  BCJ 
BLD - Reinforcing Insp  2/5/2018 2:19:21 PM  2/6/2018  10 AM - 2 PM  2/6/2018  BCJ 
BLD - Footings Insp  2/5/2018 3:06:05 PM  2/6/2018  10 AM - 2 PM  2/6/2018  BCJ 
BLD - Reinforcing Insp  2/6/2018 2:50:46 PM  2/7/2018  12 PM - 3 PM  2/7/2018  BEN 
ELE - Underground conduit  2/6/2018 2:51:02 PM  2/7/2018  12 PM - 3 PM  2/7/2018  BEN 
BLD - Framing Insp.  2/6/2018 2:51:09 PM  2/7/2018  12 PM - 3 PM  2/7/2018  BEN 
BLD -Floor Joists/Girders Insp  2/6/2018 2:51:21 PM  2/7/2018  12 PM - 3 PM  2/7/2018  BEN 
BLD - Reinforcing Insp  2/7/2018 3:44:23 PM  2/8/2018  8 AM - 12 PM  2/8/2018  BEN 
BLD - Pre-Slab Insp  2/7/2018 3:44:31 PM  2/8/2018  8 AM - 12 PM  2/8/2018  BEN 
BLD - Pre-Slab Insp  2/8/2018 3:25:43 PM  2/9/2018  12 PM - 3 PM  2/9/2018  BEN 
BLD - Reinforcing Insp  2/8/2018 7:38:28 PM  2/9/2018  12 PM - 3 PM  2/9/2018  BEN 
BLD - Reinforcing Insp  2/9/2018 2:31:43 PM  2/12/2018    2/12/2018  GCT 
BLD - Reinforcing Insp  2/12/2018 2:57:48 PM  2/13/2018  12 PM - 3 PM  2/13/2018  BEN 
BLD - Reinforcing Insp  2/13/2018 3:14:46 PM  2/14/2018  12 PM - 3 PM  2/14/2018  BEN 
BLD - Framing Insp.  2/13/2018 3:14:53 PM  2/14/2018  12 PM - 3 PM  2/14/2018  BEN 
PLM - Rough/Topout  2/13/2018 3:15:20 PM  2/14/2018  12 PM - 3 PM  2/14/2018  BEN 
PLM - Ground/Underfloor waste  2/13/2018 3:15:37 PM  2/14/2018  12 PM - 3 PM  2/14/2018  BEN 
BLD - Footings Insp  2/14/2018 3:33:21 PM  2/15/2018  12 PM - 3 PM  2/15/2018  BEN 
BLD - Reinforcing Insp  2/14/2018 3:33:30 PM  2/15/2018  12 PM - 3 PM  2/15/2018  BEN 
BLD -Floor Joists/Girders Insp  2/14/2018 3:33:42 PM  2/15/2018  12 PM - 3 PM  2/15/2018  BEN 
BLD - Framing Insp.  2/14/2018 3:34:36 PM  2/15/2018  12 PM - 3 PM  2/15/2018  BEN 
BLD - Reinforcing Insp  2/15/2018 2:41:21 PM  2/16/2018  12 PM - 3 PM  2/16/2018  BEN 
BLD -Floor Joists/Girders Insp  2/15/2018 2:41:53 PM  2/16/2018  12 PM - 3 PM  2/16/2018  BEN 
MEC - Rough Mechanical  2/15/2018 2:42:11 PM  2/16/2018  12 PM - 3 PM  2/16/2018  BEN 
PLM - Ground/Underfloor waste  2/15/2018 2:42:22 PM  2/16/2018  12 PM - 3 PM  2/16/2018  BEN 
PLM - Ground/Underfloor water  2/15/2018 2:43:24 PM  2/16/2018  12 PM - 3 PM  2/16/2018  BEN 
PLM - Rough/Topout  2/15/2018 2:45:10 PM  2/16/2018  12 PM - 3 PM  2/16/2018  BEN 
BLD - Framing Insp.  2/15/2018 2:45:25 PM  2/16/2018  12 PM - 3 PM  2/16/2018  BEN 
BLD - Footings Insp  2/15/2018 8:06:10 PM  2/16/2018  12 PM - 3 PM  2/16/2018  BEN 
BLD - Reinforcing Insp  2/20/2018  2/20/2018  10 AM - 2 PM  2/20/2018  GCT 
ELE - Underground conduit  2/20/2018  2/20/2018  10 AM - 2 PM  2/20/2018  GCT 
PLM - Ground/Underfloor waste  2/20/2018  2/20/2018  10 AM - 2 PM  2/20/2018  GCT 
BLD - Framing Insp.  2/20/2018  2/21/2018  8 AM - 12 PM  2/21/2018  GCT 
ELE - Rough Electrical  2/20/2018  2/21/2018  8 AM - 12 PM  2/21/2018  GCT 
BLD - Pre-Slab Insp  2/20/2018  2/21/2018  8 AM - 12 PM  2/21/2018  GCT 
BLD - Reinforcing Insp  2/21/2018 12:02:05 PM  2/22/2018  12 PM - 3 PM  2/22/2018  BEN 
MEC - Rough Mechanical  2/21/2018 12:02:26 PM  2/22/2018  12 PM - 3 PM  2/22/2018  BEN 
MEC - Gas Test  2/21/2018 12:02:40 PM  2/22/2018  12 PM - 3 PM  2/22/2018  BEN 
PLM - Rough/Topout  2/21/2018 12:03:03 PM  2/22/2018  12 PM - 3 PM  2/22/2018  BEN 
PLM - Ground/Underfloor waste  2/21/2018 12:04:04 PM  2/22/2018  12 PM - 3 PM  2/22/2018  BEN 
ELE - Underground conduit  2/21/2018 3:08:56 PM  2/22/2018  12 PM - 3 PM  2/22/2018  BEN 
BLD - Reinforcing Insp  2/22/2018 11:28:38 AM  2/23/2018  12 PM - 3 PM  2/23/2018  BEN 
PLM - Ground/Underfloor water  2/28/2018 3:13:07 PM  3/1/2018  12 PM - 3 PM  3/1/2018  BEN 
MEC - Rough Mechanical  2/28/2018 3:13:55 PM  3/1/2018  12 PM - 3 PM  3/1/2018  BEN 
BLD - Framing Insp.  3/1/2018 2:30:17 PM  3/2/2018  12 PM - 3 PM  3/2/2018  BEN 
BLD - Drywall Inspection  3/1/2018 2:30:24 PM  3/2/2018  12 PM - 3 PM  3/2/2018  BEN 
MEC - Rough Mechanical  3/1/2018 2:30:35 PM  3/2/2018  12 PM - 3 PM  3/2/2018  BEN 
BLD - Framing Insp.  3/2/2018 2:19:03 PM  3/5/2018    3/5/2018  GCT 
BLD - Drywall Inspection  3/2/2018 2:19:13 PM  3/5/2018    3/5/2018  GCT 
BLD - Framing Insp.  3/5/2018 2:46:13 PM  3/6/2018    3/6/2018  BEN 
BLD - Drywall Inspection  3/5/2018 2:46:20 PM  3/6/2018    3/6/2018  BEN 
PLM - Ground/Underfloor waste  3/6/2018 11:09:33 AM  3/7/2018  12 PM - 3 PM  3/7/2018  BEN 
BLD - Drywall Inspection  3/7/2018 1:07:28 PM  3/8/2018  12 PM - 3 PM  3/8/2018  BEN 
PLM - Rough/Topout  3/7/2018 1:08:41 PM  3/8/2018  12 PM - 3 PM  3/8/2018  BEN 
PLM - Underground gas  3/7/2018 3:42:57 PM  3/8/2018  12 PM - 3 PM  3/8/2018  BEN 
BLD - Drywall Inspection  3/8/2018 11:05:41 AM  3/9/2018  12 PM - 3 PM  3/9/2018  BEN 
BLD - Framing Insp.  3/9/2018 1:51:29 PM  3/12/2018  12 PM - 3 PM  3/12/2018  GCT 
BLD - Drywall Inspection  3/9/2018 1:51:48 PM  3/12/2018  12 PM - 3 PM  3/12/2018  GCT 
BLD - Framing Insp.  3/12/2018 1:54:06 PM  3/13/2018  12 PM - 3 PM  3/13/2018  BEN 
BLD - Drywall Inspection  3/12/2018 1:54:15 PM  3/13/2018  12 PM - 3 PM  3/13/2018  BEN 
BLD - Reinforcing Insp  3/12/2018 1:54:24 PM  3/13/2018  12 PM - 3 PM  3/13/2018  BEN 
BLD - Exterior Lath Insp  3/12/2018 1:54:32 PM  3/13/2018  12 PM - 3 PM  3/13/2018  BEN 
BLD - Penetrations -Fire Rated  3/12/2018 1:55:01 PM  3/13/2018  12 PM - 3 PM  3/13/2018  BEN 
ELE - Rough Electrical  3/12/2018 1:55:24 PM  3/13/2018  12 PM - 3 PM  3/13/2018  BEN 
MEC - Rough Duct  3/12/2018 1:59:29 PM  3/13/2018  12 PM - 3 PM  3/13/2018  BEN 
MEC - Rough Mechanical  3/12/2018 2:29:34 PM  3/13/2018  12 PM - 3 PM  3/13/2018  BEN 
BLD - Framing Insp.  3/13/2018 2:20:05 PM  3/14/2018  12 PM - 3 PM  3/14/2018  BEN 
BLD - Drywall Inspection  3/13/2018 2:20:11 PM  3/14/2018  12 PM - 3 PM  3/14/2018  BEN 
ELE - Ground Electrode/UFER  3/13/2018 2:20:19 PM  3/14/2018  12 PM - 3 PM  3/14/2018  BEN 
MEC - Rough Mechanical  3/13/2018 2:20:34 PM  3/14/2018  12 PM - 3 PM  3/14/2018  BEN 
PLM - Ground/Underfloor waste  3/13/2018 2:20:46 PM  3/14/2018  12 PM - 3 PM  3/14/2018  BEN 
PLM - Ground/Underfloor water  3/13/2018 2:20:54 PM  3/14/2018  12 PM - 3 PM  3/14/2018  BEN 
BLD - Framing Insp.  3/14/2018 11:40:53 AM  3/15/2018  12 PM - 3 PM  3/15/2018  BEN 
BLD - Drywall Inspection  3/14/2018 11:41:01 AM  3/15/2018  12 PM - 3 PM  3/15/2018  BEN 
ELE - Rough Electrical  3/14/2018 11:41:09 AM  3/15/2018  12 PM - 3 PM  3/15/2018  BEN 
ELE - Underground conduit  3/14/2018 2:39:49 PM  3/15/2018  12 PM - 3 PM  3/15/2018  BEN 
PLM - Ground/Underfloor waste  3/14/2018 2:40:04 PM  3/15/2018  12 PM - 3 PM  3/15/2018  BEN 
PLM - Ground/Underfloor waste  3/16/2018 12:24:37 PM  3/19/2018  8 AM - 12 PM  3/19/2018  GCT 
PLM - Ground/Underfloor water  3/16/2018 12:24:49 PM  3/19/2018  8 AM - 12 PM  3/19/2018  GCT 
BLD - Footings Insp  3/19/2018 2:33:44 PM  3/20/2018  8 AM - 12 PM  3/20/2018  BEN 
ELE - Rough Electrical  3/19/2018 2:40:29 PM  3/20/2018  8 AM - 12 PM  3/20/2018  BEN 
BLD - Drywall Inspection  3/20/2018 4:10:45 PM  3/21/2018  10 AM - 2 PM  3/21/2018  BEN 
PLM - Ground/Underfloor waste  3/20/2018 4:11:01 PM  3/21/2018  10 AM - 2 PM  3/21/2018  BEN 
BLD - Framing Insp.  3/22/2018 2:19:45 PM  3/23/2018  8 AM - 12 PM  3/23/2018  BEN 
BLD - Drywall Inspection  3/22/2018 2:21:24 PM  3/23/2018  8 AM - 12 PM  3/23/2018  BEN 
BLD - Framing Insp.  3/23/2018 2:53:09 PM  3/26/2018  10 AM - 2 PM  3/26/2018  GCT 
BLD - Drywall Inspection  3/23/2018 2:53:27 PM  3/26/2018  10 AM - 2 PM  3/26/2018  GCT 
ELE - Rough Electrical  3/23/2018 2:54:00 PM  3/26/2018  10 AM - 2 PM  3/26/2018  GCT 
BLD - Framing Insp.  3/26/2018 1:14:53 PM  3/27/2018  8 AM - 12 PM  3/27/2018  BEN 
BLD - Drywall Inspection  3/26/2018 1:15:01 PM  3/27/2018  8 AM - 12 PM  3/27/2018  BEN 
ELE - Rough Electrical  3/26/2018 1:15:10 PM  3/27/2018  8 AM - 12 PM  3/27/2018  BEN 
BLD - Framing Insp.  3/27/2018 2:27:49 PM  3/28/2018  8 AM - 12 PM  3/28/2018  BEN 
BLD - Drywall Inspection  3/27/2018 2:27:55 PM  3/28/2018  8 AM - 12 PM  3/28/2018  BEN 
ELE - Rough Electrical  3/27/2018 2:28:07 PM  3/28/2018  8 AM - 12 PM  3/28/2018  BEN 
BLD - Framing Insp.  3/28/2018 2:17:57 PM  3/29/2018  10 AM - 2 PM  3/29/2018  BEN 
BLD - Drywall Inspection  3/28/2018 2:18:08 PM  3/29/2018  10 AM - 2 PM  3/29/2018  BEN 
ELE - Rough Electrical  3/28/2018 2:18:24 PM  3/29/2018  10 AM - 2 PM  3/29/2018  BEN 
BLD - Framing Insp.  3/29/2018 1:43:21 PM  3/30/2018  12 PM - 3 PM  3/30/2018  BEN 
BLD - Drywall Inspection  3/29/2018 1:43:28 PM  3/30/2018  12 PM - 3 PM  3/30/2018  BEN 
ELE - Rough Electrical  3/29/2018 1:43:39 PM  3/30/2018  12 PM - 3 PM  3/30/2018  BEN 
BLD - Framing Insp.  3/30/2018 11:30:50 AM  4/2/2018  8 AM - 12 PM  4/2/2018  JOS 
BLD - Drywall Inspection  3/30/2018 11:30:57 AM  4/2/2018  8 AM - 12 PM  4/2/2018  JOS 
ELE - Rough Electrical  3/30/2018 11:31:05 AM  4/2/2018  8 AM - 12 PM  4/2/2018  JOS 
BLD - Framing Insp.  4/2/2018 3:27:23 PM  4/3/2018  10 AM - 2 PM  4/3/2018  BEN 
BLD - Drywall Inspection  4/2/2018 3:27:33 PM  4/3/2018  10 AM - 2 PM  4/3/2018  BEN 
ELE - Rough Electrical  4/2/2018 3:27:43 PM  4/3/2018  10 AM - 2 PM  4/3/2018  BEN 
BLD - Framing Insp.  4/3/2018 3:10:57 PM  4/4/2018  10 AM - 2 PM  4/4/2018  BEN 
BLD - Drywall Inspection  4/3/2018 3:11:03 PM  4/4/2018  10 AM - 2 PM  4/4/2018  BEN 
ELE - Rough Electrical  4/3/2018 3:11:20 PM  4/4/2018  10 AM - 2 PM  4/4/2018  BEN 
MEC - Rough Duct  4/3/2018 3:11:33 PM  4/4/2018  10 AM - 2 PM  4/4/2018  BEN 
BLD - Framing Insp.  4/4/2018 2:12:22 PM  4/5/2018  12 PM - 3 PM  4/5/2018  BEN 
BLD - Drywall Inspection  4/4/2018 2:12:28 PM  4/5/2018  12 PM - 3 PM  4/5/2018  BEN 
ELE - Rough Electrical  4/4/2018 2:13:02 PM  4/5/2018  12 PM - 3 PM  4/5/2018  BEN 
BLD - Framing Insp.  4/6/2018 1:47:39 PM  4/9/2018  10 AM - 2 PM  4/9/2018  JOS 
BLD - Drywall Inspection  4/6/2018 1:47:45 PM  4/9/2018  10 AM - 2 PM  4/9/2018  JOS 
ELE - Rough Electrical  4/6/2018 1:47:59 PM  4/9/2018  10 AM - 2 PM  4/9/2018  JOS 
MEC - Rough Duct  4/10/2018 2:14:15 PM  4/11/2018  12 PM - 3 PM  4/11/2018  BEN 
BLD - Framing Insp.  4/12/2018 12:01:42 PM  4/13/2018  8 AM - 12 PM  4/13/2018  BEN 
ELE - Rough Electrical  4/12/2018 1:24:55 PM  4/13/2018  8 AM - 12 PM  4/13/2018  BEN 
BLD - Framing Insp.  4/13/2018 11:55:11 AM  4/16/2018    4/16/2018  GCT 
ELE - Rough Electrical  4/13/2018 11:55:22 AM  4/16/2018    4/16/2018  GCT 
MEC - Rough Duct  4/17/2018 2:48:44 PM  4/18/2018  8 AM - 12 PM  4/18/2018  BEN 
ELE - Rough Electrical  4/18/2018 1:43:14 PM  4/19/2018  8 AM - 12 PM  4/19/2018  BEN 
BLD - Framing Insp.  4/18/2018 1:44:11 PM  4/19/2018  8 AM - 12 PM  4/19/2018  BEN 
BLD - Drywall Inspection  4/18/2018 1:44:20 PM  4/19/2018  8 AM - 12 PM  4/19/2018  BEN 
BLD - Framing Insp.  4/19/2018 3:04:55 PM  4/20/2018  10 AM - 2 PM  4/20/2018  JOS 
ELE - Rough Electrical  4/19/2018 3:05:17 PM  4/20/2018  10 AM - 2 PM  4/20/2018  JOS 
BLD - Framing Insp.  4/20/2018 1:42:29 PM  4/23/2018  10 AM - 2 PM  4/23/2018  GCT 
BLD - Drywall Inspection  4/20/2018 1:42:36 PM  4/23/2018  10 AM - 2 PM  4/23/2018  GCT 
BLD - Penetrations -Fire Rated  4/20/2018 1:42:50 PM  4/23/2018  10 AM - 2 PM  4/23/2018  GCT 
ELE - Rough Electrical  4/20/2018 1:43:01 PM  4/23/2018  10 AM - 2 PM  4/23/2018  GCT 
BLD - Framing Insp.  4/23/2018 2:16:16 PM  4/24/2018  10 AM - 2 PM  4/24/2018  GCT 
ELE - Rough Electrical  4/23/2018 2:16:43 PM  4/24/2018  10 AM - 2 PM  4/24/2018  GCT 
BLD - Framing Insp.  4/24/2018 2:40:36 PM  4/25/2018  10 AM - 2 PM  4/25/2018  GCT 
ELE - Rough Electrical  4/24/2018 2:40:45 PM  4/25/2018  10 AM - 2 PM  4/25/2018  GCT 
PLM - Ground/Underfloor waste  4/25/2018 2:22:15 PM  4/26/2018  8 AM - 12 PM  4/26/2018  JOS 
MEC - Underground Rough  4/25/2018 2:22:24 PM  4/26/2018  8 AM - 12 PM  4/26/2018  JOS 
BLD - Framing Insp.  4/26/2018 1:35:28 PM  4/27/2018  8 AM - 12 PM  4/27/2018  MMO 
ELE - Rough Electrical  4/26/2018 1:36:28 PM  4/27/2018  8 AM - 12 PM  4/27/2018  MMO 
PLM - Ground/Underfloor waste  4/26/2018 1:36:37 PM  4/27/2018  8 AM - 12 PM  4/27/2018  MMO 
MEC - Rough Mechanical  4/26/2018 1:36:51 PM  4/27/2018  8 AM - 12 PM  4/27/2018  MMO 
BLD - Framing Insp.  4/27/2018 3:02:33 PM  4/30/2018  10 AM - 2 PM  4/30/2018  GCT 
BLD - Roof Sheathing Insp.  4/27/2018 3:02:49 PM  4/30/2018  10 AM - 2 PM  4/30/2018  GCT 
BLD - Exterior Lath Insp  4/27/2018 3:03:06 PM  4/30/2018  10 AM - 2 PM  4/30/2018  GCT 
ELE - Rough Electrical  4/27/2018 3:03:21 PM  4/30/2018  10 AM - 2 PM  4/30/2018  GCT 
BLD - Framing Insp.  4/30/2018 2:29:22 PM  5/1/2018  10 AM - 2 PM  5/1/2018  GCT 
ELE - Rough Electrical  4/30/2018 2:29:30 PM  5/1/2018  10 AM - 2 PM  5/1/2018  GCT 
PLM - Ground/Underfloor waste  4/30/2018 2:29:40 PM  5/1/2018  10 AM - 2 PM  5/1/2018  GCT 
PLM - Ground/Underfloor water  4/30/2018 2:29:47 PM  5/1/2018  10 AM - 2 PM  5/1/2018  GCT 
BLD - Roof Sheathing Insp.  5/3/2018 2:47:57 PM  5/4/2018  8 AM - 12 PM  5/4/2018  MMO 
BLD - Framing Insp.  5/7/2018 1:17:02 PM  5/8/2018  8 AM - 12 PM  5/8/2018  BEN 
BLD - Reinforcing Insp  5/7/2018 3:12:05 PM  5/8/2018  8 AM - 12 PM  5/8/2018  BEN 
BLD - Framing Insp.  5/8/2018 12:47:25 PM  5/9/2018  12 PM - 3 PM  5/9/2018  BEN 
ELE - Rough Electrical  5/8/2018 12:47:32 PM  5/9/2018  12 PM - 3 PM  5/9/2018  BEN 
BLD - Reinforcing Insp  5/8/2018 12:47:44 PM  5/9/2018  12 PM - 3 PM  5/9/2018  BEN 
BLD - Framing Insp.  5/9/2018 2:48:47 PM  5/10/2018  8 AM - 12 PM  5/10/2018  BEN 
ELE - Rough Electrical  5/9/2018 2:48:55 PM  5/10/2018  8 AM - 12 PM  5/10/2018  BEN 
BLD - Framing Insp.  5/10/2018 3:17:29 PM  5/11/2018  12 PM - 3 PM  5/11/2018  BEN 
BLD - Drywall Inspection  5/10/2018 3:17:36 PM  5/11/2018  12 PM - 3 PM  5/11/2018  BEN 
BLD - Exterior Lath Insp  5/10/2018 3:17:44 PM  5/11/2018  12 PM - 3 PM  5/11/2018  BEN 
ELE - Rough Electrical  5/10/2018 3:17:50 PM  5/11/2018  12 PM - 3 PM  5/11/2018  BEN 
BLD - Framing Insp.  5/11/2018 1:19:58 PM  5/14/2018  8 AM - 12 PM  5/14/2018  GCT 
BLD - Drywall Inspection  5/11/2018 1:20:05 PM  5/14/2018  8 AM - 12 PM  5/14/2018  GCT 
BLD - Exterior Lath Insp  5/11/2018 1:20:17 PM  5/14/2018  8 AM - 12 PM  5/14/2018  GCT 
ELE - Rough Electrical  5/11/2018 1:20:24 PM  5/14/2018  8 AM - 12 PM  5/14/2018  GCT 
BLD - Reinforcing Insp  5/14/2018 2:43:15 PM  5/15/2018  8 AM - 12 PM  5/15/2018  BEN 
BLD - Exterior Lath Insp  5/14/2018 2:43:24 PM  5/15/2018  8 AM - 12 PM  5/15/2018  BEN 
ELE - Rough Electrical  5/14/2018 2:43:36 PM  5/15/2018  8 AM - 12 PM  5/15/2018  BEN 
BLD - Reinforcing Insp  5/15/2018 1:57:05 PM  5/16/2018  12 PM - 3 PM  5/16/2018  BEN 
ELE - Rough Electrical  5/15/2018 1:57:17 PM  5/16/2018  12 PM - 3 PM  5/16/2018  BEN 
BLD - Reinforcing Insp  5/16/2018 2:35:28 PM  5/17/2018  8 AM - 12 PM  5/17/2018  BEN 
BLD - Exterior Lath Insp  5/16/2018 8:25:55 PM  5/17/2018  8 AM - 12 PM  5/17/2018  BEN 
BLD - Drywall Inspection  5/16/2018 8:26:26 PM  5/17/2018  8 AM - 12 PM  5/17/2018  BEN 
BLD - Reinforcing Insp  5/17/2018 2:35:18 PM  5/18/2018  12 PM - 3 PM  5/18/2018  BEN 
BLD - Reinforcing Insp  5/18/2018 1:24:31 PM  5/21/2018  8 AM - 12 PM  5/21/2018  GCT 
BLD - Exterior Lath Insp  5/18/2018 1:24:40 PM  5/21/2018  8 AM - 12 PM  5/21/2018  GCT 
BLD - Reinforcing Insp  5/21/2018 2:02:25 PM  5/22/2018  12 PM - 3 PM  5/22/2018  BEN 
BLD - Framing Insp.  5/21/2018 2:02:32 PM  5/22/2018  12 PM - 3 PM  5/22/2018  BEN 
ELE - Rough Electrical  5/21/2018 2:02:57 PM  5/22/2018  12 PM - 3 PM  5/22/2018  BEN 
BLD - Reinforcing Insp  5/22/2018 2:36:58 PM  5/23/2018  12 PM - 3 PM  5/24/2018  MMO 
BLD - Exterior Lath Insp  5/22/2018 2:37:36 PM  5/23/2018  12 PM - 3 PM  5/24/2018  MMO 
BLD - Framing Insp.  5/22/2018 2:37:49 PM  5/23/2018  12 PM - 3 PM  5/24/2018  MMO 
BLD - Reinforcing Insp  5/23/2018 5:42:35 AM  5/24/2018    5/24/2018  GCT 
BLD - Framing Insp.  5/23/2018 5:42:43 AM  5/24/2018    5/24/2018  GCT 
BLD - Drywall Inspection  5/23/2018 5:42:50 AM  5/24/2018    5/24/2018  GCT 
ELE - Rough Electrical  5/23/2018 5:43:02 AM  5/24/2018    5/24/2018  GCT 
BLD - Exterior Lath Insp  5/24/2018 2:47:07 PM  5/25/2018    5/25/2018  GCT 
BLD - Reinforcing Insp  5/25/2018 11:22:55 AM  5/29/2018  8 AM - 12 PM  5/29/2018  MMO 
BLD - Framing Insp.  5/25/2018 11:23:04 AM  5/29/2018  8 AM - 12 PM  5/29/2018  MMO 
BLD - Framing Insp.  5/29/2018  5/30/2018    5/30/2018  BEN 
BLD - Exterior Lath Insp  5/29/2018  5/30/2018    5/30/2018  BEN 
BLD - Framing Insp.  5/30/2018 10:12:52 AM  5/31/2018  12 PM - 3 PM  5/31/2018  BEN 
BLD - Drywall Inspection  5/30/2018 10:12:59 AM  5/31/2018  12 PM - 3 PM  5/31/2018  BEN 
ELE - Rough Electrical  5/30/2018 10:13:06 AM  5/31/2018  12 PM - 3 PM  5/31/2018  BEN 
BLD - Reinforcing Insp  5/31/2018 2:28:43 PM  6/1/2018  8 AM - 12 PM  6/1/2018  BEN 
BLD - Framing Insp.  5/31/2018 2:28:49 PM  6/1/2018  8 AM - 12 PM  6/1/2018  BEN 
BLD - Exterior Lath Insp  5/31/2018 2:28:59 PM  6/1/2018  8 AM - 12 PM  6/1/2018  BEN 
ELE - Rough Electrical  5/31/2018 2:29:08 PM  6/1/2018  8 AM - 12 PM  6/1/2018  BEN 
BLD - Reinforcing Insp  6/1/2018 2:36:50 PM  6/4/2018    6/4/2018  GCT 
BLD - Framing Insp.  6/1/2018 2:43:31 PM  6/4/2018    6/4/2018  GCT 
BLD - Drywall Inspection  6/1/2018 2:43:37 PM  6/4/2018    6/4/2018  GCT 
ELE - Rough Electrical  6/1/2018 2:43:48 PM  6/4/2018    6/4/2018  GCT 
BLD - Exterior Lath Insp  6/1/2018 5:30:52 PM  6/4/2018    6/4/2018  GCT 
BLD - Reinforcing Insp  6/4/2018 3:25:28 PM  6/5/2018  10 AM - 2 PM  6/5/2018  BEN 
BLD - Framing Insp.  6/4/2018 3:25:37 PM  6/5/2018  10 AM - 2 PM  6/5/2018  BEN 
BLD - Drywall Inspection  6/4/2018 3:25:44 PM  6/5/2018  10 AM - 2 PM  6/5/2018  BEN 
BLD - Exterior Lath Insp  6/4/2018 3:26:34 PM  6/5/2018  10 AM - 2 PM  6/5/2018  BEN 
BLD - Framing Insp.  6/5/2018 2:42:04 PM  6/6/2018  10 AM - 2 PM  6/6/2018  BEN 
BLD - Drywall Inspection  6/5/2018 2:42:09 PM  6/6/2018  10 AM - 2 PM  6/6/2018  BEN 
BLD - Exterior Lath Insp  6/5/2018 2:42:18 PM  6/6/2018  10 AM - 2 PM  6/6/2018  BEN 
ELE - Rough Electrical  6/5/2018 2:42:27 PM  6/6/2018  10 AM - 2 PM  6/6/2018  BEN 
BLD -Floor Joists/Girders Insp  6/6/2018 1:51:58 PM  6/7/2018  8 AM - 12 PM  6/7/2018  BEN 
ELE - Rough Electrical  6/6/2018 1:52:12 PM  6/7/2018  8 AM - 12 PM  6/7/2018  BEN 
BLD - Exterior Lath Insp  6/6/2018 1:52:23 PM  6/7/2018  8 AM - 12 PM  6/7/2018  BEN 
BLD - Framing Insp.  6/6/2018 1:52:30 PM  6/7/2018  8 AM - 12 PM  6/7/2018  BEN 
BLD - Drywall Inspection  6/6/2018 1:52:37 PM  6/7/2018  8 AM - 12 PM  6/7/2018  BEN 
BLD - Reinforcing Insp  6/7/2018 3:11:24 PM  6/8/2018  10 AM - 2 PM  6/8/2018  BEN 
BLD - Framing Insp.  6/7/2018 3:11:34 PM  6/8/2018  10 AM - 2 PM  6/8/2018  BEN 
BLD - Drywall Inspection  6/7/2018 3:11:40 PM  6/8/2018  10 AM - 2 PM  6/8/2018  BEN 
BLD - Exterior Lath Insp  6/7/2018 3:11:49 PM  6/8/2018  10 AM - 2 PM  6/8/2018  BEN 
ELE - Rough Electrical  6/7/2018 3:12:01 PM  6/8/2018  10 AM - 2 PM  6/8/2018  BEN 
BLD -Floor Joists/Girders Insp  6/7/2018 3:12:15 PM  6/8/2018  10 AM - 2 PM  6/8/2018  BEN 
Approved Alternate MatL/Method  6/7/2018      6/29/2018  DONE  CSG 
Route To Alternate MatL/Method  6/7/2018  6/26/2018    6/13/2018  CORR  CSG 
BLD - Reinforcing Insp  6/8/2018 2:02:47 PM  6/11/2018    6/11/2018  GCT 
BLD - Framing Insp.  6/8/2018 2:03:00 PM  6/11/2018    6/11/2018  GCT 
BLD - Drywall Inspection  6/8/2018 2:03:12 PM  6/11/2018    6/11/2018  GCT 
BLD - Exterior Lath Insp  6/8/2018 2:03:19 PM  6/11/2018    6/11/2018  GCT 
BLD - Insulation Insp  6/8/2018 2:03:34 PM  6/11/2018    6/11/2018  GCT 
BLD - T-Bar (Structural) Insp  6/8/2018 2:03:43 PM  6/11/2018    6/11/2018  GCT 
ELE - Rough Electrical  6/8/2018 2:03:51 PM  6/11/2018    6/11/2018  GCT 
BLD -Floor Joists/Girders Insp  6/8/2018 2:04:09 PM  6/11/2018    6/11/2018  GCT 
BLD - Reinforcing Insp  6/11/2018 3:03:53 PM  6/12/2018  10 AM - 2 PM  6/12/2018  BEN 
BLD - Framing Insp.  6/11/2018 3:04:02 PM  6/12/2018  10 AM - 2 PM  6/12/2018  BEN 
BLD - Drywall Inspection  6/11/2018 3:04:06 PM  6/12/2018  10 AM - 2 PM  6/12/2018  BEN 
BLD - Exterior Lath Insp  6/11/2018 3:04:12 PM  6/12/2018  10 AM - 2 PM  6/12/2018  BEN 
ELE - Rough Electrical  6/11/2018 3:04:26 PM  6/12/2018  10 AM - 2 PM  6/12/2018  BEN 
BLD -Floor Joists/Girders Insp  6/11/2018 3:04:41 PM  6/12/2018  10 AM - 2 PM  6/12/2018  BEN 
BLD - Insulation Insp  6/11/2018 5:09:08 PM  6/12/2018  10 AM - 2 PM  6/12/2018  BEN 
BLD - Reinforcing Insp  6/12/2018 2:16:29 PM  6/13/2018  12 PM - 3 PM  6/13/2018  BEN 
BLD - Framing Insp.  6/12/2018 2:16:40 PM  6/13/2018  12 PM - 3 PM  6/13/2018  BEN 
BLD - Drywall Inspection  6/12/2018 2:16:45 PM  6/13/2018  12 PM - 3 PM  6/13/2018  BEN 
BLD - Exterior Lath Insp  6/12/2018 2:16:55 PM  6/13/2018  12 PM - 3 PM  6/13/2018  BEN 
ELE - Rough Electrical  6/12/2018 2:17:15 PM  6/13/2018  12 PM - 3 PM  6/13/2018  BEN 
BLD -Floor Joists/Girders Insp  6/12/2018 2:17:39 PM  6/13/2018  12 PM - 3 PM  6/13/2018  BEN 
Route To Alternate MatL/Method        6/29/2018  APPR  CSG 
BLD - Framing Insp.  6/13/2018 2:47:50 PM  6/14/2018  12 PM - 3 PM  6/14/2018  BEN 
BLD - Drywall Inspection  6/13/2018 2:47:57 PM  6/14/2018  12 PM - 3 PM  6/14/2018  BEN 
BLD - Exterior Lath Insp  6/13/2018 2:48:05 PM  6/14/2018  12 PM - 3 PM  6/14/2018  BEN 
ELE - Rough Electrical  6/13/2018 2:48:19 PM  6/14/2018  12 PM - 3 PM  6/14/2018  BEN 
BLD - Framing Insp.  6/14/2018 4:01:33 PM  6/15/2018  8 AM - 12 PM  6/15/2018  BEN 
BLD - Drywall Inspection  6/14/2018 4:01:53 PM  6/15/2018  8 AM - 12 PM  6/15/2018  BEN 
BLD - Exterior Lath Insp  6/14/2018 4:02:01 PM  6/15/2018  8 AM - 12 PM  6/15/2018  BEN 
ELE - Rough Electrical  6/14/2018 4:02:26 PM  6/15/2018  8 AM - 12 PM  6/15/2018  BEN 
BLD - Framing Insp.  6/15/2018 10:50:23 AM  6/18/2018  10 AM - 2 PM  6/18/2018  GCT 
BLD - Drywall Inspection  6/15/2018 10:50:28 AM  6/18/2018  10 AM - 2 PM  6/18/2018  GCT 
BLD - Exterior Lath Insp  6/15/2018 10:50:33 AM  6/18/2018  10 AM - 2 PM  6/18/2018  GCT 
ELE - Rough Electrical  6/15/2018 10:50:57 AM  6/18/2018  10 AM - 2 PM  6/18/2018  GCT 
BLD - Reinforcing Insp  6/15/2018 11:29:39 AM  6/18/2018  10 AM - 2 PM  6/18/2018  GCT 
BLD - Framing Insp.  6/18/2018 2:18:29 PM  6/19/2018  8 AM - 12 PM  6/19/2018  BEN 
ELE - Rough Electrical  6/18/2018 2:18:37 PM  6/19/2018  8 AM - 12 PM  6/19/2018  BEN 
BLD - Framing Insp.  6/19/2018 2:29:00 PM  6/20/2018  8 AM - 12 PM  6/20/2018  BEN 
ELE - Rough Electrical  6/19/2018 2:29:11 PM  6/20/2018  8 AM - 12 PM  6/20/2018  BEN 
BLD - Framing Insp.  6/20/2018 1:35:02 PM  6/21/2018  8 AM - 12 PM  6/21/2018  BEN 
ELE - Rough Electrical  6/20/2018 1:35:13 PM  6/21/2018  8 AM - 12 PM  6/21/2018  BEN 
BLD - Reinforcing Insp  6/21/2018 2:45:37 PM  6/22/2018  8 AM - 12 PM  6/22/2018  BEN 
BLD - Framing Insp.  6/21/2018 2:45:46 PM  6/22/2018  8 AM - 12 PM  6/22/2018  BEN 
BLD - Drywall Inspection  6/21/2018 2:45:53 PM  6/22/2018  8 AM - 12 PM  6/22/2018  BEN 
BLD - Exterior Lath Insp  6/21/2018 2:46:00 PM  6/22/2018  8 AM - 12 PM  6/22/2018  BEN 
ELE - Rough Electrical  6/21/2018 2:46:09 PM  6/22/2018  8 AM - 12 PM  6/22/2018  BEN 
BLD - Framing Insp.  6/22/2018 11:31:03 AM  6/25/2018    6/25/2018  GCT 
BLD - Drywall Inspection  6/22/2018 11:31:13 AM  6/25/2018    6/25/2018  GCT 
ELE - Rough Electrical  6/22/2018 11:31:24 AM  6/25/2018    6/25/2018  GCT 
BLD -Floor Joists/Girders Insp  6/22/2018 11:31:46 AM  6/25/2018    6/25/2018  GCT 
BLD - Framing Insp.  6/25/2018 1:42:14 PM  6/26/2018  8 AM - 12 PM  6/26/2018  BEN 
BLD - Drywall Inspection  6/25/2018 1:42:20 PM  6/26/2018  8 AM - 12 PM  6/26/2018  BEN 
ELE - Rough Electrical  6/25/2018 1:42:37 PM  6/26/2018  8 AM - 12 PM  6/26/2018  BEN 
BLD -Floor Joists/Girders Insp  6/25/2018 1:42:42 PM  6/26/2018  8 AM - 12 PM  6/26/2018  BEN 
BLD - Framing Insp.  6/26/2018 2:43:03 PM  6/27/2018  8 AM - 12 PM  6/27/2018  BEN 
BLD - Drywall Inspection  6/26/2018 2:43:17 PM  6/27/2018  8 AM - 12 PM  6/27/2018  BEN 
BLD - Exterior Lath Insp  6/26/2018 2:43:23 PM  6/27/2018  8 AM - 12 PM  6/27/2018  BEN 
BLD - Interior Lath  6/26/2018 2:43:31 PM  6/27/2018  8 AM - 12 PM  6/27/2018  BEN 
ELE - Rough Electrical  6/26/2018 2:43:51 PM  6/27/2018  8 AM - 12 PM  6/27/2018  BEN 
BLD -Floor Joists/Girders Insp  6/26/2018 2:43:57 PM  6/27/2018  8 AM - 12 PM  6/27/2018  BEN 
BLD - Framing Insp.  6/27/2018 10:12:26 AM  6/28/2018  8 AM - 12 PM  6/28/2018  BEN 
BLD - Drywall Inspection  6/27/2018 10:12:34 AM  6/28/2018  8 AM - 12 PM  6/28/2018  BEN 
BLD - Exterior Lath Insp  6/27/2018 10:12:41 AM  6/28/2018  8 AM - 12 PM  6/28/2018  BEN 
ELE - Rough Electrical  6/27/2018 10:12:52 AM  6/28/2018  8 AM - 12 PM  6/28/2018  BEN 
BLD - Interior Lath  6/27/2018 10:13:05 AM  6/28/2018  8 AM - 12 PM  6/28/2018  BEN 
BLD - Framing Insp.  6/27/2018 10:21:50 AM  6/29/2018  8 AM - 12 PM  6/29/2018  BEN 
BLD - Drywall Inspection  6/27/2018 10:22:01 AM  6/29/2018  8 AM - 12 PM  6/29/2018  BEN 
BLD - Exterior Lath Insp  6/27/2018 10:22:18 AM  6/29/2018  8 AM - 12 PM  6/29/2018  BEN 
BLD - Interior Lath  6/27/2018 10:22:28 AM  6/29/2018  8 AM - 12 PM  6/29/2018  BEN 
ELE - Rough Electrical  6/27/2018 10:22:40 AM  6/29/2018  8 AM - 12 PM  6/29/2018  BEN 
BLD -Floor Joists/Girders Insp  6/27/2018 10:22:49 AM  6/29/2018  8 AM - 12 PM  6/29/2018  BEN 
BLD - Framing Insp.  6/28/2018 11:43:02 AM  7/2/2018  8 AM - 12 PM  7/2/2018  BEN 
BLD - Drywall Inspection  6/28/2018 11:43:13 AM  7/2/2018  8 AM - 12 PM  7/2/2018  BEN 
BLD - Exterior Lath Insp  6/28/2018 11:44:26 AM  7/2/2018  8 AM - 12 PM  7/2/2018  BEN 
ELE - Rough Electrical  6/28/2018 11:44:37 AM  7/2/2018  8 AM - 12 PM  7/2/2018  BEN 
MEC - Rough Duct  6/28/2018 2:37:56 PM  6/29/2018  8 AM - 12 PM  6/29/2018  BEN 
BLD - Reinforcing Insp  7/1/2018 9:16:17 AM  7/2/2018  8 AM - 12 PM  7/2/2018  BEN 
BLD - Framing Insp.  7/2/2018 2:26:40 PM  7/3/2018  10 AM - 2 PM  7/3/2018  BEN 
BLD - Drywall Inspection  7/2/2018 2:26:56 PM  7/3/2018  10 AM - 2 PM  7/3/2018  BEN 
BLD - Exterior Lath Insp  7/2/2018 2:27:12 PM  7/3/2018  10 AM - 2 PM  7/3/2018  BEN 
ELE - Rough Electrical  7/2/2018 2:27:31 PM  7/3/2018  10 AM - 2 PM  7/3/2018  BEN 
BLD -Floor Joists/Girders Insp  7/2/2018 2:27:43 PM  7/3/2018  10 AM - 2 PM  7/3/2018  BEN 
BLD - Framing Insp.  7/3/2018 12:41:58 PM  7/5/2018  8 AM - 12 PM  7/5/2018  BEN 
BLD - Drywall Inspection  7/3/2018 12:42:03 PM  7/5/2018  8 AM - 12 PM  7/5/2018  BEN 
BLD - Exterior Lath Insp  7/3/2018 12:42:10 PM  7/5/2018  8 AM - 12 PM  7/5/2018  BEN 
ELE - Rough Electrical  7/3/2018 12:42:17 PM  7/5/2018  8 AM - 12 PM  7/5/2018  BEN 
BLD -Floor Joists/Girders Insp  7/3/2018 1:10:22 PM  7/5/2018  8 AM - 12 PM  7/5/2018  BEN 
BLD - Interior Lath  7/4/2018 10:12:06 PM  7/5/2018  8 AM - 12 PM  7/5/2018  BEN 
BLD - Insulation Insp  7/4/2018 10:12:39 PM  7/5/2018  8 AM - 12 PM  7/5/2018  BEN 
BLD - Framing Insp.  7/5/2018 1:32:02 PM  7/6/2018  8 AM - 12 PM  7/6/2018  BEN 
BLD - Drywall Inspection  7/5/2018 1:32:08 PM  7/6/2018  8 AM - 12 PM  7/6/2018  BEN 
BLD - Exterior Lath Insp  7/5/2018 1:32:20 PM  7/6/2018  8 AM - 12 PM  7/6/2018  BEN 
ELE - Rough Electrical  7/5/2018 1:32:30 PM  7/6/2018  8 AM - 12 PM  7/6/2018  BEN 
BLD -Floor Joists/Girders Insp  7/5/2018 1:32:46 PM  7/6/2018  8 AM - 12 PM  7/6/2018  BEN 
BLD - Reinforcing Insp  7/6/2018 11:37:49 AM  7/9/2018    7/9/2018  GCT 
BLD - Framing Insp.  7/6/2018 11:37:54 AM  7/9/2018    7/9/2018  GCT 
BLD - Drywall Inspection  7/6/2018 11:38:05 AM  7/9/2018    7/9/2018  GCT 
BLD - Exterior Lath Insp  7/6/2018 11:38:14 AM  7/9/2018    7/9/2018  GCT 
ELE - Rough Electrical  7/6/2018 11:38:21 AM  7/9/2018    7/9/2018  GCT 
BLD -Floor Joists/Girders Insp  7/6/2018 11:38:27 AM  7/9/2018    7/9/2018  GCT 
BLD - Reinforcing Insp  7/9/2018 1:14:19 PM  7/10/2018  12 PM - 3 PM  7/10/2018  BEN 
BLD - Framing Insp.  7/9/2018 1:14:24 PM  7/10/2018  12 PM - 3 PM  7/10/2018  BEN 
BLD - Drywall Inspection  7/9/2018 1:14:30 PM  7/10/2018  12 PM - 3 PM  7/10/2018  BEN 
BLD - Exterior Lath Insp  7/9/2018 1:14:35 PM  7/10/2018  12 PM - 3 PM  7/10/2018  BEN 
ELE - Rough Electrical  7/9/2018 1:14:50 PM  7/10/2018  12 PM - 3 PM  7/10/2018  BEN 
BLD -Floor Joists/Girders Insp  7/9/2018 1:15:19 PM  7/10/2018  12 PM - 3 PM  7/10/2018  BEN 
BLD - Framing Insp.  7/10/2018 2:15:43 PM  7/11/2018  8 AM - 12 PM  7/11/2018  BEN 
BLD - Drywall Inspection  7/10/2018 2:15:51 PM  7/11/2018  8 AM - 12 PM  7/11/2018  BEN 
BLD - Exterior Lath Insp  7/10/2018 2:15:59 PM  7/11/2018  8 AM - 12 PM  7/11/2018  BEN 
ELE - Rough Electrical  7/10/2018 2:16:22 PM  7/11/2018  8 AM - 12 PM  7/11/2018  BEN 
BLD - Interior Lath  7/10/2018 2:16:33 PM  7/11/2018  8 AM - 12 PM  7/11/2018  BEN 
BLD -Floor Joists/Girders Insp  7/10/2018 2:17:28 PM  7/11/2018  8 AM - 12 PM  7/11/2018  BEN 
Approved Revision Structural  7/11/2018      7/19/2018  DONE  CSG 
Route Revision Structural  7/11/2018  7/27/2018    7/19/2018  APPR  CSG 
BLD - Framing Insp.  7/11/2018 2:31:24 PM  7/12/2018  8 AM - 12 PM  7/12/2018  BEN 
BLD - Drywall Inspection  7/11/2018 2:31:33 PM  7/12/2018  8 AM - 12 PM  7/12/2018  BEN 
BLD - Exterior Lath Insp  7/11/2018 2:31:46 PM  7/12/2018  8 AM - 12 PM  7/12/2018  BEN 
ELE - Rough Electrical  7/11/2018 2:31:59 PM  7/12/2018  8 AM - 12 PM  7/12/2018  BEN 
BLD - Framing Insp.  7/12/2018 2:45:55 PM  7/13/2018  8 AM - 12 PM  7/13/2018  BEN 
BLD - Drywall Inspection  7/12/2018 2:46:04 PM  7/13/2018  8 AM - 12 PM  7/13/2018  BEN 
BLD - Exterior Lath Insp  7/12/2018 2:49:20 PM  7/13/2018  8 AM - 12 PM  7/13/2018  BEN 
ELE - Rough Electrical  7/12/2018 2:50:45 PM  7/13/2018  8 AM - 12 PM  7/13/2018  BEN 
BLD - Framing Insp.  7/13/2018 12:39:53 PM  7/16/2018  12 PM - 3 PM  7/16/2018  JOS 
BLD - Drywall Inspection  7/13/2018 12:39:58 PM  7/16/2018  12 PM - 3 PM  7/16/2018  JOS 
BLD - Exterior Lath Insp  7/13/2018 12:40:04 PM  7/16/2018  12 PM - 3 PM  7/16/2018  JOS 
ELE - Rough Electrical  7/13/2018 12:40:14 PM  7/16/2018  12 PM - 3 PM  7/16/2018  JOS 
BLD - Framing Insp.  7/16/2018 2:44:51 PM  7/17/2018  8 AM - 12 PM  7/17/2018  BEN 
BLD - Drywall Inspection  7/16/2018 2:45:04 PM  7/17/2018  8 AM - 12 PM  7/17/2018  BEN 
BLD - Exterior Lath Insp  7/16/2018 2:45:22 PM  7/17/2018  8 AM - 12 PM  7/17/2018  BEN 
ELE - Rough Electrical  7/16/2018 2:45:39 PM  7/17/2018  8 AM - 12 PM  7/17/2018  BEN 
BLD - Framing Insp.  7/17/2018 1:40:18 PM  7/18/2018  8 AM - 12 PM  7/18/2018  BEN 
BLD - Drywall Inspection  7/17/2018 1:43:53 PM  7/18/2018  8 AM - 12 PM  7/18/2018  BEN 
BLD - Exterior Lath Insp  7/17/2018 1:46:12 PM  7/18/2018  8 AM - 12 PM  7/18/2018  BEN 
ELE - Rough Electrical  7/17/2018 1:46:25 PM  7/18/2018  8 AM - 12 PM  7/18/2018  BEN 
BLD - Insulation Insp  7/17/2018 1:51:11 PM  7/18/2018  8 AM - 12 PM  7/18/2018  BEN 
BLD - Framing Insp.  7/18/2018 3:29:27 PM  7/19/2018  8 AM - 12 PM  7/19/2018  BEN 
BLD - Drywall Inspection  7/18/2018 3:29:34 PM  7/19/2018  8 AM - 12 PM  7/19/2018  BEN 
BLD - Exterior Lath Insp  7/18/2018 3:29:40 PM  7/19/2018  8 AM - 12 PM  7/19/2018  BEN 
ELE - Rough Electrical  7/18/2018 3:29:49 PM  7/19/2018  8 AM - 12 PM  7/19/2018  BEN 
BLD - Interior Lath  7/18/2018 3:29:57 PM  7/19/2018  8 AM - 12 PM  7/19/2018  BEN 
BLD - Framing Insp.  7/19/2018 2:25:10 PM  7/20/2018  8 AM - 12 PM  7/20/2018  BEN 
BLD - Drywall Inspection  7/19/2018 2:25:16 PM  7/20/2018  8 AM - 12 PM  7/20/2018  BEN 
BLD - Exterior Lath Insp  7/19/2018 2:25:25 PM  7/20/2018  8 AM - 12 PM  7/20/2018  BEN 
BLD - T-Bar (Structural) Insp  7/19/2018 2:25:32 PM  7/20/2018  8 AM - 12 PM  7/20/2018  BEN 
ELE - Rough Electrical  7/19/2018 2:25:41 PM  7/20/2018  8 AM - 12 PM  7/20/2018  BEN 
BLD - Framing Insp.  7/20/2018 2:09:57 PM  7/23/2018  8 AM - 12 PM  7/23/2018  GCT 
BLD - Drywall Inspection  7/20/2018 2:10:04 PM  7/23/2018  8 AM - 12 PM  7/23/2018  GCT 
BLD - Exterior Lath Insp  7/20/2018 2:10:12 PM  7/23/2018  8 AM - 12 PM  7/23/2018  GCT 
ELE - Rough Electrical  7/20/2018 2:10:41 PM  7/23/2018  8 AM - 12 PM  7/23/2018  GCT 
BLD - T-Bar (Structural) Insp  7/20/2018 2:11:02 PM  7/23/2018  8 AM - 12 PM  7/23/2018  GCT 
BLD - Reinforcing Insp  7/20/2018 2:14:55 PM  7/23/2018  8 AM - 12 PM  7/23/2018  GCT 
BLD - Insulation Insp  7/22/2018 4:37:48 PM  7/23/2018  8 AM - 12 PM  7/23/2018  GCT 
BLD - Framing Insp.  7/23/2018 10:58:26 AM  7/24/2018  8 AM - 12 PM  7/24/2018  BEN 
BLD - Drywall Inspection  7/23/2018 10:58:36 AM  7/24/2018  8 AM - 12 PM  7/24/2018  BEN 
BLD - Exterior Lath Insp  7/23/2018 10:58:54 AM  7/24/2018  8 AM - 12 PM  7/24/2018  BEN 
BLD - T-Bar (Structural) Insp  7/23/2018 10:59:01 AM  7/24/2018  8 AM - 12 PM  7/24/2018  BEN 
ELE - Rough Electrical  7/23/2018 10:59:20 AM  7/24/2018  8 AM - 12 PM  7/24/2018  BEN 
BLD - Insulation Insp  7/23/2018 3:00:02 PM  7/24/2018  8 AM - 12 PM  7/24/2018  BEN 
BLD - Framing Insp.  7/24/2018 11:12:18 AM  7/25/2018  8 AM - 12 PM  7/25/2018  BEN 
BLD - Drywall Inspection  7/24/2018 11:12:56 AM  7/25/2018  8 AM - 12 PM  7/25/2018  BEN 
BLD - Exterior Lath Insp  7/24/2018 11:13:03 AM  7/25/2018  8 AM - 12 PM  7/25/2018  BEN 
BLD - Insulation Insp  7/24/2018 11:13:11 AM  7/25/2018  8 AM - 12 PM  7/25/2018  BEN 
ELE - Rough Electrical  7/24/2018 11:13:19 AM  7/25/2018  8 AM - 12 PM  7/25/2018  BEN 
BLD - Framing Insp.  7/25/2018 12:03:26 PM  7/26/2018  12 PM - 3 PM  7/26/2018  BEN 
BLD - Drywall Inspection  7/25/2018 12:03:32 PM  7/26/2018  12 PM - 3 PM  7/26/2018  BEN 
BLD - Exterior Lath Insp  7/25/2018 12:03:37 PM  7/26/2018  12 PM - 3 PM  7/26/2018  BEN 
ELE - Rough Electrical  7/25/2018 12:03:45 PM  7/26/2018  12 PM - 3 PM  7/26/2018  BEN 
BLD - Framing Insp.  7/26/2018 2:35:48 PM  7/27/2018  8 AM - 12 PM  7/27/2018  BEN 
BLD - Drywall Inspection  7/26/2018 2:36:00 PM  7/27/2018  8 AM - 12 PM  7/27/2018  BEN 
BLD - Exterior Lath Insp  7/26/2018 2:36:18 PM  7/27/2018  8 AM - 12 PM  7/27/2018  BEN 
ELE - Rough Electrical  7/26/2018 2:36:28 PM  7/27/2018  8 AM - 12 PM  7/27/2018  BEN 
BLD - Framing Insp.  7/27/2018 1:34:26 PM  7/30/2018    7/30/2018  GCT 
BLD - Drywall Inspection  7/27/2018 1:34:34 PM  7/30/2018    7/30/2018  GCT 
BLD - Exterior Lath Insp  7/27/2018 1:34:47 PM  7/30/2018    7/30/2018  GCT 
ELE - Rough Electrical  7/27/2018 1:34:59 PM  7/30/2018    7/30/2018  GCT 
BLD - Framing Insp.  7/30/2018 1:24:46 PM  7/31/2018  12 PM - 3 PM  7/31/2018  BEN 
BLD - Drywall Inspection  7/30/2018 1:25:43 PM  7/31/2018  12 PM - 3 PM  7/31/2018  BEN 
BLD - Exterior Lath Insp  7/30/2018 1:25:49 PM  7/31/2018  12 PM - 3 PM  7/31/2018  BEN 
ELE - Rough Electrical  7/30/2018 1:26:22 PM  7/31/2018  12 PM - 3 PM  7/31/2018  BEN 
BLD - Framing Insp.  7/31/2018 2:34:43 PM  8/1/2018  8 AM - 12 PM  8/1/2018  BEN 
BLD - Drywall Inspection  7/31/2018 2:34:54 PM  8/1/2018  8 AM - 12 PM  8/1/2018  BEN 
BLD - Exterior Lath Insp  7/31/2018 2:35:07 PM  8/1/2018  8 AM - 12 PM  8/1/2018  BEN 
ELE - Rough Electrical  7/31/2018 2:35:16 PM  8/1/2018  8 AM - 12 PM  8/1/2018  BEN 
BLD - Framing Insp.  8/1/2018 2:24:48 PM  8/2/2018  8 AM - 12 PM  8/2/2018  BEN 
BLD - Drywall Inspection  8/1/2018 2:25:06 PM  8/2/2018  8 AM - 12 PM  8/2/2018  BEN 
BLD - Exterior Lath Insp  8/1/2018 2:25:37 PM  8/2/2018  8 AM - 12 PM  8/2/2018  BEN 
ELE - Rough Electrical  8/1/2018 2:26:23 PM  8/2/2018  8 AM - 12 PM  8/2/2018  BEN 
BLD - Framing Insp.  8/2/2018 1:42:41 PM  8/3/2018  8 AM - 12 PM  8/3/2018  BEN 
BLD - Drywall Inspection  8/2/2018 1:42:47 PM  8/3/2018  8 AM - 12 PM  8/3/2018  BEN 
BLD - Exterior Lath Insp  8/2/2018 1:43:35 PM  8/3/2018  8 AM - 12 PM  8/3/2018  BEN 
ELE - Rough Electrical  8/2/2018 1:43:44 PM  8/3/2018  8 AM - 12 PM  8/3/2018  BEN 
MEC - Rough Mechanical  8/2/2018 1:44:37 PM  8/3/2018  8 AM - 12 PM  8/3/2018  BEN 
BLD - Framing Insp.  8/3/2018 2:49:15 PM  8/6/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD - Drywall Inspection  8/3/2018 2:49:23 PM  8/6/2018  8 AM - 12 PM  8/6/2018  GCT 
BLD - Exterior Lath Insp  8/3/2018 2:49:32 PM  8/6/2018  8 AM - 12 PM  8/6/2018  GCT 
ELE - Rough Electrical  8/3/2018 2:49:40 PM  8/6/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD - Reinforcing Insp  8/3/2018 2:49:50 PM  8/6/2018  8 AM - 12 PM  8/6/2018  GCT 
BLD - Framing Insp.  8/6/2018 12:07:12 PM  8/7/2018  8 AM - 12 PM  8/7/2018  BEN 
BLD - Drywall Inspection  8/6/2018 12:07:21 PM  8/7/2018  8 AM - 12 PM  8/7/2018  BEN 
BLD - Exterior Lath Insp  8/6/2018 12:07:43 PM  8/7/2018  8 AM - 12 PM  8/7/2018  BEN 
ELE - Rough Electrical  8/6/2018 12:07:50 PM  8/7/2018  8 AM - 12 PM  8/7/2018  BEN 
BLD - Drywall Inspection  8/7/2018 1:53:09 PM  8/8/2018  10 AM - 2 PM  8/8/2018  BEN 
BLD - Exterior Lath Insp  8/7/2018 1:54:13 PM  8/8/2018  10 AM - 2 PM  8/8/2018  BEN 
BLD - Framing Insp.  8/7/2018 1:56:17 PM  8/8/2018  10 AM - 2 PM  8/8/2018  BEN 
ELE - Rough Electrical  8/7/2018 1:56:41 PM  8/8/2018  10 AM - 2 PM  8/8/2018  BEN 
BLD - Framing Insp.  8/8/2018 3:34:15 PM  8/9/2018  12 PM - 3 PM  8/9/2018  BEN 
BLD - Drywall Inspection  8/8/2018 3:34:20 PM  8/9/2018  12 PM - 3 PM  8/9/2018  BEN 
BLD - Exterior Lath Insp  8/8/2018 3:34:28 PM  8/9/2018  12 PM - 3 PM  8/9/2018  BEN 
ELE - Rough Electrical  8/8/2018 3:35:02 PM  8/9/2018  12 PM - 3 PM  8/9/2018  BEN 
BLD - Pre-Slab Insp  8/8/2018 3:35:29 PM  8/9/2018  12 PM - 3 PM  8/9/2018  BEN 
BLD - Framing Insp.  8/9/2018 12:13:11 PM  8/10/2018  8 AM - 12 PM  8/10/2018  BEN 
BLD - Drywall Inspection  8/9/2018 12:13:28 PM  8/10/2018  8 AM - 12 PM  8/10/2018  BEN 
BLD - Exterior Lath Insp  8/9/2018 12:13:40 PM  8/10/2018  8 AM - 12 PM  8/10/2018  BEN 
ELE - Rough Electrical  8/9/2018 12:13:49 PM  8/10/2018  8 AM - 12 PM  8/10/2018  BEN 
BLD - Drywall Inspection  8/10/2018 2:23:15 PM  8/13/2018  8 AM - 12 PM  8/13/2018  PJJ 
BLD - Framing Insp.  8/10/2018 2:23:51 PM  8/13/2018  8 AM - 12 PM  8/13/2018  PJJ 
ELE - Rough Electrical  8/10/2018 2:24:02 PM  8/13/2018  8 AM - 12 PM  8/13/2018  PJJ 
BLD - Framing Insp.  8/13/2018 10:02:32 AM  8/14/2018  8 AM - 12 PM  8/14/2018  BEN 
BLD - Drywall Inspection  8/13/2018 10:02:39 AM  8/14/2018  8 AM - 12 PM  8/14/2018  BEN 
ELE - Rough Electrical  8/13/2018 10:02:52 AM  8/14/2018  8 AM - 12 PM  8/14/2018  BEN 
BLD - Exterior Lath Insp  8/13/2018 1:46:01 PM  8/14/2018  8 AM - 12 PM  8/14/2018  BEN 
BLD - Framing Insp.  8/14/2018 2:27:47 PM  8/15/2018  8 AM - 12 PM  8/15/2018  BEN 
BLD - Drywall Inspection  8/14/2018 2:27:53 PM  8/15/2018  8 AM - 12 PM  8/15/2018  BEN 
BLD -Floor Joists/Girders Insp  8/14/2018 2:28:27 PM  8/15/2018  8 AM - 12 PM  8/15/2018  BEN 
BLD - Exterior Lath Insp  8/14/2018 2:28:39 PM  8/15/2018  8 AM - 12 PM  8/15/2018  BEN 
ELE - Rough Electrical  8/14/2018 2:29:36 PM  8/15/2018  8 AM - 12 PM  8/15/2018  BEN 
BLD - Framing Insp.  8/15/2018 11:18:43 AM  8/16/2018  8 AM - 12 PM  8/16/2018  BEN 
BLD - Drywall Inspection  8/15/2018 11:18:49 AM  8/16/2018  8 AM - 12 PM  8/16/2018  BEN 
BLD - Exterior Lath Insp  8/15/2018 11:19:06 AM  8/16/2018  8 AM - 12 PM  8/16/2018  BEN 
ELE - Rough Electrical  8/15/2018 11:19:15 AM  8/16/2018  8 AM - 12 PM  8/16/2018  BEN 
BLD - Framing Insp.  8/16/2018 1:31:25 PM  8/17/2018  8 AM - 12 PM  8/17/2018  BEN 
BLD - Drywall Inspection  8/16/2018 1:31:31 PM  8/17/2018  8 AM - 12 PM  8/17/2018  BEN 
BLD - Exterior Lath Insp  8/16/2018 1:32:06 PM  8/17/2018  8 AM - 12 PM  8/17/2018  BEN 
ELE - Rough Electrical  8/16/2018 1:32:14 PM  8/17/2018  8 AM - 12 PM  8/17/2018  BEN 
BLD - Framing Insp.  8/16/2018 1:46:03 PM  8/20/2018    8/20/2018  PJJ 
BLD - Drywall Inspection  8/16/2018 1:46:11 PM  8/20/2018    8/20/2018  PJJ 
BLD - Exterior Lath Insp  8/16/2018 1:46:18 PM  8/20/2018    8/20/2018  PJJ 
ELE - Rough Electrical  8/16/2018 1:46:31 PM  8/20/2018    8/20/2018  PJJ 
BLD - Framing Insp.  8/20/2018 10:15:34 AM  8/21/2018  12 PM - 3 PM  8/21/2018  BEN 
BLD - Drywall Inspection  8/20/2018 10:15:39 AM  8/21/2018  12 PM - 3 PM  8/21/2018  BEN 
BLD - Exterior Lath Insp  8/20/2018 10:15:58 AM  8/21/2018  12 PM - 3 PM  8/21/2018  BEN 
ELE - Rough Electrical  8/20/2018 10:16:09 AM  8/21/2018  12 PM - 3 PM  8/21/2018  BEN 
BLD - Framing Insp.  8/21/2018 8:30:04 AM  8/22/2018  8 AM - 12 PM  8/22/2018  BEN 
BLD - Drywall Inspection  8/21/2018 8:30:09 AM  8/22/2018  8 AM - 12 PM  8/22/2018  BEN 
BLD - Exterior Lath Insp  8/21/2018 8:30:16 AM  8/22/2018  8 AM - 12 PM  8/22/2018  BEN 
ELE - Rough Electrical  8/21/2018 8:30:24 AM  8/22/2018  8 AM - 12 PM  8/22/2018  BEN 
BLD - Reinforcing Insp  8/21/2018 2:25:05 PM  8/22/2018  8 AM - 12 PM  8/22/2018  BEN 
BLD - Framing Insp.  8/22/2018 7:49:28 AM  8/23/2018  12 PM - 3 PM  8/23/2018  BEN 
BLD - Drywall Inspection  8/22/2018 7:49:34 AM  8/23/2018  12 PM - 3 PM  8/23/2018  BEN 
BLD - Exterior Lath Insp  8/22/2018 7:49:45 AM  8/23/2018  12 PM - 3 PM  8/23/2018  BEN 
ELE - Rough Electrical  8/22/2018 7:49:53 AM  8/23/2018  12 PM - 3 PM  8/23/2018  BEN 
BLD - Reinforcing Insp  8/22/2018 12:22:15 PM  8/23/2018  12 PM - 3 PM  8/23/2018  BEN 
BLD - Framing Insp.  8/23/2018 6:01:41 AM  8/24/2018  8 AM - 12 PM  8/24/2018  BEN 
BLD - Drywall Inspection  8/23/2018 6:01:48 AM  8/24/2018  8 AM - 12 PM  8/24/2018  BEN 
ELE - Rough Electrical  8/23/2018 6:02:16 AM  8/24/2018  8 AM - 12 PM  8/24/2018  BEN 
BLD - Exterior Lath Insp  8/23/2018 6:02:34 AM  8/24/2018  8 AM - 12 PM  8/24/2018  BEN 
BLD - Reinforcing Insp  8/23/2018 6:03:57 AM  8/24/2018  8 AM - 12 PM  8/24/2018  BEN 
BLD - Framing Insp.  8/26/2018 10:58:17 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD - Drywall Inspection  8/26/2018 10:58:30 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD - Exterior Lath Insp  8/26/2018 10:58:44 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD - Penetrations -Fire Rated  8/26/2018 10:59:46 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD - Insulation Insp  8/26/2018 10:59:56 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
ELE - Rough Electrical  8/26/2018 11:00:07 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD -Floor Joists/Girders Insp  8/26/2018 11:00:24 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
PLM - Rough/Topout  8/26/2018 11:20:13 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD - Reinforcing Insp  8/26/2018 11:20:26 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD - T-Bar (Structural) Insp  8/26/2018 11:20:45 AM  8/27/2018  8 AM - 12 PM  8/27/2018  GCT 
BLD - Framing Insp.  8/27/2018 1:50:34 PM  8/28/2018    8/28/2018  GCT 
Route to Struct/Architectual  8/29/2018  9/17/2018    9/4/2018  APPR  CSG 
Apprv. by Struct/Architectural  8/29/2018      9/4/2018 1:52:28 PM  APPR  CSG 
BLD - Exterior Lath Insp  8/29/2018 1:58:12 PM  8/30/2018  8 AM - 12 PM  8/30/2018  BEN 
BLD - Framing Insp.  8/30/2018 1:58:37 PM  8/31/2018  8 AM - 12 PM  8/31/2018  BEN 
ELE - Rough Electrical  8/30/2018 1:58:57 PM  8/31/2018  8 AM - 12 PM  8/31/2018  BEN 
BLD - Exterior Lath Insp  8/31/2018 10:40:19 AM  9/4/2018  8 AM - 12 PM  9/4/2018  PJJ 
BLD - Framing Insp.  9/4/2018 1:19:49 PM  9/5/2018  12 PM - 3 PM  9/5/2018  BEN 
ELE - Rough Electrical  9/4/2018 1:19:57 PM  9/5/2018  12 PM - 3 PM  9/5/2018  BEN 
BLD - Reinforcing Insp  9/5/2018 12:09:02 PM  9/6/2018  8 AM - 12 PM  9/6/2018  BEN 
PLM - Ground/Underfloor water  9/5/2018 12:09:32 PM  9/6/2018  8 AM - 12 PM  9/6/2018  BEN 
BLD - Framing Insp.  9/5/2018 2:27:21 PM  9/6/2018  8 AM - 12 PM  9/6/2018  BEN 
ELE - Rough Electrical  9/5/2018 2:27:56 PM  9/6/2018  8 AM - 12 PM  9/6/2018  BEN 
BLD - Exterior Lath Insp  9/6/2018 1:53:09 PM  9/7/2018  8 AM - 12 PM  9/7/2018  BEN 
BLD - Framing Insp.  9/7/2018 12:33:13 PM  9/10/2018  8 AM - 12 PM  9/10/2018  BEN 
BLD - Drywall Inspection  9/7/2018 12:33:22 PM  9/10/2018  8 AM - 12 PM  9/10/2018  BEN 
ELE - Rough Electrical  9/7/2018 12:33:30 PM  9/10/2018  8 AM - 12 PM  9/10/2018  BEN 
PLM - Ground/Underfloor waste  9/7/2018 12:33:41 PM  9/10/2018  8 AM - 12 PM  9/10/2018  BEN 
BLD - Exterior Lath Insp  9/9/2018 4:10:51 PM  9/10/2018  8 AM - 12 PM  9/10/2018  BEN 
PLM - Rough/Topout  9/9/2018 4:11:49 PM  9/10/2018  8 AM - 12 PM  9/10/2018  BEN 
BLD - Framing Insp.  9/10/2018 2:37:11 PM  9/11/2018  8 AM - 12 PM  9/11/2018  BEN 
ELE - Rough Electrical  9/10/2018 2:37:20 PM  9/11/2018  8 AM - 12 PM  9/11/2018  BEN 
PLM - Ground/Underfloor waste  9/10/2018 2:37:30 PM  9/11/2018  8 AM - 12 PM  9/11/2018  BEN 
BLD - Framing Insp.  9/11/2018 3:34:01 PM  9/12/2018  8 AM - 12 PM  9/12/2018  BEN 
ELE - Rough Electrical  9/11/2018 3:34:30 PM  9/12/2018  8 AM - 12 PM  9/12/2018  BEN 
BLD - Pre-Slab Insp  9/13/2018 1:17:41 PM  9/14/2018  12 PM - 3 PM  9/14/2018  BEN 
BLD - Exterior Lath Insp  9/13/2018 1:17:50 PM  9/14/2018  12 PM - 3 PM  9/14/2018  BEN 
ELE - Underground conduit  9/13/2018 1:18:01 PM  9/14/2018  12 PM - 3 PM  9/14/2018  BEN 
BLD - Framing Insp.  9/13/2018 3:13:00 PM  9/14/2018  12 PM - 3 PM  9/14/2018  BEN 
Route to Planning Zoning  9/14/2018  10/2/2018    9/25/2018  APPR  EYT 
Approved by Planning Zoning  9/14/2018      9/25/2018  DONE  EYT 
Route to Struct/Architectual  9/14/2018  10/2/2018    9/24/2018  APPR  CSG 
Apprv. by Struct/Architectural  9/14/2018      9/24/2018 12:28:41 PM  APPR  CSG 
BLD - Framing Insp.  9/14/2018 12:41:51 PM  9/17/2018  8 AM - 12 PM  9/17/2018  PJJ 
ELE - Rough Electrical  9/14/2018 12:41:59 PM  9/17/2018  8 AM - 12 PM  9/17/2018  PJJ 
BLD - Exterior Lath Insp  9/17/2018 11:07:05 AM  9/18/2018  12 PM - 3 PM  9/18/2018  BEN 
BLD - Framing Insp.  9/17/2018 11:07:17 AM  9/18/2018  12 PM - 3 PM  9/18/2018  BEN 
ELE - Rough Electrical  9/17/2018 2:45:00 PM  9/18/2018  12 PM - 3 PM  9/18/2018  BEN 
BLD -Floor Joists/Girders Insp  9/17/2018 2:45:26 PM  9/18/2018  12 PM - 3 PM  9/18/2018  BEN 
BLD - Pre-Slab Insp  9/18/2018 3:44:43 PM  9/19/2018  12 PM - 3 PM  9/19/2018  BEN 
BLD - Framing Insp.  9/18/2018 3:44:58 PM  9/19/2018  12 PM - 3 PM  9/19/2018  BEN 
ELE - Rough Electrical  9/18/2018 3:45:18 PM  9/19/2018  12 PM - 3 PM  9/19/2018  BEN 
BLD -Floor Joists/Girders Insp  9/18/2018 3:45:44 PM  9/19/2018  12 PM - 3 PM  9/19/2018  BEN 
BLD - Framing Insp.  9/19/2018 2:12:46 PM  9/20/2018  12 PM - 3 PM  9/20/2018  BEN 
BLD - Interior Lath  9/19/2018 2:12:53 PM  9/20/2018  12 PM - 3 PM  9/20/2018  BEN 
ELE - Rough Electrical  9/19/2018 2:13:01 PM  9/20/2018  12 PM - 3 PM  9/20/2018  BEN 
BLD - Framing Insp.  9/20/2018 12:58:25 PM  9/21/2018  8 AM - 12 PM  9/21/2018  BEN 
ELE - Rough Electrical  9/20/2018 12:58:33 PM  9/21/2018  8 AM - 12 PM  9/21/2018  BEN 
Approved Revision Structural  9/20/2018      9/20/2018  APPR  CSG 
Route Revision Structural  9/20/2018  10/8/2018    9/20/2018  APPR  CSG 
BLD - Framing Insp.  9/23/2018 10:17:53 AM  9/24/2018  8 AM - 12 PM  9/24/2018  PJJ 
BLD - Exterior Lath Insp  9/23/2018 10:18:30 AM  9/24/2018  8 AM - 12 PM  9/24/2018  PJJ 
ELE - Rough Electrical  9/23/2018 10:18:45 AM  9/24/2018  8 AM - 12 PM  9/24/2018  PJJ 
BLD - Framing Insp.  9/24/2018 1:59:52 PM  9/25/2018  8 AM - 12 PM  9/25/2018  BEN 
BLD - Exterior Lath Insp  9/24/2018 2:00:02 PM  9/25/2018  8 AM - 12 PM  9/25/2018  BEN 
BLD - Roof Sheathing Insp.  9/24/2018 2:00:14 PM  9/25/2018  8 AM - 12 PM  9/25/2018  BEN 
ELE - Rough Electrical  9/24/2018 2:00:27 PM  9/25/2018  8 AM - 12 PM  9/25/2018  BEN 
BLD - Footings Insp  9/25/2018 12:13:57 PM  9/26/2018  8 AM - 12 PM  9/26/2018  BEN 
BLD - Framing Insp.  9/25/2018 12:14:03 PM  9/26/2018  8 AM - 12 PM  9/26/2018  BEN 
BLD - Exterior Lath Insp  9/25/2018 12:14:10 PM  9/26/2018  8 AM - 12 PM  9/26/2018  BEN 
BLD - Roof Sheathing Insp.  9/25/2018 12:14:15 PM  9/26/2018  8 AM - 12 PM  9/26/2018  BEN 
ELE - Underground conduit  9/25/2018 12:14:25 PM  9/26/2018  8 AM - 12 PM  9/26/2018  BEN 
ELE - Rough Electrical  9/25/2018 12:14:32 PM  9/26/2018  8 AM - 12 PM  9/26/2018  BEN 
MEC - Underground Rough  9/25/2018 12:14:50 PM  9/26/2018  8 AM - 12 PM  9/26/2018  BEN 
PLM - Ground/Underfloor waste  9/25/2018 12:14:57 PM  9/26/2018  8 AM - 12 PM  9/26/2018  BEN 
PLM - Ground/Underfloor water  9/25/2018 12:15:07 PM  9/26/2018  8 AM - 12 PM  9/26/2018  BEN 
BLD - Framing Insp.  9/26/2018 2:17:19 PM  9/27/2018  12 PM - 3 PM  9/27/2018  BEN 
BLD - Roof Sheathing Insp.  9/26/2018 2:17:30 PM  9/27/2018  12 PM - 3 PM  9/27/2018  BEN 
ELE - Rough Electrical  9/26/2018 2:17:38 PM  9/27/2018  12 PM - 3 PM  9/27/2018  BEN 
BLD - Interior Lath  9/26/2018 2:17:54 PM  9/27/2018  12 PM - 3 PM  9/27/2018  BEN 
BLD - Framing Insp.  9/27/2018 2:24:58 PM  9/28/2018  8 AM - 12 PM  9/28/2018  BEN 
BLD - Roof Sheathing Insp.  9/27/2018 2:25:23 PM  9/28/2018  8 AM - 12 PM  9/28/2018  BEN 
BLD - Exterior Lath Insp  9/27/2018 2:25:30 PM  9/28/2018  8 AM - 12 PM  9/28/2018  BEN 
ELE - Rough Electrical  9/27/2018 2:25:43 PM  9/28/2018  8 AM - 12 PM  9/28/2018  BEN 
BLD - Framing Insp.  9/30/2018 8:46:51 AM  10/1/2018  8 AM - 12 PM  10/1/2018  PJJ 
BLD - Drywall Inspection  9/30/2018 8:47:04 AM  10/1/2018  8 AM - 12 PM  10/1/2018  PJJ 
BLD - Exterior Lath Insp  9/30/2018 8:48:26 AM  10/1/2018  8 AM - 12 PM  10/1/2018  PJJ 
ELE - Rough Electrical  9/30/2018 8:48:36 AM  10/1/2018  8 AM - 12 PM  10/1/2018  PJJ 
BLD - Roof Sheathing Insp.  9/30/2018 2:23:27 PM  10/1/2018  8 AM - 12 PM  10/1/2018  PJJ 
BLD - Framing Insp.  10/1/2018 2:51:23 PM  10/2/2018    10/2/2018  GCT 
BLD - Exterior Lath Insp  10/1/2018 2:51:40 PM  10/2/2018    10/2/2018  GCT 
BLD - Interior Lath  10/1/2018 2:51:47 PM  10/2/2018    10/2/2018  GCT 
BLD - Roof Sheathing Insp.  10/1/2018 2:51:55 PM  10/2/2018    10/2/2018  GCT 
ELE - Rough Electrical  10/1/2018 2:52:08 PM  10/2/2018    10/10/2018  GCT 
BLD - Framing Insp.  10/2/2018 3:22:52 PM  10/3/2018  8 AM - 12 PM  10/3/2018  PJJ 
BLD - Drywall Inspection  10/2/2018 3:23:52 PM  10/3/2018  8 AM - 12 PM  10/3/2018  PJJ 
BLD - Roof Sheathing Insp.  10/2/2018 3:24:08 PM  10/3/2018  8 AM - 12 PM  10/3/2018  PJJ 
ELE - Rough Electrical  10/2/2018 3:24:37 PM  10/3/2018  8 AM - 12 PM  10/3/2018  PJJ 
BLD - Interior Lath  10/2/2018 3:25:00 PM  10/3/2018  8 AM - 12 PM  10/3/2018  PJJ 
BLD - Roof Sheathing Insp.  10/3/2018 2:50:41 PM  10/4/2018  8 AM - 12 PM  10/4/2018  BEN 
BLD - Framing Insp.  10/3/2018 2:50:57 PM  10/4/2018  8 AM - 12 PM  10/4/2018  BEN 
ELE - Rough Electrical  10/3/2018 2:51:11 PM  10/4/2018  8 AM - 12 PM  10/4/2018  BEN 
BLD - Framing Insp.  10/4/2018 11:01:53 AM  10/5/2018  8 AM - 12 PM  10/5/2018  BEN 
BLD - Roof Sheathing Insp.  10/4/2018 11:02:01 AM  10/5/2018  8 AM - 12 PM  10/5/2018  BEN 
ELE - Rough Electrical  10/4/2018 11:02:12 AM  10/5/2018  8 AM - 12 PM  10/5/2018  BEN 
BLD -Floor Joists/Girders Insp  10/4/2018 2:28:25 PM  10/5/2018  8 AM - 12 PM  10/5/2018  BEN 
BLD - Framing Insp.  10/5/2018 10:06:16 AM  10/8/2018  8 AM - 12 PM  10/8/2018  PJJ 
BLD - Drywall Inspection  10/5/2018 10:06:23 AM  10/8/2018  8 AM - 12 PM  10/8/2018  PJJ 
BLD - Exterior Lath Insp  10/5/2018 10:06:31 AM  10/8/2018  8 AM - 12 PM  10/8/2018  PJJ 
ELE - Rough Electrical  10/5/2018 10:06:40 AM  10/8/2018  8 AM - 12 PM  10/8/2018  PJJ 
BLD - Roof Sheathing Insp.  10/5/2018 10:07:56 AM  10/8/2018  8 AM - 12 PM  10/8/2018  PJJ 
BLD - Framing Insp.  10/8/2018 1:43:13 PM  10/9/2018  8 AM - 12 PM  10/9/2018  BEN 
BLD - Exterior Lath Insp  10/8/2018 1:43:24 PM  10/9/2018  8 AM - 12 PM  10/9/2018  BEN 
BLD - Roof Sheathing Insp.  10/8/2018 1:43:38 PM  10/9/2018  8 AM - 12 PM  10/9/2018  BEN 
ELE - Rough Electrical  10/8/2018 1:43:49 PM  10/9/2018  8 AM - 12 PM  10/9/2018  BEN 
BLD - Framing Insp.  10/9/2018 2:08:26 PM  10/10/2018  8 AM - 12 PM  10/10/2018  BEN 
ELE - Rough Electrical  10/9/2018 2:08:34 PM  10/10/2018  8 AM - 12 PM  10/10/2018  BEN 
BLD - Framing Insp.  10/10/2018 2:32:26 PM  10/11/2018  12 PM - 3 PM  10/11/2018  BEN 
ELE - Rough Electrical  10/10/2018 2:32:35 PM  10/11/2018  12 PM - 3 PM  10/11/2018  BEN 
BLD - Framing Insp.  10/11/2018 11:40:58 AM  10/12/2018  8 AM - 12 PM  10/12/2018  BEN 
ELE - Rough Electrical  10/11/2018 11:41:10 AM  10/12/2018  8 AM - 12 PM  10/12/2018  BEN 
BLD - Roof Sheathing Insp.  10/11/2018 12:39:31 PM  10/12/2018  8 AM - 12 PM  10/12/2018  BEN 
BLD - Reinforcing Insp  10/14/2018 3:10:43 PM  10/15/2018  8 AM - 12 PM  10/15/2018  PJJ 
BLD - Framing Insp.  10/14/2018 3:10:54 PM  10/15/2018  8 AM - 12 PM  10/15/2018  PJJ 
BLD - Drywall Inspection  10/14/2018 3:11:05 PM  10/15/2018  8 AM - 12 PM  10/15/2018  PJJ 
BLD - Exterior Lath Insp  10/14/2018 3:11:17 PM  10/15/2018  8 AM - 12 PM  10/15/2018  PJJ 
BLD - Roof Sheathing Insp.  10/14/2018 3:11:29 PM  10/15/2018  8 AM - 12 PM  10/15/2018  PJJ 
ELE - Rough Electrical  10/14/2018 3:11:48 PM  10/15/2018  8 AM - 12 PM  10/15/2018  PJJ 
BLD - Framing Insp.  10/15/2018 1:59:49 PM  10/16/2018  8 AM - 12 PM  10/16/2018  BEN 
BLD - Exterior Lath Insp  10/15/2018 1:59:55 PM  10/16/2018  8 AM - 12 PM  10/16/2018  BEN 
BLD - Roof Sheathing Insp.  10/15/2018 2:00:05 PM  10/16/2018  8 AM - 12 PM  10/16/2018  BEN 
ELE - Rough Electrical  10/15/2018 2:00:16 PM  10/16/2018  8 AM - 12 PM  10/16/2018  BEN 
BLD - Framing Insp.  10/16/2018 11:44:40 AM  10/17/2018  8 AM - 12 PM  10/17/2018  BEN 
BLD - Exterior Lath Insp  10/16/2018 11:44:48 AM  10/17/2018  8 AM - 12 PM  10/17/2018  BEN 
ELE - Rough Electrical  10/16/2018 11:44:58 AM  10/17/2018  8 AM - 12 PM  10/17/2018  BEN 
BLD - Drywall Inspection  10/16/2018 11:45:05 AM  10/17/2018  8 AM - 12 PM  10/17/2018  BEN 
BLD - Framing Insp.  10/17/2018 1:14:15 PM  10/18/2018  12 PM - 3 PM  10/18/2018  BEN 
BLD - Drywall Inspection  10/17/2018 1:14:23 PM  10/18/2018  12 PM - 3 PM  10/18/2018  BEN 
BLD - Exterior Lath Insp  10/17/2018 1:14:27 PM  10/18/2018  12 PM - 3 PM  10/18/2018  BEN 
ELE - Rough Electrical  10/17/2018 1:14:35 PM  10/18/2018  12 PM - 3 PM  10/18/2018  BEN 
BLD - Framing Insp.  10/18/2018 10:39:50 AM  10/19/2018  8 AM - 12 PM  10/19/2018  BEN 
BLD - Drywall Inspection  10/18/2018 10:39:57 AM  10/19/2018  8 AM - 12 PM  10/19/2018  BEN 
BLD - Exterior Lath Insp  10/18/2018 10:40:05 AM  10/19/2018  8 AM - 12 PM  10/19/2018  BEN 
ELE - Rough Electrical  10/18/2018 10:40:16 AM  10/19/2018  8 AM - 12 PM  10/19/2018  BEN 
BLD - Framing Insp.  10/19/2018 1:50:34 PM  10/22/2018  8 AM - 12 PM  10/22/2018  PJJ 
BLD - Drywall Inspection  10/19/2018 1:50:45 PM  10/22/2018  8 AM - 12 PM  10/22/2018  PJJ 
BLD - Exterior Lath Insp  10/19/2018 1:50:51 PM  10/22/2018  8 AM - 12 PM  10/22/2018  PJJ 
ELE - Rough Electrical  10/19/2018 1:51:31 PM  10/22/2018  8 AM - 12 PM  10/22/2018  PJJ 
BLD - Framing Insp.  10/22/2018 12:49:24 PM  10/23/2018  8 AM - 12 PM  10/23/2018  BEN 
BLD - Drywall Inspection  10/22/2018 12:49:30 PM  10/23/2018  8 AM - 12 PM  10/23/2018  BEN 
BLD - Exterior Lath Insp  10/22/2018 12:49:34 PM  10/23/2018  8 AM - 12 PM  10/23/2018  BEN 
ELE - Rough Electrical  10/22/2018 12:49:43 PM  10/23/2018  8 AM - 12 PM  10/23/2018  BEN 
BLD - Framing Insp.  10/23/2018 2:25:25 PM  10/24/2018  12 PM - 3 PM  10/24/2018  BEN 
BLD - Drywall Inspection  10/23/2018 2:25:30 PM  10/24/2018  12 PM - 3 PM  10/24/2018  BEN 
BLD - Exterior Lath Insp  10/23/2018 2:25:36 PM  10/24/2018  12 PM - 3 PM  10/24/2018  BEN 
ELE - Rough Electrical  10/23/2018 2:25:44 PM  10/24/2018  12 PM - 3 PM  10/24/2018  BEN 
BLD - Framing Insp.  10/24/2018 1:45:07 PM  10/25/2018  12 PM - 3 PM  10/25/2018  BEN 
BLD - Drywall Inspection  10/24/2018 1:45:13 PM  10/25/2018  12 PM - 3 PM  10/25/2018  BEN 
BLD - Exterior Lath Insp  10/24/2018 1:45:21 PM  10/25/2018  12 PM - 3 PM  10/25/2018  BEN 
ELE - Rough Electrical  10/24/2018 1:45:32 PM  10/25/2018  12 PM - 3 PM  10/25/2018  BEN 
BLD - Framing Insp.  10/25/2018 1:33:52 PM  10/26/2018  12 PM - 3 PM  10/26/2018  BEN 
BLD - Drywall Inspection  10/25/2018 1:34:00 PM  10/26/2018  12 PM - 3 PM  10/26/2018  BEN 
BLD - Exterior Lath Insp  10/25/2018 1:34:07 PM  10/26/2018  12 PM - 3 PM  10/26/2018  BEN 
ELE - Rough Electrical  10/25/2018 1:34:13 PM  10/26/2018  12 PM - 3 PM  10/26/2018  BEN 
ELE - Rough Electrical  10/25/2018  10/27/2018    10/30/2018  BEN 
ELE - Rough Electrical  10/25/2018  10/30/2018  8 AM - 12 PM  10/30/2018  BEN 
BLD - Framing Insp.  10/26/2018 10:40:54 AM  10/29/2018  8 AM - 12 PM  10/29/2018  PJJ 
BLD - Drywall Inspection  10/26/2018 10:40:59 AM  10/29/2018  8 AM - 12 PM  10/29/2018  PJJ 
BLD - Exterior Lath Insp  10/26/2018 10:41:05 AM  10/29/2018  8 AM - 12 PM  10/29/2018  PJJ 
ELE - Rough Electrical  10/26/2018 10:41:19 AM  10/29/2018  8 AM - 12 PM  10/29/2018  PJJ 
BLD - T-Bar (Structural) Insp  10/26/2018 10:41:37 AM  10/29/2018  8 AM - 12 PM  10/29/2018  PJJ 
BLD - Framing Insp.  10/29/2018 1:46:15 PM  10/30/2018  8 AM - 12 PM  10/30/2018  BEN 
BLD - Drywall Inspection  10/29/2018 1:46:22 PM  10/30/2018  8 AM - 12 PM  10/30/2018  BEN 
BLD - Exterior Lath Insp  10/29/2018 1:46:32 PM  10/30/2018  8 AM - 12 PM  10/30/2018  BEN 
BLD - T-Bar (Structural) Insp  10/29/2018 1:46:38 PM  10/30/2018  8 AM - 12 PM  10/30/2018  BEN 
BLD -Floor Joists/Girders Insp  10/29/2018 1:46:59 PM  10/30/2018  8 AM - 12 PM  10/30/2018  BEN 
BLD - Roof Sheathing Insp.  10/29/2018 2:16:29 PM  10/30/2018  8 AM - 12 PM  10/30/2018  BEN 
BLD - Roof Sheathing Insp.  10/30/2018 12:59:14 PM  10/31/2018  8 AM - 12 PM  10/31/2018  BEN 
ELE - Rough Electrical  10/30/2018 12:59:42 PM  10/31/2018  8 AM - 12 PM  10/31/2018  BEN 
BLD - T-Bar (Structural) Insp  10/30/2018 12:59:52 PM  10/31/2018  8 AM - 12 PM  10/31/2018  BEN 
BLD - Framing Insp.  10/31/2018 1:35:42 PM  11/1/2018  12 PM - 3 PM  11/1/2018  BEN 
BLD - Drywall Inspection  10/31/2018 1:35:48 PM  11/1/2018  12 PM - 3 PM  11/1/2018  BEN 
BLD - Exterior Lath Insp  10/31/2018 1:35:53 PM  11/1/2018  12 PM - 3 PM  11/1/2018  BEN 
ELE - Rough Electrical  10/31/2018 1:36:01 PM  11/1/2018  12 PM - 3 PM  11/1/2018  BEN 
BLD - Framing Insp.  11/1/2018 10:03:50 AM  11/2/2018  12 PM - 3 PM  11/2/2018  BEN 
BLD - Drywall Inspection  11/1/2018 10:03:56 AM  11/2/2018  12 PM - 3 PM  11/2/2018  BEN 
BLD - Exterior Lath Insp  11/1/2018 10:04:01 AM  11/2/2018  12 PM - 3 PM  11/2/2018  BEN 
ELE - Rough Electrical  11/1/2018 10:04:08 AM  11/2/2018  12 PM - 3 PM  11/2/2018  BEN 
BLD - Framing Insp.  11/4/2018 1:00:51 PM  11/5/2018  8 AM - 12 PM  11/5/2018  PJJ 
BLD - Drywall Inspection  11/4/2018 1:01:04 PM  11/5/2018  8 AM - 12 PM  11/5/2018  PJJ 
BLD - Exterior Lath Insp  11/4/2018 1:01:12 PM  11/5/2018  8 AM - 12 PM  11/5/2018  PJJ 
ELE - Rough Electrical  11/4/2018 1:01:23 PM  11/5/2018  8 AM - 12 PM  11/5/2018  PJJ 
MEC - Rough Mechanical  11/4/2018 1:01:44 PM  11/5/2018  8 AM - 12 PM  11/5/2018  PJJ 
BLD - Framing Insp.  11/5/2018 1:34:00 PM  11/6/2018  12 PM - 3 PM  11/6/2018  BEN 
BLD - Drywall Inspection  11/5/2018 1:34:08 PM  11/6/2018  12 PM - 3 PM  11/6/2018  BEN 
BLD - Exterior Lath Insp  11/5/2018 1:34:15 PM  11/6/2018  12 PM - 3 PM  11/6/2018  BEN 
ELE - Rough Electrical  11/5/2018 1:34:46 PM  11/6/2018  12 PM - 3 PM  11/6/2018  BEN 
BLD - Framing Insp.  11/6/2018 2:19:34 PM  11/7/2018    11/7/2018  PJJ 
BLD - Drywall Inspection  11/6/2018 2:19:40 PM  11/7/2018    11/7/2018  PJJ 
BLD - Exterior Lath Insp  11/6/2018 2:19:46 PM  11/7/2018    11/7/2018  PJJ 
ELE - Rough Electrical  11/6/2018 2:19:55 PM  11/7/2018    11/7/2018  PJJ 
BLD - Framing Insp.  11/7/2018 1:59:11 PM  11/8/2018  8 AM - 12 PM  11/8/2018  PJJ 
BLD - Drywall Inspection  11/7/2018 1:59:18 PM  11/8/2018  8 AM - 12 PM  11/8/2018  PJJ 
BLD - Exterior Lath Insp  11/7/2018 1:59:23 PM  11/8/2018  8 AM - 12 PM  11/8/2018  PJJ 
ELE - Rough Electrical  11/7/2018 1:59:31 PM  11/8/2018  8 AM - 12 PM  11/8/2018  PJJ 
BLD - Framing Insp.  11/8/2018 10:17:03 AM  11/9/2018  12 PM - 3 PM  11/9/2018  BEN 
BLD - Drywall Inspection  11/8/2018 10:17:09 AM  11/9/2018  12 PM - 3 PM  11/9/2018  BEN 
BLD - Exterior Lath Insp  11/8/2018 10:17:15 AM  11/9/2018  12 PM - 3 PM  11/9/2018  BEN 
ELE - Rough Electrical  11/8/2018 10:17:22 AM  11/9/2018  12 PM - 3 PM  11/9/2018  BEN 
BLD - Framing Insp.  11/9/2018 10:06:33 AM  11/13/2018  8 AM - 12 PM  11/13/2018  PJJ 
BLD - Drywall Inspection  11/9/2018 10:06:38 AM  11/13/2018  8 AM - 12 PM  11/13/2018  PJJ 
BLD - Exterior Lath Insp  11/9/2018 10:06:43 AM  11/13/2018  8 AM - 12 PM  11/13/2018  PJJ 
ELE - Rough Electrical  11/9/2018 10:06:50 AM  11/13/2018  8 AM - 12 PM  11/13/2018  PJJ 
BLD - Framing Insp.  11/13/2018 12:12:17 PM  11/14/2018  12 PM - 3 PM  11/14/2018  BEN 
BLD - Drywall Inspection  11/13/2018 12:12:28 PM  11/14/2018  12 PM - 3 PM  11/14/2018  BEN 
BLD - Exterior Lath Insp  11/13/2018 12:12:35 PM  11/14/2018  12 PM - 3 PM  11/14/2018  BEN 
ELE - Rough Electrical  11/13/2018 12:12:42 PM  11/14/2018  12 PM - 3 PM  11/14/2018  BEN 
BLD - Footings Insp  11/14/2018 3:01:44 PM  11/15/2018  8 AM - 12 PM  11/15/2018  BEN 
BLD - Drywall Inspection  11/14/2018 3:01:55 PM  11/15/2018  8 AM - 12 PM  11/15/2018  BEN 
BLD - Exterior Lath Insp  11/14/2018 3:02:06 PM  11/15/2018  8 AM - 12 PM  11/15/2018  BEN 
ELE - Rough Electrical  11/14/2018 3:02:15 PM  11/15/2018  8 AM - 12 PM  11/15/2018  BEN 
BLD - Framing Insp.  11/15/2018 1:33:33 PM  11/16/2018  12 PM - 3 PM  11/16/2018  BEN 
BLD - Drywall Inspection  11/15/2018 1:35:00 PM  11/16/2018  12 PM - 3 PM  11/16/2018  BEN 
BLD - Exterior Lath Insp  11/15/2018 1:35:05 PM  11/16/2018  12 PM - 3 PM  11/16/2018  BEN 
ELE - Rough Electrical  11/15/2018 1:35:11 PM  11/16/2018  12 PM - 3 PM  11/16/2018  BEN 
BLD - Framing Insp.  11/16/2018 11:22:30 AM  11/19/2018  10 AM - 2 PM  11/19/2018  GCT 
BLD - Drywall Inspection  11/16/2018 11:22:36 AM  11/19/2018  10 AM - 2 PM  11/19/2018  GCT 
BLD - Exterior Lath Insp  11/16/2018 11:22:42 AM  11/19/2018  10 AM - 2 PM  11/19/2018  GCT 
ELE - Rough Electrical  11/16/2018 11:22:51 AM  11/19/2018  10 AM - 2 PM  11/19/2018  GCT 
BLD - Framing Insp.  11/19/2018 11:20:16 AM  11/20/2018  8 AM - 12 PM  11/20/2018  BEN 
BLD - Drywall Inspection  11/19/2018 11:20:23 AM  11/20/2018  8 AM - 12 PM  11/20/2018  BEN 
BLD - Exterior Lath Insp  11/19/2018 11:20:34 AM  11/20/2018  8 AM - 12 PM  11/20/2018  BEN 
ELE - Rough Electrical  11/19/2018 11:20:47 AM  11/20/2018  8 AM - 12 PM  11/20/2018  BEN 
BLD - Framing Insp.  11/20/2018 6:00:35 AM  11/21/2018  8 AM - 12 PM  11/21/2018  BEN 
BLD - Drywall Inspection  11/20/2018 6:00:42 AM  11/21/2018  8 AM - 12 PM  11/21/2018  BEN 
BLD - Exterior Lath Insp  11/20/2018 6:00:49 AM  11/21/2018  8 AM - 12 PM  11/21/2018  BEN 
ELE - Rough Electrical  11/20/2018 6:00:56 AM  11/21/2018  8 AM - 12 PM  11/21/2018  BEN 
BLD - Framing Insp.  11/21/2018 6:10:46 AM  11/26/2018  8 AM - 12 PM  11/26/2018  PJJ 
BLD - Drywall Inspection  11/21/2018 6:10:51 AM  11/26/2018  8 AM - 12 PM  11/26/2018  PJJ 
BLD - Exterior Lath Insp  11/21/2018 6:10:57 AM  11/26/2018  8 AM - 12 PM  11/26/2018  PJJ 
ELE - Rough Electrical  11/21/2018 6:11:06 AM  11/26/2018  8 AM - 12 PM  11/26/2018  PJJ 
BLD - Framing Insp.  11/26/2018 12:30:32 PM  11/27/2018  12 PM - 3 PM  11/27/2018  BEN 
BLD - Drywall Inspection  11/26/2018 12:30:39 PM  11/27/2018  12 PM - 3 PM  11/27/2018  BEN 
BLD - Exterior Lath Insp  11/26/2018 12:30:46 PM  11/27/2018  12 PM - 3 PM  11/27/2018  BEN 
ELE - Rough Electrical  11/26/2018 12:30:53 PM  11/27/2018  12 PM - 3 PM  11/27/2018  BEN 
BLD - Framing Insp.  11/27/2018 11:18:57 AM  11/28/2018  8 AM - 12 PM  11/28/2018  BEN 
BLD - Drywall Inspection  11/27/2018 11:19:03 AM  11/28/2018  8 AM - 12 PM  11/28/2018  BEN 
BLD - Exterior Lath Insp  11/27/2018 11:19:13 AM  11/28/2018  8 AM - 12 PM  11/28/2018  BEN 
ELE - Rough Electrical  11/27/2018 11:19:22 AM  11/28/2018  8 AM - 12 PM  11/28/2018  BEN 
BLD - Framing Insp.  11/28/2018 11:35:20 AM  11/29/2018  12 PM - 3 PM  11/29/2018  BEN 
BLD - Drywall Inspection  11/28/2018 11:35:26 AM  11/29/2018  12 PM - 3 PM  11/29/2018  BEN 
BLD - Exterior Lath Insp  11/28/2018 11:35:33 AM  11/29/2018  12 PM - 3 PM  11/29/2018  BEN 
ELE - Rough Electrical  11/28/2018 11:35:44 AM  11/29/2018  12 PM - 3 PM  11/29/2018  BEN 
MEC - Rough Duct  11/28/2018 2:29:57 PM  11/29/2018  12 PM - 3 PM  11/29/2018  BEN 
BLD - Framing Insp.  11/29/2018 12:16:38 PM  11/30/2018  8 AM - 12 PM  11/30/2018  BEN 
BLD - Drywall Inspection  11/29/2018 12:16:43 PM  11/30/2018  8 AM - 12 PM  11/30/2018  BEN 
BLD - Exterior Lath Insp  11/29/2018 12:16:48 PM  11/30/2018  8 AM - 12 PM  11/30/2018  BEN 
ELE - Rough Electrical  11/29/2018 12:16:57 PM  11/30/2018  8 AM - 12 PM  11/30/2018  BEN 
MEC - Rough Duct  11/29/2018 12:17:08 PM  11/30/2018  8 AM - 12 PM  11/30/2018  BEN 
BLD - Framing Insp.  11/30/2018 11:31:10 AM  12/3/2018  8 AM - 12 PM  12/3/2018  PJJ 
BLD - Drywall Inspection  11/30/2018 11:31:15 AM  12/3/2018  8 AM - 12 PM  12/3/2018  PJJ 
BLD - Exterior Lath Insp  11/30/2018 11:31:20 AM  12/3/2018  8 AM - 12 PM  12/3/2018  PJJ 
ELE - Rough Electrical  11/30/2018 11:31:31 AM  12/3/2018  8 AM - 12 PM  12/3/2018  PJJ 
MEC - Rough Duct  11/30/2018 11:31:38 AM  12/3/2018  8 AM - 12 PM  12/3/2018  PJJ 
BLD - Framing Insp.  12/3/2018 12:03:03 PM  12/4/2018  8 AM - 12 PM  12/4/2018  PJJ 
BLD - Drywall Inspection  12/3/2018 12:03:08 PM  12/4/2018  8 AM - 12 PM  12/4/2018  PJJ 
BLD - Exterior Lath Insp  12/3/2018 12:03:15 PM  12/4/2018  8 AM - 12 PM  12/4/2018  PJJ 
ELE - Rough Electrical  12/3/2018 12:03:22 PM  12/4/2018  8 AM - 12 PM  12/4/2018  PJJ 
MEC - Rough Duct  12/3/2018 12:03:33 PM  12/4/2018  8 AM - 12 PM  12/4/2018  PJJ 
BLD - Framing Insp.  12/4/2018 2:13:48 PM  12/5/2018  8 AM - 12 PM  12/5/2018  BEN 
BLD - Drywall Inspection  12/4/2018 2:13:54 PM  12/5/2018  8 AM - 12 PM  12/5/2018  BEN 
BLD - Exterior Lath Insp  12/4/2018 2:14:02 PM  12/5/2018  8 AM - 12 PM  12/5/2018  BEN 
ELE - Rough Electrical  12/4/2018 2:14:11 PM  12/5/2018  8 AM - 12 PM  12/5/2018  BEN 
BLD - Framing Insp.  12/5/2018 2:27:18 PM  12/6/2018  8 AM - 12 PM  12/6/2018  BEN 
BLD - Drywall Inspection  12/5/2018 2:27:23 PM  12/6/2018  8 AM - 12 PM  12/6/2018  BEN 
BLD - Exterior Lath Insp  12/5/2018 2:29:31 PM  12/6/2018  8 AM - 12 PM  12/6/2018  BEN 
ELE - Rough Electrical  12/5/2018 2:29:43 PM  12/6/2018  8 AM - 12 PM  12/6/2018  BEN 
BLD - Framing Insp.  12/6/2018 1:13:58 PM  12/7/2018  8 AM - 12 PM  12/7/2018  BEN 
BLD - Drywall Inspection  12/6/2018 1:14:08 PM  12/7/2018  8 AM - 12 PM  12/7/2018  BEN 
BLD - Exterior Lath Insp  12/6/2018 1:14:14 PM  12/7/2018  8 AM - 12 PM  12/7/2018  BEN 
ELE - Rough Electrical  12/6/2018 1:14:24 PM  12/7/2018  8 AM - 12 PM  12/7/2018  BEN 
BLD - Framing Insp.  12/9/2018 2:18:43 PM  12/10/2018  8 AM - 12 PM  12/10/2018  PJJ 
BLD - Drywall Inspection  12/9/2018 2:18:55 PM  12/10/2018  8 AM - 12 PM  12/10/2018  PJJ 
BLD - Exterior Lath Insp  12/9/2018 2:19:20 PM  12/10/2018  8 AM - 12 PM  12/10/2018  PJJ 
ELE - Penetrations- Fire Rated  12/9/2018 2:19:36 PM  12/10/2018  8 AM - 12 PM  12/10/2018  PJJ 
BLD - Framing Insp.  12/14/2018 9:59:05 AM  12/17/2018  10 AM - 2 PM  12/17/2018  JOS 
BLD - Exterior Lath Insp  12/14/2018 9:59:11 AM  12/17/2018  10 AM - 2 PM  12/17/2018  JOS 
BLD - Drywall Inspection  12/14/2018 9:59:18 AM  12/17/2018  10 AM - 2 PM  12/17/2018  JOS 
ELE - Rough Electrical  12/14/2018 9:59:26 AM  12/17/2018  10 AM - 2 PM  12/17/2018  JOS 
BLD - T-Bar (Structural) Insp  12/16/2018 3:34:23 PM  12/17/2018  10 AM - 2 PM  12/17/2018  JOS 
BLD - T-Bar (Structural) Insp  12/17/2018 11:48:46 AM  12/18/2018    12/19/2018  PJJ 
ELE - Rough Electrical  12/17/2018 11:48:55 AM  12/18/2018    12/19/2018  PJJ 
BLD - Framing Insp.  12/17/2018 11:49:04 AM  12/18/2018    12/19/2018  PJJ 
MEC - Rough Duct  12/17/2018 12:50:33 PM  12/18/2018  12 PM - 3 PM  12/19/2018  PJJ 
MEC - Rough Mechanical  12/17/2018 12:50:42 PM  12/18/2018  12 PM - 3 PM  12/19/2018  PJJ 
BLD - T-Bar (Structural) Insp  12/18/2018 10:20:16 AM  12/19/2018  8 AM - 12 PM  12/19/2018  PJJ 
MEC - Rough Duct  12/18/2018 10:20:25 AM  12/19/2018  8 AM - 12 PM  12/19/2018  PJJ 
MEC - Rough Mechanical  12/18/2018 10:20:32 AM  12/19/2018  8 AM - 12 PM  12/19/2018  PJJ 
BLD - Framing Insp.  12/19/2018 11:12:21 AM  12/20/2018  8 AM - 12 PM  12/20/2018  BEN 
BLD - Exterior Lath Insp  12/19/2018 11:12:26 AM  12/20/2018  8 AM - 12 PM  12/20/2018  BEN 
ELE - Rough Electrical  12/19/2018 11:12:40 AM  12/20/2018  8 AM - 12 PM  12/20/2018  BEN 
BLD - Roof Sheathing Insp.  12/19/2018 11:13:09 AM  12/20/2018  8 AM - 12 PM  12/20/2018  BEN 
BLD - Drywall Inspection  12/19/2018 11:19:06 AM  12/20/2018  8 AM - 12 PM  12/20/2018  BEN 
BLD - Framing Insp.  12/20/2018 2:08:29 PM  12/21/2018  8 AM - 12 PM  12/21/2018  BEN 
BLD - Drywall Inspection  12/20/2018 2:08:35 PM  12/21/2018  8 AM - 12 PM  12/21/2018  BEN 
BLD - Exterior Lath Insp  12/20/2018 2:08:40 PM  12/21/2018  8 AM - 12 PM  12/21/2018  BEN 
BLD - Roof Sheathing Insp.  12/20/2018 2:08:46 PM  12/21/2018  8 AM - 12 PM  12/21/2018  BEN 
ELE - Rough Electrical  12/20/2018 2:08:54 PM  12/21/2018  8 AM - 12 PM  12/21/2018  BEN 
BLD - Framing Insp.  12/21/2018 10:31:13 AM  12/24/2018  8 AM - 12 PM  12/24/2018  PJJ 
BLD - Drywall Inspection  12/21/2018 10:31:20 AM  12/24/2018  8 AM - 12 PM  12/24/2018  PJJ 
BLD - Exterior Lath Insp  12/21/2018 10:31:27 AM  12/24/2018  8 AM - 12 PM  12/24/2018  PJJ 
ELE - Rough Electrical  12/21/2018 10:31:34 AM  12/24/2018  8 AM - 12 PM  12/24/2018  PJJ 
BLD - Framing Insp.  12/25/2018 5:19:53 AM  12/26/2018  8 AM - 12 PM  12/26/2018  PJJ 
BLD - Drywall Inspection  12/25/2018 5:20:05 AM  12/26/2018  8 AM - 12 PM  12/26/2018  PJJ 
BLD - Exterior Lath Insp  12/25/2018 5:20:21 AM  12/26/2018  8 AM - 12 PM  12/26/2018  PJJ 
ELE - Rough Electrical  12/25/2018 5:20:38 AM  12/26/2018  8 AM - 12 PM  12/26/2018  PJJ 
BLD - Framing Insp.  1/2/2019 1:35:33 PM  1/3/2019  12 PM - 3 PM  1/3/2019  BEN 
BLD - Drywall Inspection  1/2/2019 1:35:38 PM  1/3/2019  12 PM - 3 PM  1/3/2019  BEN 
BLD - Exterior Lath Insp  1/2/2019 1:35:46 PM  1/3/2019  12 PM - 3 PM  1/3/2019  BEN 
ELE - Rough Electrical  1/2/2019 1:35:59 PM  1/3/2019  12 PM - 3 PM  1/3/2019  BEN 
BLD - Framing Insp.  1/3/2019 1:32:24 PM  1/4/2019  10 AM - 2 PM  1/4/2019  BEN 
BLD - Drywall Inspection  1/3/2019 1:32:30 PM  1/4/2019  10 AM - 2 PM  1/4/2019  BEN 
BLD - Exterior Lath Insp  1/3/2019 1:32:36 PM  1/4/2019  10 AM - 2 PM  1/4/2019  BEN 
ELE - Rough Electrical  1/3/2019 1:32:48 PM  1/4/2019  10 AM - 2 PM  1/4/2019  BEN 
MEC - Rough Duct  1/3/2019 1:33:05 PM  1/4/2019  10 AM - 2 PM  1/4/2019  BEN 
MEC - Rough Mechanical  1/3/2019 1:33:15 PM  1/4/2019  10 AM - 2 PM  1/4/2019  BEN 
BLD - Framing Insp.  1/4/2019 1:40:07 PM  1/7/2019  10 AM - 2 PM  1/7/2019  PJJ 
BLD - Drywall Inspection  1/4/2019 1:40:12 PM  1/7/2019  10 AM - 2 PM  1/7/2019  PJJ 
BLD - Exterior Lath Insp  1/4/2019 1:40:17 PM  1/7/2019  10 AM - 2 PM  1/7/2019  PJJ 
ELE - Rough Electrical  1/4/2019 1:40:28 PM  1/7/2019  10 AM - 2 PM  1/7/2019  PJJ 
MEC - Rough Duct  1/4/2019 1:41:10 PM  1/7/2019  10 AM - 2 PM  1/7/2019  PJJ 
MEC - Rough Mechanical  1/4/2019 1:41:18 PM  1/7/2019  10 AM - 2 PM  1/7/2019  PJJ 
BLD - Framing Insp.  1/7/2019 1:01:32 PM  1/8/2019  12 PM - 3 PM  1/8/2019  BEN 
BLD - Drywall Inspection  1/7/2019 1:01:37 PM  1/8/2019  12 PM - 3 PM  1/8/2019  BEN 
BLD - Exterior Lath Insp  1/7/2019 1:01:52 PM  1/8/2019  12 PM - 3 PM  1/8/2019  BEN 
ELE - Rough Electrical  1/7/2019 1:02:01 PM  1/8/2019  12 PM - 3 PM  1/8/2019  BEN 
MEC - Rough Mechanical  1/7/2019 1:02:09 PM  1/8/2019  12 PM - 3 PM  1/8/2019  BEN 
MEC - Rough Duct  1/7/2019 1:02:19 PM  1/8/2019  12 PM - 3 PM  1/8/2019  BEN 
BLD - Framing Insp.  1/8/2019 1:35:00 PM  1/9/2019  8 AM - 12 PM  1/9/2019  BEN 
BLD - Drywall Inspection  1/8/2019 1:35:06 PM  1/9/2019  8 AM - 12 PM  1/9/2019  BEN 
BLD - Exterior Lath Insp  1/8/2019 1:35:13 PM  1/9/2019  8 AM - 12 PM  1/9/2019  BEN 
ELE - Rough Electrical  1/8/2019 1:35:23 PM  1/9/2019  8 AM - 12 PM  1/9/2019  BEN 
BLD - Framing Insp.  1/9/2019 11:28:02 AM  1/10/2019  8 AM - 12 PM  1/10/2019  BEN 
BLD - Drywall Inspection  1/9/2019 11:28:08 AM  1/10/2019  8 AM - 12 PM  1/10/2019  BEN 
BLD - Exterior Lath Insp  1/9/2019 11:28:18 AM  1/10/2019  8 AM - 12 PM  1/10/2019  BEN 
ELE - Rough Electrical  1/9/2019 11:28:35 AM  1/10/2019  8 AM - 12 PM  1/10/2019  BEN 
BLD - Framing Insp.  1/10/2019 1:55:35 PM  1/11/2019  8 AM - 12 PM  1/11/2019  BEN 
BLD - Exterior Lath Insp  1/10/2019 1:56:07 PM  1/11/2019  8 AM - 12 PM  1/11/2019  BEN 
ELE - Rough Electrical  1/10/2019 1:56:15 PM  1/11/2019  8 AM - 12 PM  1/11/2019  BEN 
BLD - Framing Insp.  1/13/2019 1:57:50 PM  1/14/2019  8 AM - 12 PM  1/14/2019  PJJ 
BLD - Drywall Inspection  1/13/2019 1:58:02 PM  1/14/2019  8 AM - 12 PM  1/14/2019  PJJ 
BLD - Exterior Lath Insp  1/13/2019 1:58:17 PM  1/14/2019  8 AM - 12 PM  1/14/2019  PJJ 
ELE - Rough Electrical  1/13/2019 1:58:32 PM  1/14/2019  8 AM - 12 PM  1/14/2019  PJJ 
BLD - T-Bar (Structural) Insp  1/13/2019 1:59:28 PM  1/14/2019  8 AM - 12 PM  1/14/2019  PJJ 
BLD - Framing Insp.  1/14/2019 1:24:10 PM  1/15/2019  8 AM - 12 PM  1/15/2019  BEN 
BLD - Drywall Inspection  1/14/2019 1:24:16 PM  1/15/2019  8 AM - 12 PM  1/15/2019  BEN 
BLD - Exterior Lath Insp  1/14/2019 1:24:23 PM  1/15/2019  8 AM - 12 PM  1/15/2019  BEN 
ELE - Rough Electrical  1/14/2019 1:24:33 PM  1/15/2019  8 AM - 12 PM  1/15/2019  BEN 
BLD - Framing Insp.  1/15/2019 8:47:24 AM  1/16/2019  10 AM - 2 PM  1/16/2019  BEN 
BLD - Drywall Inspection  1/15/2019 8:47:56 AM  1/16/2019  10 AM - 2 PM  1/16/2019  BEN 
BLD - Exterior Lath Insp  1/15/2019 8:48:04 AM  1/16/2019  10 AM - 2 PM  1/16/2019  BEN 
ELE - Rough Electrical  1/15/2019 8:48:12 AM  1/16/2019  10 AM - 2 PM  1/16/2019  BEN 
MEC - Rough Mechanical  1/15/2019 9:05:18 PM  1/16/2019  10 AM - 2 PM  1/16/2019  BEN 
MEC - Rough Duct  1/15/2019 9:05:31 PM  1/16/2019  10 AM - 2 PM  1/16/2019  BEN 
BLD - Framing Insp.  1/16/2019 11:05:28 AM  1/17/2019  8 AM - 12 PM  1/17/2019  BEN 
BLD - Exterior Lath Insp  1/16/2019 11:05:37 AM  1/17/2019  8 AM - 12 PM  1/17/2019  BEN 
ELE - Rough Electrical  1/16/2019 11:05:49 AM  1/17/2019  8 AM - 12 PM  1/17/2019  BEN 
BLD - Framing Insp.  1/17/2019 8:13:39 AM  1/18/2019  12 PM - 3 PM  1/18/2019  BEN 
BLD - Exterior Lath Insp  1/17/2019 8:13:46 AM  1/18/2019  12 PM - 3 PM  1/18/2019  BEN 
ELE - Rough Electrical  1/17/2019 8:13:55 AM  1/18/2019  12 PM - 3 PM  1/18/2019  BEN 
BLD - Framing Insp.  1/18/2019 10:41:21 AM  1/22/2019  10 AM - 2 PM  1/22/2019  PJJ 
BLD - Exterior Lath Insp  1/18/2019 10:41:28 AM  1/22/2019  10 AM - 2 PM  1/22/2019  PJJ 
ELE - Rough Electrical  1/18/2019 10:41:40 AM  1/22/2019  10 AM - 2 PM  1/22/2019  PJJ 
BLD - T-Bar (Structural) Insp  1/21/2019 1:39:13 PM  1/22/2019  10 AM - 2 PM  1/22/2019  PJJ 
ELE - T-Bar Electrical  1/21/2019 1:39:25 PM  1/22/2019  10 AM - 2 PM  1/22/2019  PJJ 
MEC - Rough Mechanical  1/21/2019 1:59:10 PM  1/22/2019  10 AM - 2 PM  1/22/2019  PJJ 
MEC - Rough Duct  1/21/2019 1:59:19 PM  1/22/2019  10 AM - 2 PM  1/22/2019  PJJ 
BLD - Framing Insp.  1/22/2019 9:42:02 AM  1/23/2019  12 PM - 3 PM  1/23/2019  BEN 
BLD - Drywall Inspection  1/22/2019 9:42:07 AM  1/23/2019  12 PM - 3 PM  1/23/2019  BEN 
BLD - Exterior Lath Insp  1/22/2019 9:42:11 AM  1/23/2019  12 PM - 3 PM  1/23/2019  BEN 
ELE - Rough Electrical  1/22/2019 9:42:17 AM  1/23/2019  12 PM - 3 PM  1/23/2019  BEN 
BLD - T-Bar (Structural) Insp  1/22/2019 9:42:24 AM  1/23/2019  12 PM - 3 PM  1/23/2019  BEN 
MEC - Rough Duct  1/22/2019 9:42:34 AM  1/23/2019  12 PM - 3 PM  1/23/2019  BEN 
BLD - Framing Insp.  1/23/2019 11:12:15 AM  1/24/2019  8 AM - 12 PM  1/24/2019  BEN 
BLD - Drywall Inspection  1/23/2019 11:12:20 AM  1/24/2019  8 AM - 12 PM  1/24/2019  BEN 
BLD - Exterior Lath Insp  1/23/2019 11:12:27 AM  1/24/2019  8 AM - 12 PM  1/24/2019  BEN 
BLD - T-Bar (Structural) Insp  1/23/2019 11:12:36 AM  1/24/2019  8 AM - 12 PM  1/24/2019  BEN 
ELE - Rough Electrical  1/23/2019 11:12:44 AM  1/24/2019  8 AM - 12 PM  1/24/2019  BEN 
BLD - Framing Insp.  1/24/2019 6:42:52 AM  1/25/2019  8 AM - 12 PM  1/25/2019  BEN 
BLD - Drywall Inspection  1/24/2019 6:42:59 AM  1/25/2019  8 AM - 12 PM  1/25/2019  BEN 
BLD - Exterior Lath Insp  1/24/2019 6:43:07 AM  1/25/2019  8 AM - 12 PM  1/25/2019  BEN 
ELE - Rough Electrical  1/24/2019 6:43:34 AM  1/25/2019  8 AM - 12 PM  1/25/2019  BEN 
BLD - T-Bar (Structural) Insp  1/24/2019 6:43:46 AM  1/25/2019  8 AM - 12 PM  1/25/2019  BEN 
BLD - Framing Insp.  1/25/2019 10:08:59 AM  1/28/2019  10 AM - 2 PM  1/28/2019  PJJ 
BLD - Drywall Inspection  1/25/2019 10:09:42 AM  1/28/2019  10 AM - 2 PM  1/28/2019  PJJ 
BLD - Exterior Lath Insp  1/25/2019 10:09:49 AM  1/28/2019  10 AM - 2 PM  1/28/2019  PJJ 
BLD - T-Bar (Structural) Insp  1/25/2019 10:09:57 AM  1/28/2019  10 AM - 2 PM  1/28/2019  PJJ 
ELE - Rough Electrical  1/25/2019 10:10:09 AM  1/28/2019  10 AM - 2 PM  1/28/2019  PJJ 
Approved by Planning Zoning  1/24/2019      1/31/2019 11:23:51 AM  APPR  EYT 
Route to Planning Zoning  1/24/2019  2/11/2019    1/31/2019  APPR  EYT 
Apprv. by PW Develop. Services  1/24/2019      1/30/2019 10:44:16 AM  APPR  SXA 
Route to PW Develop. Services  1/24/2019  2/11/2019    1/30/2019  APPR  SXA 
Approved by Traffic Eng.  1/24/2019      1/30/2019 10:19:09 AM  APPR  RXC 
Route to Traffic Engineering  1/24/2019  2/11/2019    1/30/2019  APPR  RXC 
Apprv. by Struct/Architectural  1/24/2019      1/31/2019 2:48:43 PM  APPR  CSG 
Route to Struct/Architectual  1/24/2019  2/11/2019    1/31/2019  APPR  CSG 
Route to Fire Department  1/24/2019  2/11/2019    2/5/2019  NR  EPO 
Approved by Fire Department  1/24/2019      2/5/2019 10:48:06 AM  NR  EPO 
BLD - Framing Insp.  1/28/2019 10:31:23 AM  1/29/2019  8 AM - 12 PM  1/29/2019  BEN 
BLD - Drywall Inspection  1/28/2019 10:31:47 AM  1/29/2019  8 AM - 12 PM  1/29/2019  BEN 
BLD - Exterior Lath Insp  1/28/2019 10:31:54 AM  1/29/2019  8 AM - 12 PM  1/29/2019  BEN 
BLD - T-Bar (Structural) Insp  1/28/2019 10:32:04 AM  1/29/2019  8 AM - 12 PM  1/29/2019  BEN 
ELE - Rough Electrical  1/28/2019 10:32:14 AM  1/29/2019  8 AM - 12 PM  1/29/2019  BEN 
MEC - Rough Duct  1/28/2019 12:47:23 PM  1/29/2019  8 AM - 12 PM  1/29/2019  BEN 
MEC - Rough Mechanical  1/28/2019 12:47:31 PM  1/29/2019  8 AM - 12 PM  1/29/2019  BEN 
BLD - Framing Insp.  1/29/2019 9:37:36 AM  1/30/2019  12 PM - 3 PM  1/30/2019  BEN 
BLD - Pre-Slab Insp  1/29/2019 9:37:55 AM  1/30/2019  12 PM - 3 PM  1/30/2019  BEN 
BLD - Drywall Inspection  1/29/2019 9:38:20 AM  1/30/2019  12 PM - 3 PM  1/30/2019  BEN 
BLD - Exterior Lath Insp  1/29/2019 9:38:26 AM  1/30/2019  12 PM - 3 PM  1/30/2019  BEN 
ELE - Rough Electrical  1/29/2019 9:38:36 AM  1/30/2019  12 PM - 3 PM  1/30/2019  BEN 
BLD - Framing Insp.  1/30/2019 12:25:16 PM  1/31/2019  12 PM - 3 PM  1/31/2019  BEN 
BLD - Exterior Lath Insp  1/30/2019 12:25:25 PM  1/31/2019  12 PM - 3 PM  1/31/2019  BEN 
ELE - Rough Electrical  1/30/2019 12:25:32 PM  1/31/2019  12 PM - 3 PM  1/31/2019  BEN 
BLD - Framing Insp.  1/31/2019 11:03:16 AM  2/1/2019  8 AM - 12 PM  2/1/2019  BEN 
ELE - Rough Electrical  1/31/2019 11:03:26 AM  2/1/2019  8 AM - 12 PM  2/1/2019  BEN 
MEC - Rough Duct  1/31/2019 2:20:52 PM  2/1/2019  8 AM - 12 PM  2/1/2019  BEN 
BLD - Framing Insp.  2/1/2019 10:54:49 AM  2/4/2019  8 AM - 12 PM  2/4/2019  PJJ 
ELE - Rough Electrical  2/1/2019 10:54:57 AM  2/4/2019  8 AM - 12 PM  2/4/2019  PJJ 
BLD - Framing Insp.  2/4/2019 1:29:20 PM  2/5/2019  8 AM - 12 PM  2/5/2019  BEN 
ELE - Rough Electrical  2/4/2019 1:29:27 PM  2/5/2019  8 AM - 12 PM  2/5/2019  BEN 
BLD - Framing Insp.  2/5/2019 11:22:57 AM  2/6/2019  8 AM - 12 PM  2/6/2019  BEN 
ELE - Rough Electrical  2/5/2019 11:23:07 AM  2/6/2019  8 AM - 12 PM  2/6/2019  BEN 
BLD - Framing Insp.  2/6/2019 10:59:22 AM  2/7/2019  12 PM - 3 PM  2/7/2019  BEN 
ELE - Rough Electrical  2/6/2019 10:59:31 AM  2/7/2019  12 PM - 3 PM  2/7/2019  BEN 
BLD - Framing Insp.  2/7/2019 12:18:54 PM  2/8/2019  12 PM - 3 PM  2/8/2019  BEN 
ELE - Rough Electrical  2/7/2019 12:19:01 PM  2/8/2019  12 PM - 3 PM  2/8/2019  BEN 
BLD - Framing Insp.  2/8/2019 7:51:06 AM  2/11/2019  10 AM - 2 PM  2/11/2019  PJJ 
ELE - Rough Electrical  2/8/2019 7:51:13 AM  2/11/2019  10 AM - 2 PM  2/11/2019  PJJ 
BLD - Reinforcing Insp  2/10/2019 1:43:51 PM  2/11/2019  10 AM - 2 PM  2/11/2019  PJJ 
BLD - Framing Insp.  2/11/2019 11:51:59 AM  2/12/2019  8 AM - 12 PM  2/12/2019  BEN 
ELE - Rough Electrical  2/11/2019 11:52:11 AM  2/12/2019  8 AM - 12 PM  2/12/2019  BEN 
BLD - T-Bar (Structural) Insp  2/11/2019 12:54:22 PM  2/12/2019  8 AM - 12 PM  2/12/2019  BEN 
BLD - Framing Insp.  2/12/2019 1:27:08 PM  2/13/2019  8 AM - 12 PM  2/13/2019  BEN 
BLD - Exterior Lath Insp  2/12/2019 1:27:14 PM  2/13/2019  8 AM - 12 PM  2/13/2019  BEN 
BLD - T-Bar (Structural) Insp  2/12/2019 1:27:22 PM  2/13/2019  8 AM - 12 PM  2/13/2019  BEN 
ELE - Rough Electrical  2/12/2019 1:27:32 PM  2/13/2019  8 AM - 12 PM  2/13/2019  BEN 
PLM - Gas Test  2/12/2019 1:27:51 PM  2/13/2019  8 AM - 12 PM  2/13/2019  BEN 
BLD - Framing Insp.  2/13/2019 10:54:31 AM  2/14/2019  8 AM - 12 PM  2/14/2019  BEN 
BLD - Exterior Lath Insp  2/13/2019 10:54:38 AM  2/14/2019  8 AM - 12 PM  2/14/2019  BEN 
ELE - Rough Electrical  2/13/2019 10:54:46 AM  2/14/2019  8 AM - 12 PM  2/14/2019  BEN 
BLD - Framing Insp.  2/14/2019 1:11:13 PM  2/15/2019  8 AM - 12 PM  2/15/2019  BEN 
BLD - Exterior Lath Insp  2/14/2019 1:11:18 PM  2/15/2019  8 AM - 12 PM  2/15/2019  BEN 
ELE - Rough Electrical  2/14/2019 1:11:28 PM  2/15/2019  8 AM - 12 PM  2/15/2019  BEN 
PLM - Gas Test  2/14/2019 1:13:41 PM  2/15/2019  8 AM - 12 PM  2/15/2019  BEN 
BLD - Framing Insp.  2/18/2019 10:52:41 AM  2/19/2019  8 AM - 12 PM  2/19/2019  PJJ 
BLD - Exterior Lath Insp  2/18/2019 10:52:48 AM  2/19/2019  8 AM - 12 PM  2/19/2019  PJJ 
ELE - Rough Electrical  2/18/2019 10:52:58 AM  2/19/2019  8 AM - 12 PM  2/19/2019  PJJ 
PLM - Underground gas  2/18/2019 10:53:10 AM  2/19/2019  8 AM - 12 PM  2/19/2019  PJJ 
Route to Fire Department  2/15/2019  3/6/2019    2/27/2019  NR  EPO 
Approved by Fire Department  2/15/2019      2/27/2019 11:37:46 AM  NR  EPO 
Approved by Planning Zoning  2/15/2019      2/21/2019 1:05:33 PM  APPR  EYT 
Route to Planning Zoning  2/15/2019  3/6/2019    2/21/2019  APPR  EYT 
Apprv. by Struct/Architectural  2/15/2019      2/26/2019 10:19:39 AM  APPR  CSG 
Route to Struct/Architectual  2/15/2019  3/6/2019    2/26/2019  APPR  CSG 
BLD - Framing Insp.  2/19/2019 1:57:59 PM  2/20/2019  8 AM - 12 PM  2/20/2019  PJJ 
BLD - Exterior Lath Insp  2/19/2019 1:58:07 PM  2/20/2019  8 AM - 12 PM  2/20/2019  PJJ 
ELE - Rough Electrical  2/19/2019 1:58:17 PM  2/20/2019  8 AM - 12 PM  2/20/2019  PJJ 
BLD - Framing Insp.  2/20/2019 1:01:12 PM  2/21/2019  8 AM - 12 PM  2/21/2019  PJJ 
BLD - Exterior Lath Insp  2/20/2019 1:01:20 PM  2/21/2019  8 AM - 12 PM  2/21/2019  PJJ 
ELE - Rough Electrical  2/20/2019 1:02:03 PM  2/21/2019  8 AM - 12 PM  2/21/2019  PJJ 
BLD - Framing Insp.  2/21/2019 10:49:28 AM  2/22/2019  8 AM - 12 PM  2/22/2019  BEN 
BLD - Exterior Lath Insp  2/21/2019 10:49:35 AM  2/22/2019  8 AM - 12 PM  2/22/2019  BEN 
ELE - Rough Electrical  2/21/2019 10:49:53 AM  2/22/2019  8 AM - 12 PM  2/22/2019  BEN 
BLD - T-Bar (Structural) Insp  2/24/2019 8:00:19 AM  2/25/2019  10 AM - 2 PM  2/25/2019  PJJ 
BLD - Framing Insp.  2/24/2019 12:09:08 PM  2/25/2019  10 AM - 2 PM  2/25/2019  PJJ 
ELE - Rough Electrical  2/24/2019 12:09:25 PM  2/25/2019  10 AM - 2 PM  2/25/2019  PJJ 
BLD - Exterior Lath Insp  2/24/2019 12:10:20 PM  2/25/2019  10 AM - 2 PM  2/25/2019  PJJ 
BLD - T-Bar (Structural) Insp  2/25/2019 1:47:40 PM  2/26/2019  8 AM - 12 PM  2/26/2019  BEN 
BLD - Framing Insp.  2/25/2019 1:48:39 PM  2/26/2019  8 AM - 12 PM  2/26/2019  BEN 
BLD - Exterior Lath Insp  2/25/2019 1:48:54 PM  2/26/2019  8 AM - 12 PM  2/26/2019  BEN 
ELE - Rough Electrical  2/25/2019 1:49:05 PM  2/26/2019  8 AM - 12 PM  2/26/2019  BEN 
BLD - Framing Insp.  2/26/2019 12:14:33 PM  2/27/2019  8 AM - 12 PM  2/27/2019  BEN 
BLD - Insulation Insp  2/26/2019 12:14:43 PM  2/27/2019  8 AM - 12 PM  2/27/2019  BEN 
BLD - Exterior Lath Insp  2/26/2019 12:14:56 PM  2/27/2019  8 AM - 12 PM  2/27/2019  BEN 
ELE - Rough Electrical  2/26/2019 12:15:08 PM  2/27/2019  8 AM - 12 PM  2/27/2019  BEN 
BLD - T-Bar (Structural) Insp  2/26/2019 12:15:20 PM  2/27/2019  8 AM - 12 PM  2/27/2019  BEN 
Inspection by Fire Department  2/27/2019  3/15/2019    5/3/2019  DONE  A836 
BLD - Framing Insp.  2/27/2019 11:53:36 AM  2/28/2019  8 AM - 12 PM  2/28/2019  BEN 
BLD - Insulation Insp  2/27/2019 11:53:47 AM  2/28/2019  8 AM - 12 PM  2/28/2019  BEN 
BLD - T-Bar (Structural) Insp  2/27/2019 11:53:53 AM  2/28/2019  8 AM - 12 PM  2/28/2019  BEN 
ELE - Rough Electrical  2/27/2019 11:54:03 AM  2/28/2019  8 AM - 12 PM  2/28/2019  BEN 
Route to Planning Zoning  2/27/2019  3/15/2019    3/1/2019  APPR  EYT 
Approved by Planning Zoning  2/27/2019      3/1/2019 8:42:03 AM  APPR  EYT 
Route to Struct/Architectual  2/27/2019  3/15/2019    3/4/2019  APPR  CSG 
Apprv. by Struct/Architectural  2/27/2019      3/4/2019  DONE  CSG 
BLD - Framing Insp.  2/28/2019 8:02:51 AM  3/1/2019  8 AM - 12 PM  3/1/2019  BEN 
BLD - Insulation Insp  2/28/2019 8:03:02 AM  3/1/2019  8 AM - 12 PM  3/1/2019  BEN 
BLD - Drywall Inspection  2/28/2019 8:03:08 AM  3/1/2019  8 AM - 12 PM  3/1/2019  BEN 
ELE - Rough Electrical  2/28/2019 8:03:15 AM  3/1/2019  8 AM - 12 PM  3/1/2019  BEN 
Route to Struct/Architectual  2/28/2019  3/18/2019    3/7/2019  APPR  CSG 
Apprv. by Struct/Architectural  2/28/2019      3/4/2019 11:40:44 AM  APPR  CSG 
BLD - Framing Insp.  3/1/2019 11:07:39 AM  3/4/2019  8 AM - 12 PM  3/4/2019  PJJ 
BLD - Insulation Insp  3/1/2019 11:07:58 AM  3/4/2019  8 AM - 12 PM  3/4/2019  PJJ 
ELE - Rough Electrical  3/1/2019 11:08:06 AM  3/4/2019  8 AM - 12 PM  3/4/2019  PJJ 
BLD - Framing Insp.  3/4/2019 10:28:08 AM  3/5/2019  8 AM - 12 PM  3/5/2019  BEN 
BLD - Insulation Insp  3/4/2019 10:28:13 AM  3/5/2019  8 AM - 12 PM  3/5/2019  BEN 
ELE - Rough Electrical  3/4/2019 10:28:23 AM  3/5/2019  8 AM - 12 PM  3/5/2019  BEN 
BLD - Framing Insp.  3/5/2019 12:17:15 PM  3/6/2019  12 PM - 3 PM  3/6/2019  BEN 
BLD - Insulation Insp  3/5/2019 12:17:36 PM  3/6/2019  12 PM - 3 PM  3/6/2019  BEN 
ELE - Rough Electrical  3/5/2019 12:17:43 PM  3/6/2019  12 PM - 3 PM  3/6/2019  BEN 
BLD - Framing Insp.  3/6/2019 9:45:19 AM  3/7/2019  8 AM - 12 PM  3/7/2019  BEN 
BLD - Insulation Insp  3/6/2019 9:45:25 AM  3/7/2019  8 AM - 12 PM  3/7/2019  BEN 
ELE - Rough Electrical  3/6/2019 9:45:32 AM  3/7/2019  8 AM - 12 PM  3/7/2019  BEN 
Apprv. by Struct/Architectural  3/6/2019      3/7/2019 2:05:48 PM  APPR  CSG 
Route to Struct/Architectual  3/6/2019  3/13/2019    3/21/2019  APPR  CSG 
Approved by Fire Department  3/6/2019      3/22/2019 2:26:07 PM  NR  472 
Route to Fire Department  3/6/2019  3/22/2019    3/22/2019  NR  472 
BLD - Framing Insp.  3/7/2019 1:22:49 PM  3/8/2019    3/8/2019  BEN 
BLD - Insulation Insp  3/7/2019 1:23:00 PM  3/8/2019    3/8/2019  BEN 
ELE - Rough Electrical  3/7/2019 1:23:10 PM  3/8/2019    3/8/2019  BEN 
BLD - Framing Insp.  3/8/2019 10:06:32 AM  3/11/2019  8 AM - 12 PM  3/11/2019  PJJ 
BLD - Insulation Insp  3/8/2019 10:06:44 AM  3/11/2019  8 AM - 12 PM  3/11/2019  PJJ 
ELE - Rough Electrical  3/8/2019 10:06:57 AM  3/11/2019  8 AM - 12 PM  3/11/2019  PJJ 
BLD - Framing Insp.  3/11/2019 8:41:25 AM  3/12/2019  8 AM - 12 PM  3/12/2019  BEN 
BLD - Insulation Insp  3/11/2019 8:41:33 AM  3/12/2019  8 AM - 12 PM  3/12/2019  BEN 
ELE - Rough Electrical  3/11/2019 8:41:41 AM  3/12/2019  8 AM - 12 PM  3/12/2019  BEN 
MEC - Rough Mechanical  3/11/2019 10:38:44 AM  3/12/2019  8 AM - 12 PM  3/12/2019  BEN 
MEC - Rough Duct  3/11/2019 10:38:54 AM  3/12/2019  8 AM - 12 PM  3/12/2019  BEN 
PLM - Ground/Underfloor waste  3/11/2019 10:39:03 AM  3/12/2019  8 AM - 12 PM  3/12/2019  BEN 
BLD - Framing Insp.  3/12/2019 2:06:37 PM  3/13/2019  8 AM - 12 PM  3/13/2019  BEN 
BLD - Exterior Lath Insp  3/12/2019 2:06:49 PM  3/13/2019  8 AM - 12 PM  3/13/2019  BEN 
ELE - Rough Electrical  3/12/2019 2:07:26 PM  3/13/2019  8 AM - 12 PM  3/13/2019  BEN 
BLD - Framing Insp.  3/13/2019 1:10:11 PM  3/14/2019  8 AM - 12 PM  3/14/2019  BEN 
BLD - Exterior Lath Insp  3/13/2019 1:10:19 PM  3/14/2019  8 AM - 12 PM  3/14/2019  BEN 
ELE - Rough Electrical  3/13/2019 1:12:29 PM  3/14/2019  8 AM - 12 PM  3/14/2019  BEN 
BLD - Framing Insp.  3/15/2019 6:44:43 AM  3/18/2019  10 AM - 2 PM  3/18/2019  PJJ 
BLD - Exterior Lath Insp  3/15/2019 6:44:49 AM  3/18/2019  10 AM - 2 PM  3/18/2019  PJJ 
ELE - Rough Electrical  3/15/2019 6:46:53 AM  3/18/2019  10 AM - 2 PM  3/18/2019  PJJ 
BLD - Framing Insp.  3/18/2019 1:19:43 PM  3/19/2019  12 PM - 3 PM  3/19/2019  BEN 
BLD - Exterior Lath Insp  3/18/2019 1:19:50 PM  3/19/2019  12 PM - 3 PM  3/19/2019  BEN 
ELE - Rough Electrical  3/18/2019 1:20:03 PM  3/19/2019  12 PM - 3 PM  3/19/2019  BEN 
ELE - Rough Electrical  3/19/2019 8:50:12 AM  3/20/2019  12 PM - 3 PM  3/20/2019  BEN 
BLD - Pre-Slab Insp  3/19/2019 1:59:16 PM  3/20/2019  12 PM - 3 PM  3/20/2019  BEN 
BLD - Drywall Inspection  3/19/2019 1:59:25 PM  3/20/2019  12 PM - 3 PM  3/20/2019  BEN 
BLD - Insulation Insp  3/19/2019 1:59:32 PM  3/20/2019  12 PM - 3 PM  3/20/2019  BEN 
BLD - Framing Insp.  3/19/2019 1:59:39 PM  3/20/2019  12 PM - 3 PM  3/20/2019  BEN 
BLD - T-Bar (Structural) Insp  3/19/2019 1:59:47 PM  3/20/2019  12 PM - 3 PM  3/20/2019  BEN 
ELE - T-Bar Electrical  3/19/2019 1:59:56 PM  3/20/2019  12 PM - 3 PM  3/20/2019  BEN 
PLM - Rough/Topout  3/19/2019 2:00:04 PM  3/20/2019  12 PM - 3 PM  3/20/2019  BEN 
MEC - Rough Mechanical  3/19/2019 2:00:15 PM  3/20/2019  12 PM - 3 PM  3/20/2019  BEN 
BLD - Drywall Inspection  3/20/2019 12:03:36 PM  3/21/2019  12 PM - 3 PM  3/21/2019  BEN 
BLD - Framing Insp.  3/20/2019 12:03:45 PM  3/21/2019  12 PM - 3 PM  3/21/2019  BEN 
ELE - Rough Electrical  3/20/2019 12:04:20 PM  3/21/2019  12 PM - 3 PM  3/21/2019  BEN 
PLM - Rough/Topout  3/20/2019 12:04:30 PM  3/21/2019  12 PM - 3 PM  3/21/2019  BEN 
MEC - Rough Mechanical  3/20/2019 12:04:40 PM  3/21/2019  12 PM - 3 PM  3/21/2019  BEN 
BLD - Drywall Inspection  3/21/2019 2:30:52 PM  3/22/2019  12 PM - 3 PM  3/22/2019  BEN 
BLD - Framing Insp.  3/21/2019 2:31:14 PM  3/22/2019  12 PM - 3 PM  3/22/2019  BEN 
ELE - Rough Electrical  3/21/2019 2:31:46 PM  3/22/2019  12 PM - 3 PM  3/22/2019  BEN 
PLM - Rough/Topout  3/21/2019 2:31:53 PM  3/22/2019  12 PM - 3 PM  3/22/2019  BEN 
MEC - Rough Mechanical  3/21/2019 2:32:00 PM  3/22/2019  12 PM - 3 PM  3/22/2019  BEN 
BLD - Drywall Inspection  3/22/2019 12:42:37 PM  3/25/2019  8 AM - 12 PM  3/25/2019  PJJ 
BLD - Framing Insp.  3/22/2019 12:42:52 PM  3/25/2019  8 AM - 12 PM  3/25/2019  PJJ 
ELE - Rough Electrical  3/22/2019 12:43:17 PM  3/25/2019  8 AM - 12 PM  3/25/2019  PJJ 
PLM - Rough/Topout  3/22/2019 12:43:25 PM  3/25/2019  8 AM - 12 PM  3/25/2019  PJJ 
MEC - Rough Mechanical  3/22/2019 12:43:45 PM  3/25/2019  8 AM - 12 PM  3/25/2019  PJJ 
Approved by Planning Zoning  3/6/2019      3/22/2019 2:40:26 PM  APPR  EYT 
Route to Planning Zoning  3/6/2019  3/22/2019    3/22/2019  APPR  EYT 
BLD - Drywall Inspection  3/25/2019 10:02:24 AM  3/26/2019  8 AM - 12 PM  3/27/2019  BEN 
BLD - T-Bar (Structural) Insp  3/25/2019 10:02:42 AM  3/26/2019  8 AM - 12 PM  3/27/2019  BEN 
PLM - Rough/Topout  3/25/2019 10:03:00 AM  3/26/2019  8 AM - 12 PM  3/27/2019  BEN 
MEC - Rough Mechanical  3/25/2019 10:03:06 AM  3/26/2019  8 AM - 12 PM  3/27/2019  BEN 
BLD - Framing Insp.  3/25/2019 10:03:14 AM  3/26/2019  8 AM - 12 PM  3/27/2019  BEN 
BLD - Drywall Inspection  3/26/2019 2:37:24 PM  3/27/2019  8 AM - 12 PM  3/27/2019  BEN 
BLD - Framing Insp.  3/26/2019 2:37:30 PM  3/27/2019  8 AM - 12 PM  3/27/2019  BEN 
BLD - T-Bar (Structural) Insp  3/26/2019 2:37:59 PM  3/27/2019  8 AM - 12 PM  3/27/2019  BEN 
ELE - Rough Electrical  3/26/2019 2:38:09 PM  3/27/2019  8 AM - 12 PM  3/27/2019  BEN 
PLM - Rough/Topout  3/26/2019 2:38:16 PM  3/27/2019  8 AM - 12 PM  3/27/2019  BEN 
MEC - Rough Mechanical  3/26/2019 2:38:23 PM  3/27/2019  8 AM - 12 PM  3/27/2019  BEN 
MEC - Rough Duct  3/26/2019 2:38:37 PM  3/27/2019  8 AM - 12 PM  3/27/2019  BEN 
ELE - T-Bar Electrical  3/26/2019 2:38:56 PM  3/27/2019  8 AM - 12 PM  3/27/2019  BEN 
BLD - Framing Insp.  3/27/2019 12:49:16 PM  3/28/2019  10 AM - 2 PM  3/28/2019  PJJ 
BLD - T-Bar (Structural) Insp  3/27/2019 12:49:42 PM  3/28/2019  10 AM - 2 PM  3/28/2019  PJJ 
ELE - T-Bar Electrical  3/27/2019 12:49:49 PM  3/28/2019  10 AM - 2 PM  3/28/2019  PJJ 
ELE - Rough Electrical  3/27/2019 12:50:00 PM  3/28/2019  10 AM - 2 PM  3/28/2019  PJJ 
PLM - Rough/Topout  3/27/2019 12:50:09 PM  3/28/2019  10 AM - 2 PM  3/28/2019  PJJ 
MEC - Rough Mechanical  3/27/2019 12:50:21 PM  3/28/2019  10 AM - 2 PM  3/28/2019  PJJ 
MEC - Rough Duct  3/27/2019 12:50:29 PM  3/28/2019  10 AM - 2 PM  3/28/2019  PJJ 
BLD - Framing Insp.  3/28/2019 11:31:11 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
BLD - T-Bar (Structural) Insp  3/28/2019 11:31:25 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
ELE - T-Bar Electrical  3/28/2019 11:31:33 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
ELE - Rough Electrical  3/28/2019 11:31:42 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
PLM - Rough/Topout  3/28/2019 11:31:49 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
MEC - Rough Duct  3/28/2019 11:32:21 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
MEC - Rough Mechanical  3/28/2019 11:32:28 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
BLD - Exterior Lath Insp  3/28/2019 11:32:37 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
BLD - Interior Lath  3/28/2019 11:33:11 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
BLD - Drywall Inspection  3/28/2019 11:33:16 AM  3/29/2019  8 AM - 12 PM  3/29/2019  BEN 
BLD - Framing Insp.  3/29/2019 12:54:22 PM  4/1/2019  8 AM - 12 PM  4/1/2019  PJJ 
BLD - T-Bar (Structural) Insp  3/29/2019 12:54:29 PM  4/1/2019  8 AM - 12 PM  4/1/2019  PJJ 
ELE - T-Bar Electrical  3/29/2019 12:54:38 PM  4/1/2019  8 AM - 12 PM  4/1/2019  PJJ 
ELE - Rough Electrical  3/29/2019 12:54:51 PM  4/1/2019  8 AM - 12 PM  4/1/2019  PJJ 
PLM - Rough/Topout  3/29/2019 12:56:03 PM  4/1/2019  8 AM - 12 PM  4/1/2019  PJJ 
BLD - Framing Insp.  4/1/2019 11:27:02 AM  4/2/2019  10 AM - 2 PM  4/2/2019  BEN 
BLD - T-Bar (Structural) Insp  4/1/2019 11:27:09 AM  4/2/2019  10 AM - 2 PM  4/2/2019  BEN 
PLM - Rough/Topout  4/1/2019 11:27:19 AM  4/2/2019  10 AM - 2 PM  4/2/2019  BEN 
ELE - Rough Electrical  4/1/2019 11:27:29 AM  4/2/2019  10 AM - 2 PM  4/2/2019  BEN 
MEC - Rough Mechanical  4/1/2019 11:27:38 AM  4/2/2019  10 AM - 2 PM  4/2/2019  BEN 
BLD - T-Bar (Structural) Insp  4/2/2019 11:26:55 AM  4/3/2019  8 AM - 12 PM  4/3/2019  BEN 
ELE - T-Bar Electrical  4/2/2019 11:27:04 AM  4/3/2019  8 AM - 12 PM  4/3/2019  BEN 
PLM - Rough/Topout  4/2/2019 11:27:13 AM  4/3/2019  8 AM - 12 PM  4/3/2019  BEN 
BLD - Framing Insp.  4/2/2019 11:27:19 AM  4/3/2019  8 AM - 12 PM  4/3/2019  BEN 
BLD - Framing Insp.  4/3/2019 10:56:33 AM  4/4/2019  8 AM - 12 PM  4/4/2019  BEN 
BLD - T-Bar (Structural) Insp  4/3/2019 10:56:39 AM  4/4/2019  8 AM - 12 PM  4/4/2019  BEN 
ELE - T-Bar Electrical  4/3/2019 10:56:47 AM  4/4/2019  8 AM - 12 PM  4/4/2019  BEN 
PLM - Rough/Topout  4/3/2019 10:57:00 AM  4/4/2019  8 AM - 12 PM  4/4/2019  BEN 
ELE - Rough Electrical  4/4/2019  4/6/2019    4/8/2019  PJJ 
BLD - Framing Insp.  4/4/2019 1:51:25 PM  4/5/2019  8 AM - 12 PM  4/5/2019  PJJ 
BLD - T-Bar (Structural) Insp  4/4/2019 1:51:45 PM  4/5/2019  8 AM - 12 PM  4/5/2019  PJJ 
BLD - Framing Insp.  4/5/2019 9:39:12 AM  4/8/2019  8 AM - 12 PM  4/8/2019  PJJ 
BLD - T-Bar (Structural) Insp  4/5/2019 9:39:20 AM  4/8/2019  8 AM - 12 PM  4/8/2019  PJJ 
ELE - T-Bar Electrical  4/5/2019 9:39:28 AM  4/8/2019  8 AM - 12 PM  4/8/2019  PJJ 
BLD - Framing Insp.  4/8/2019 11:51:05 AM  4/9/2019  8 AM - 12 PM  4/9/2019  PJJ 
BLD - Drywall Inspection  4/8/2019 11:52:55 AM  4/9/2019  8 AM - 12 PM  4/9/2019  PJJ 
ELE - Rough Electrical  4/22/2019 9:56:42 AM  4/23/2019  12 PM - 3 PM  4/23/2019  BEN 
Approved Alternate MatL/Method  4/23/2019      5/1/2019  DONE  AJP2 
Approved Alternate MatL/Method  4/23/2019      5/1/2019  DONE  AJP2 
Route To Alternate MatL/Method  4/23/2019  5/9/2019    5/1/2019  APPR  AJP2 
Route To Alternate MatL/Method  4/23/2019  5/9/2019    5/1/2019  APPR  AJP2 
Plumbing Final Insp Request  4/24/2019 4:38:29 PM  4/25/2019  12 PM - 3 PM  4/25/2019  BEN 
Electrical Final Insp Request  4/24/2019 4:38:43 PM  4/25/2019  12 PM - 3 PM  4/25/2019  BEN 
Mechanical Final Insp Request  4/24/2019 4:38:53 PM  4/25/2019  12 PM - 3 PM  4/25/2019  BEN 
Electrical Final Insp Request  4/25/2019  4/26/2019  12 PM - 3 PM  4/26/2019  BEN 
Mechanical Final Insp Request  4/25/2019  4/26/2019  12 PM - 3 PM  4/26/2019  BEN 
Plumbing Final Insp Request  4/25/2019  4/26/2019  12 PM - 3 PM  4/26/2019  BEN 
BLD - Framing Insp.  4/25/2019 7:11:55 PM  4/26/2019  12 PM - 3 PM  4/26/2019  BEN 
Approved Alternate MatL/Method  4/26/2019      4/26/2019  TBA 
Route To Alternate MatL/Method  4/26/2019  5/14/2019    4/26/2019  APPR  TBA 
Approved Alternate MatL/Method  4/26/2019      4/26/2019  TBA 
Route To Alternate MatL/Method  4/26/2019  5/14/2019    4/26/2019  APPR  TBA 
BLD - TCO App Consideration  4/26/2019  4/26/2019    4/26/2019  BEN 
Plumbing Final        4/26/2019    BEN 
Electrical Final        4/26/2019    BEN 
Mechanical Final        4/26/2019    BEN 
BLD - Framing Insp.  5/2/2019 4:38:38 PM  5/3/2019    5/3/2019  BEN 
Building Final Insp Request  5/6/2019 8:05:20 AM  5/7/2019  8 AM - 12 PM  5/7/2019  PJJ 
Building Final        5/7/2019    PJJ 
Planning GIS - Building Change  5/7/2019 1:41:34 PM      6/7/2019  DONE  HXN 

 