Home Status Help

View Permit Status

The information below summarizes the Permit Number you selected.

Permit Number:  BLD2019-06139     Status:   Issued     Map Info:   1313 S HARBOR
Name:  WALT DISNEY WORLD CO
Address: 1313 S HARBOR
Received Date: 12/04/2019 
Parcel: 08219019 
Plan Check Date:  
Issue Date: 09/16/2020 
Expiration Date: 03/16/2022 
Finaled Date:  
Description: Disney - Bldg 6202 - (Pkg 5) - Non Residential Construction: Demolished 4,697 sq.ft to reduce existing building and reconstruct 153 sq.ft. Reconfigure existing area 4,451 sq.ft. covered canopy 560 sq.ft  

Activities
Type  Requested  Scheduled  Time of Inspection  Completed  Disposition  Employee 
Route to Traffic Engineering  12/4/2019  12/20/2019    12/23/2019  APPR  RXC 
Approved by Traffic Eng.  12/4/2019      12/23/2019 10:53:32 AM  APPR  RXC 
Route to PW Develop. Services  12/4/2019  12/20/2019    12/23/2019  APPR  SXA 
Apprv. by PW Develop. Services  12/4/2019      12/23/2019 1:19:24 PM  APPR  SXA 
Route to Fire Department  12/4/2019  12/20/2019    12/18/2019  APPR  EPO 
Approved by Fire Department  12/4/2019      12/18/2019 3:44:03 PM  APPR  EPO 
Route to Elec Engineering  12/4/2019  12/20/2019    12/10/2019  APPR  LCA2 
Approved by Elec Engineering  12/4/2019      12/10/2019 10:15:19 AM  APPR  LCA2 
Route to Struct/Architectual  12/4/2019  12/20/2019    1/3/2020  CORR  ITW 
Apprv. by Struct/Architectural  12/4/2019      3/16/2020 10:57:36 AM  APPR  ITW 
Route to Planning Zoning  12/4/2019  12/20/2019    1/7/2020  APPR  EYT 
Approved by Planning Zoning  12/4/2019      1/7/2020 10:44:40 AM  APPR  EYT 
Route to Water Engineering  12/4/2019  12/20/2019    12/17/2019  APPR  DRS 
Approved by Water Engineering  12/4/2019      12/17/2019 1:57:08 PM  APPR  DRS 
Route to Electrical  12/4/2019  12/20/2019    12/17/2019  APPR  MCS 
Approved by Electrical  12/4/2019      12/17/2019 9:58:18 AM  APPR  MCS 
Approved by Addressing  12/4/2019      12/6/2019 10:35:54 AM  APPR  HXN 
Route to Addressing  12/4/2019  12/20/2019    12/6/2019  APPR  HXN 
Approved: School Fees Due  12/4/2019      2/25/2020  NR  CMN 
Approved by Mechanical  12/4/2019      12/19/2019 12:19:24 PM  APPR  EWC 
Route to Mechanical  12/4/2019  12/20/2019    12/19/2019  APPR  EWC 
Approved by Plumbing  12/4/2019      12/19/2019 12:18:55 PM  APPR  EWC 
Route to Plumbing  12/4/2019  12/20/2019    12/19/2019  APPR  EWC 
Route to C&D Waste Mgmt  12/4/2019  12/20/2019    2/25/2020  APPR  RGO 
Approved by C&D Waste Mgmt  12/4/2019      2/25/2020  APPR  RGO 
Inspection by Fire Department  12/18/2019  1/7/2020         
Route to Struct/Architectual  2/24/2020  3/3/2020    2/27/2020  CORR  ITW 
Route to C&D Waste Mgmt  2/24/2020  3/3/2020    2/25/2020  APPR  RGO 
Route to Struct/Architectual  3/10/2020  3/26/2020    3/16/2020  APPR  ITW 
Approved Revision Structural  2/9/2021      2/26/2021  APPR  ITW 
Route Revision Structural  2/9/2021  2/26/2021    2/26/2021  APPR  ITW 
Approved by Planning Zoning  2/9/2021      3/12/2021 9:01:46 AM  APPR  EYT 
Route to Planning Zoning  2/9/2021  2/26/2021    2/26/2021  APPR  EYT 
BLD - Footings Insp  7/28/2021 3:36:34 PM  7/29/2021  8 AM - 12 PM  7/29/2021  BEN 
BLD - Footings Insp  8/4/2021 3:55:07 PM  8/5/2021  8 AM - 12 PM  8/5/2021  BEN 
BLD - Footings Insp  8/19/2021 2:15:29 PM  8/20/2021  12 PM - 3 PM  8/20/2021  BCJ 
ELE - Underground conduit  9/30/2021 3:45:36 PM  10/1/2021  10 AM - 2 PM  10/1/2021  BCJ 
PLM - Ground/Underfloor waste  10/1/2021 3:10:17 PM  10/4/2021  8 AM - 12 PM  10/4/2021  DONE  GCT 
BLD - Reinforcing Insp  10/5/2021 4:21:36 PM  10/6/2021  12 PM - 3 PM  10/6/2021  BCJ 
ELE - Underground conduit  10/12/2021 3:25:30 PM  10/13/2021  8 AM - 12 PM  10/13/2021  BEN 
ELE - Underground conduit  10/13/2021 3:29:21 PM  10/14/2021  8 AM - 12 PM  10/14/2021  BEN 
BLD - Framing Insp.  10/13/2021 3:36:00 PM  10/14/2021  8 AM - 12 PM  10/14/2021  BEN 

 


Back to Search
Help Top of Page