Type  |
Requested  |
Scheduled  |
Time of Inspection  |
Completed  |
Disposition  |
Employee  |
Route to Struct/Architectual  |
4/12/2019  |
4/30/2019  |
  |
4/30/2019  |
CORR  |
ITW  |
Apprv. by Struct/Architectural  |
4/12/2019  |
  |
  |
6/12/2019 3:45:18 PM  |
APPR  |
ITW  |
Route to Planning Zoning  |
4/12/2019  |
4/30/2019  |
  |
5/8/2019  |
APPR  |
EYT  |
Approved by Planning Zoning  |
4/12/2019  |
  |
  |
5/8/2019 4:24:22 PM  |
APPR  |
EYT  |
Approved by Addressing  |
4/12/2019  |
  |
  |
4/19/2019 7:38:16 AM  |
APPR  |
HXN  |
Route to Addressing  |
4/12/2019  |
4/30/2019  |
  |
4/19/2019  |
APPR  |
HXN  |
Approved by Elec Engineering  |
4/12/2019  |
  |
  |
5/9/2019 10:01:53 AM  |
APPR  |
CMK  |
Route to Elec Engineering  |
4/12/2019  |
4/30/2019  |
  |
5/9/2019  |
APPR  |
CMK  |
Approved by Bus Lic (Sub List)  |
4/12/2019  |
11/20/2020  |
  |
11/20/2020  |
APPR  |
RHZ  |
Approved by Electrical  |
4/12/2019  |
  |
  |
4/26/2019 10:30:57 AM  |
APPR  |
MCS  |
Route to Electrical  |
4/12/2019  |
4/30/2019  |
  |
4/26/2019  |
APPR  |
MCS  |
Approved by Fire Department  |
4/12/2019  |
  |
  |
4/29/2019 3:35:15 PM  |
APPR  |
EPO  |
Route to Fire Department  |
4/12/2019  |
4/30/2019  |
  |
4/29/2019  |
APPR  |
EPO  |
Approved by Mechanical  |
4/12/2019  |
  |
  |
4/30/2019 7:47:32 AM  |
APPR  |
ITW  |
Route to Mechanical  |
4/12/2019  |
4/30/2019  |
  |
4/30/2019  |
APPR  |
ITW  |
Approved by Plumbing  |
4/12/2019  |
  |
  |
4/30/2019 7:47:14 AM  |
APPR  |
ITW  |
Route to Plumbing  |
4/12/2019  |
4/30/2019  |
  |
4/30/2019  |
APPR  |
ITW  |
Apprv. by PW Develop. Services  |
4/12/2019  |
  |
  |
4/29/2019 1:33:07 PM  |
APPR  |
SXA  |
Route to PW Develop. Services  |
4/12/2019  |
4/30/2019  |
  |
4/29/2019  |
APPR  |
SXA  |
Approved by Traffic Eng.  |
4/12/2019  |
  |
  |
5/7/2019 6:27:44 PM  |
APPR  |
RXC  |
Route to Traffic Engineering  |
4/12/2019  |
4/30/2019  |
  |
5/7/2019  |
APPR  |
RXC  |
Approved by C&D Waste Mgmt  |
4/12/2019  |
  |
  |
6/12/2019  |
APPR  |
OXM  |
Route to C&D Waste Mgmt  |
4/12/2019  |
4/30/2019  |
  |
6/12/2019  |
APPR  |
OXM  |
Route to Struct/Architectual  |
5/15/2019  |
5/31/2019  |
  |
6/3/2019  |
CORR  |
ITW  |
Route to C&D Waste Mgmt  |
5/15/2019  |
5/31/2019  |
  |
6/12/2019  |
APPR  |
OXM  |
Route to Struct/Architectual  |
6/12/2019  |
6/28/2019  |
  |
6/12/2019  |
APPR  |
ITW  |
BLD - Framing Insp.  |
6/22/2019 10:59:41 AM  |
6/24/2019  |
10 AM - 2 PM  |
6/24/2019  |
P  |
PJJ  |
BLD - Framing Insp.  |
7/2/2019 6:48:33 PM  |
7/3/2019  |
8 AM - 12 PM  |
7/3/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
7/3/2019 1:28:30 PM  |
7/5/2019  |
8 AM - 12 PM  |
7/5/2019  |
P  |
BEN  |
BLD - Reinforcing Insp  |
7/7/2019 7:37:08 PM  |
7/8/2019  |
10 AM - 2 PM  |
7/8/2019  |
N  |
PJJ  |
Route to Fire Department  |
7/15/2019  |
7/31/2019  |
  |
8/14/2019  |
APPR  |
EPO  |
Approved by Fire Department  |
7/15/2019  |
  |
  |
8/14/2019 12:56:22 PM  |
APPR  |
EPO  |
Route To Alternate MatL/Method  |
7/15/2019  |
7/31/2019  |
  |
8/1/2019  |
APPR  |
ITW  |
Approved Alternate MatL/Method  |
7/15/2019  |
  |
  |
8/1/2019  |
APPR  |
ITW  |
BLD - Framing Insp.  |
7/17/2019 3:43:05 PM  |
7/18/2019  |
12 PM - 3 PM  |
7/18/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
7/25/2019 3:36:19 PM  |
7/26/2019  |
  |
7/26/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
7/25/2019 3:39:13 PM  |
7/26/2019  |
  |
7/26/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
7/25/2019 3:40:36 PM  |
7/26/2019  |
  |
7/26/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
7/28/2019 2:03:43 PM  |
7/29/2019  |
10 AM - 2 PM  |
7/29/2019  |
P  |
PJJ  |
Approved Revision Electrical  |
  |
  |
  |
8/9/2019  |
APPR  |
MCS  |
Route Revision Electrical  |
7/29/2019  |
8/14/2019  |
  |
8/9/2019  |
APPR  |
MCS  |
Approved by Elec Engineering  |
7/29/2019  |
  |
  |
8/13/2019 8:42:36 AM  |
APPR  |
JMC  |
Route to Elec Engineering  |
7/29/2019  |
8/14/2019  |
  |
8/13/2019  |
APPR  |
JMC  |
Approved by Fire Department  |
7/29/2019  |
  |
  |
8/14/2019 12:56:52 PM  |
APPR  |
EPO  |
Route to Fire Department  |
7/29/2019  |
8/14/2019  |
  |
8/14/2019  |
APPR  |
EPO  |
Approved Revision Mechanical  |
  |
  |
  |
8/8/2019  |
DONE  |
EWC  |
Route Revision Mechanical  |
7/29/2019  |
8/14/2019  |
  |
8/8/2019  |
NR  |
EWC  |
Approved by Planning Zoning  |
7/29/2019  |
  |
  |
7/31/2019 9:21:05 AM  |
APPR  |
EYT  |
Route to Planning Zoning  |
7/29/2019  |
8/14/2019  |
  |
7/31/2019  |
APPR  |
EYT  |
Approved Revision Plumbing  |
  |
  |
  |
8/8/2019  |
DONE  |
EWC  |
Route Revision Plumbing  |
7/29/2019  |
8/14/2019  |
  |
8/8/2019  |
NR  |
EWC  |
Approved Revision Structural  |
7/29/2019  |
  |
  |
8/1/2019  |
DONE  |
ITW  |
Route Revision Structural  |
7/29/2019  |
8/14/2019  |
  |
8/1/2019  |
APPR  |
ITW  |
BLD - Framing Insp.  |
7/29/2019 2:56:22 PM  |
7/30/2019  |
  |
7/30/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
7/29/2019 2:56:56 PM  |
7/30/2019  |
  |
7/30/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
7/30/2019 4:53:32 PM  |
7/31/2019  |
  |
7/31/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
7/30/2019 4:54:10 PM  |
7/31/2019  |
  |
7/31/2019  |
C  |
BEN  |
BLD - Insulation Insp  |
7/31/2019 5:15:27 PM  |
8/1/2019  |
  |
8/1/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
7/31/2019 5:15:38 PM  |
8/1/2019  |
  |
8/1/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/1/2019 5:55:14 PM  |
8/2/2019  |
  |
8/2/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
8/6/2019 4:43:31 PM  |
8/7/2019  |
8 AM - 12 PM  |
8/7/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
8/6/2019 4:43:47 PM  |
8/7/2019  |
8 AM - 12 PM  |
8/7/2019  |
P  |
BEN  |
BLD - Penetrations -Fire Rated  |
8/6/2019 4:44:00 PM  |
8/7/2019  |
8 AM - 12 PM  |
8/7/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
8/7/2019 4:55:59 PM  |
8/8/2019  |
  |
8/8/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
8/8/2019 5:34:28 PM  |
8/9/2019  |
10 AM - 2 PM  |
8/9/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
8/8/2019 5:34:37 PM  |
8/9/2019  |
10 AM - 2 PM  |
8/9/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
8/9/2019 2:54:13 PM  |
8/12/2019  |
10 AM - 2 PM  |
8/12/2019  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/13/2019 3:33:24 PM  |
8/14/2019  |
  |
8/14/2019  |
N  |
BEN  |
BLD - Framing Insp.  |
8/14/2019 4:08:28 PM  |
8/15/2019  |
12 PM - 3 PM  |
8/15/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
8/15/2019 4:39:46 PM  |
8/16/2019  |
  |
8/16/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
8/15/2019 4:40:06 PM  |
8/16/2019  |
  |
8/16/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
8/18/2019 6:53:14 PM  |
8/19/2019  |
10 AM - 2 PM  |
8/19/2019  |
N  |
PJJ  |
BLD - Framing Insp.  |
8/19/2019 2:16:25 PM  |
8/20/2019  |
12 PM - 3 PM  |
8/20/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
8/19/2019 2:16:48 PM  |
8/20/2019  |
12 PM - 3 PM  |
8/20/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
8/20/2019 3:44:03 PM  |
8/21/2019  |
  |
8/21/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
8/20/2019 3:44:10 PM  |
8/21/2019  |
  |
8/21/2019  |
N  |
BEN  |
BLD - Framing Insp.  |
8/22/2019 3:11:56 PM  |
8/23/2019  |
12 PM - 3 PM  |
8/23/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
8/25/2019 5:36:13 PM  |
8/26/2019  |
10 AM - 2 PM  |
8/26/2019  |
P  |
PJJ  |
BLD - Framing Insp.  |
8/26/2019 3:07:56 PM  |
8/27/2019  |
10 AM - 2 PM  |
8/27/2019  |
P  |
PJJ  |
BLD - Insulation Insp  |
8/26/2019 3:08:23 PM  |
8/27/2019  |
10 AM - 2 PM  |
8/27/2019  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/26/2019 3:08:41 PM  |
8/27/2019  |
10 AM - 2 PM  |
8/27/2019  |
P  |
PJJ  |
BLD - Drywall Inspection  |
8/27/2019 3:44:40 PM  |
8/28/2019  |
  |
8/28/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
9/5/2019 3:24:20 PM  |
9/6/2019  |
12 PM - 3 PM  |
9/6/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
9/6/2019 2:27:42 PM  |
9/9/2019  |
10 AM - 2 PM  |
9/9/2019  |
N  |
PJJ  |
BLD - Framing Insp.  |
9/6/2019 2:27:53 PM  |
9/9/2019  |
10 AM - 2 PM  |
9/9/2019  |
N  |
PJJ  |
BLD - Framing Insp.  |
9/9/2019 3:35:44 PM  |
9/10/2019  |
12 PM - 3 PM  |
9/10/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
9/9/2019 3:35:53 PM  |
9/10/2019  |
12 PM - 3 PM  |
9/10/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
9/10/2019 2:46:41 PM  |
9/11/2019  |
12 PM - 3 PM  |
9/11/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
9/10/2019 2:46:49 PM  |
9/11/2019  |
12 PM - 3 PM  |
9/11/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
9/11/2019 3:44:02 PM  |
9/12/2019  |
8 AM - 12 PM  |
9/12/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
9/12/2019 3:04:31 PM  |
9/13/2019  |
12 PM - 3 PM  |
9/13/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
9/14/2019 9:58:13 AM  |
9/16/2019  |
10 AM - 2 PM  |
9/16/2019  |
N  |
PJJ  |
BLD - Drywall Inspection  |
9/16/2019 3:19:28 PM  |
9/17/2019  |
12 PM - 3 PM  |
9/17/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
9/17/2019 3:09:16 PM  |
9/18/2019  |
12 PM - 3 PM  |
9/18/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
9/18/2019 3:34:05 PM  |
9/19/2019  |
12 PM - 3 PM  |
9/19/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
9/18/2019 3:34:28 PM  |
9/19/2019  |
12 PM - 3 PM  |
9/19/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
9/19/2019 4:27:04 PM  |
9/20/2019  |
12 PM - 3 PM  |
9/20/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
9/20/2019 3:06:35 PM  |
9/23/2019  |
10 AM - 2 PM  |
9/23/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
9/20/2019 3:06:46 PM  |
9/23/2019  |
10 AM - 2 PM  |
9/23/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
9/23/2019 3:06:08 PM  |
9/24/2019  |
12 PM - 3 PM  |
9/24/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
9/23/2019 3:06:19 PM  |
9/24/2019  |
12 PM - 3 PM  |
9/24/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
9/24/2019 2:22:01 PM  |
9/25/2019  |
12 PM - 3 PM  |
9/25/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
9/24/2019 2:22:08 PM  |
9/25/2019  |
12 PM - 3 PM  |
9/25/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
9/25/2019 6:07:58 PM  |
9/26/2019  |
  |
9/26/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
9/25/2019 6:08:17 PM  |
9/26/2019  |
  |
9/26/2019  |
N  |
BEN  |
BLD - Framing Insp.  |
9/26/2019 8:09:11 PM  |
9/27/2019  |
  |
9/27/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
9/26/2019 8:09:19 PM  |
9/27/2019  |
  |
9/27/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
9/30/2019 3:07:29 PM  |
10/1/2019  |
12 PM - 3 PM  |
10/1/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
9/30/2019 3:07:44 PM  |
10/1/2019  |
12 PM - 3 PM  |
10/1/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
10/1/2019 4:08:05 PM  |
10/2/2019  |
10 AM - 2 PM  |
10/2/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
10/1/2019 4:08:20 PM  |
10/2/2019  |
10 AM - 2 PM  |
10/2/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
10/2/2019 3:36:00 PM  |
10/3/2019  |
12 PM - 3 PM  |
10/3/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
10/3/2019 10:10:01 PM  |
10/4/2019  |
12 PM - 3 PM  |
10/4/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
10/5/2019 3:01:19 PM  |
10/7/2019  |
8 AM - 12 PM  |
10/7/2019  |
N  |
PJJ  |
BLD - Penetrations -Fire Rated  |
10/7/2019 2:49:03 PM  |
10/8/2019  |
10 AM - 2 PM  |
10/8/2019  |
P  |
PJJ  |
BLD - Drywall Inspection  |
10/7/2019 3:28:44 PM  |
10/8/2019  |
10 AM - 2 PM  |
10/8/2019  |
P  |
PJJ  |
BLD - Reinforcing Insp  |
10/7/2019 3:29:12 PM  |
10/8/2019  |
10 AM - 2 PM  |
10/8/2019  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
10/8/2019 3:47:35 PM  |
10/9/2019  |
12 PM - 3 PM  |
10/9/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
10/8/2019 3:47:44 PM  |
10/9/2019  |
12 PM - 3 PM  |
10/9/2019  |
P  |
BEN  |
BLD - Temp Elec Consideration  |
10/9/2019  |
10/9/2019  |
  |
10/9/2019  |
A  |
MBEN  |
BLD - Drywall Inspection  |
10/10/2019 3:59:52 PM  |
10/11/2019  |
12 PM - 3 PM  |
10/11/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
10/14/2019 2:45:24 PM  |
10/15/2019  |
12 PM - 3 PM  |
10/15/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
10/15/2019 5:14:20 PM  |
10/16/2019  |
12 PM - 3 PM  |
10/16/2019  |
C  |
BEN  |
BLD - Penetrations -Fire Rated  |
10/16/2019 3:06:56 PM  |
10/17/2019  |
12 PM - 3 PM  |
10/17/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
10/17/2019 3:14:31 PM  |
10/17/2019  |
  |
10/18/2019  |
C  |
BEN  |
BLD - Reinforcing Insp  |
10/21/2019 3:03:11 PM  |
10/22/2019  |
8 AM - 12 PM  |
10/22/2019  |
P  |
PJJ  |
BLD - Drywall Inspection  |
10/21/2019 3:03:22 PM  |
10/22/2019  |
8 AM - 12 PM  |
10/22/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
10/23/2019 3:11:46 PM  |
10/24/2019  |
  |
10/24/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
10/23/2019 3:11:57 PM  |
10/24/2019  |
  |
10/24/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
10/24/2019 3:21:31 PM  |
10/25/2019  |
12 PM - 3 PM  |
10/25/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
10/24/2019 3:21:40 PM  |
10/25/2019  |
12 PM - 3 PM  |
10/25/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
10/24/2019 3:21:46 PM  |
10/25/2019  |
12 PM - 3 PM  |
10/25/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/25/2019 2:47:13 PM  |
10/28/2019  |
10 AM - 2 PM  |
10/28/2019  |
N  |
JOS  |
BLD - Drywall Inspection  |
10/28/2019 3:04:06 PM  |
10/29/2019  |
10 AM - 2 PM  |
10/29/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
10/28/2019 3:04:21 PM  |
10/29/2019  |
10 AM - 2 PM  |
10/29/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
10/29/2019 2:54:10 PM  |
10/30/2019  |
12 PM - 3 PM  |
10/30/2019  |
N  |
BEN  |
BLD - Drywall Inspection  |
10/31/2019 3:19:38 PM  |
11/1/2019  |
  |
11/1/2019  |
P  |
BEN  |
BLD - Insulation Insp  |
11/3/2019 10:44:07 AM  |
11/4/2019  |
10 AM - 2 PM  |
11/4/2019  |
C  |
PJJ  |
BLD - Drywall Inspection  |
11/3/2019 10:44:16 AM  |
11/4/2019  |
10 AM - 2 PM  |
11/4/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
11/3/2019 10:44:30 AM  |
11/4/2019  |
10 AM - 2 PM  |
11/4/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
11/7/2019 3:17:17 PM  |
11/8/2019  |
12 PM - 3 PM  |
11/8/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/7/2019 3:17:30 PM  |
11/8/2019  |
12 PM - 3 PM  |
11/8/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
11/8/2019 3:02:26 PM  |
11/12/2019  |
10 AM - 2 PM  |
11/12/2019  |
N  |
PJJ  |
BLD - Exterior Brown Coat Insp  |
11/12/2019 9:25:15 PM  |
11/13/2019  |
  |
11/13/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
11/12/2019 9:25:30 PM  |
11/13/2019  |
  |
11/13/2019  |
C  |
BEN  |
BLD - Exterior Lath Insp  |
11/12/2019 9:26:00 PM  |
11/13/2019  |
  |
11/13/2019  |
P  |
BEN  |
BLD - Framing Insp.  |
11/14/2019 6:33:46 PM  |
11/15/2019  |
  |
11/15/2019  |
C  |
BEN  |
BLD - Floor Nailing  |
11/14/2019 8:40:44 PM  |
11/15/2019  |
  |
11/15/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/14/2019 8:42:02 PM  |
11/15/2019  |
  |
11/15/2019  |
C  |
BEN  |
BLD - Framing Insp.  |
11/16/2019 7:38:51 AM  |
11/18/2019  |
10 AM - 2 PM  |
11/18/2019  |
C  |
PJJ  |
BLD - Drywall Inspection  |
11/16/2019 7:39:01 AM  |
11/18/2019  |
10 AM - 2 PM  |
11/18/2019  |
C  |
PJJ  |
BLD - Framing Insp.  |
11/18/2019 2:24:22 PM  |
11/19/2019  |
  |
11/19/2019  |
N  |
GCT  |
BLD - Framing Insp.  |
11/20/2019 3:15:18 PM  |
11/21/2019  |
8 AM - 12 PM  |
11/21/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
11/21/2019 2:52:40 PM  |
11/22/2019  |
10 AM - 2 PM  |
11/22/2019  |
C  |
BEN  |
BLD - Drywall Inspection  |
11/24/2019 8:32:35 AM  |
11/25/2019  |
10 AM - 2 PM  |
11/25/2019  |
C  |
PJJ  |
BLD - Drywall Inspection  |
11/25/2019 2:01:35 PM  |
11/26/2019  |
10 AM - 2 PM  |
11/26/2019  |
P  |
BEN  |
BLD - Drywall Inspection  |
11/26/2019 3:02:03 PM  |
11/27/2019  |
8 AM - 12 PM  |
11/27/2019  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
12/17/2019 3:52:46 PM  |
12/18/2019  |
10 AM - 2 PM  |
12/18/2019  |
P  |
BEN  |
BLD - Exterior Lath Insp  |
12/24/2019 9:03:30 PM  |
12/26/2019  |
8 AM - 12 PM  |
12/26/2019  |
C  |
BEN  |
Approved Revision Electrical  |
  |
  |
  |
1/7/2020  |
CFC  |
MCS  |
Route Revision Electrical  |
1/7/2020  |
1/24/2020  |
  |
1/7/2020  |
APPR  |
MCS  |
Approved Revision Electrical  |
1/7/2020  |
  |
  |
1/7/2020  |
DONE  |
MCS  |
BLD - Reinforcing Insp  |
1/7/2020 4:16:17 PM  |
1/8/2020  |
10 AM - 2 PM  |
1/8/2020  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
1/30/2020 3:21:11 PM  |
1/31/2020  |
  |
1/31/2020  |
N  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/6/2020 3:27:56 PM  |
2/7/2020  |
12 PM - 3 PM  |
2/7/2020  |
N  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/10/2020 3:59:10 PM  |
2/11/2020  |
12 PM - 3 PM  |
2/11/2020  |
N  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/11/2020 4:20:12 PM  |
2/12/2020  |
10 AM - 2 PM  |
2/12/2020  |
N  |
BEN  |
BLD - Framing Insp.  |
2/11/2020 4:20:26 PM  |
2/12/2020  |
10 AM - 2 PM  |
2/12/2020  |
N  |
BEN  |
BLD - Drywall Inspection  |
2/11/2020 4:20:40 PM  |
2/12/2020  |
10 AM - 2 PM  |
2/12/2020  |
C  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/12/2020 3:33:15 PM  |
2/13/2020  |
  |
2/13/2020  |
N  |
BEN  |
BLD - Framing Insp.  |
2/13/2020 4:38:53 PM  |
2/14/2020  |
12 PM - 3 PM  |
2/14/2020  |
P  |
BEN  |
BLD - Drywall Inspection  |
2/13/2020 4:39:08 PM  |
2/14/2020  |
12 PM - 3 PM  |
2/14/2020  |
P  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/17/2020 3:31:15 PM  |
2/18/2020  |
10 AM - 2 PM  |
2/18/2020  |
P  |
PJJ  |
BLD - Exterior Lath Insp  |
2/18/2020 2:34:35 PM  |
2/19/2020  |
8 AM - 12 PM  |
2/19/2020  |
P  |
PJJ  |
BLD - Framing Insp.  |
2/19/2020 3:02:41 PM  |
2/20/2020  |
8 AM - 12 PM  |
2/20/2020  |
P  |
BEN  |
BLD - Drywall Inspection  |
2/19/2020 3:08:01 PM  |
2/20/2020  |
8 AM - 12 PM  |
2/20/2020  |
P  |
BEN  |
BLD - T-Bar (Structural) Insp  |
2/26/2020 4:18:37 PM  |
2/27/2020  |
10 AM - 2 PM  |
2/27/2020  |
P  |
PJJ  |
BLD - Framing Insp.  |
2/27/2020 4:27:50 PM  |
2/28/2020  |
10 AM - 2 PM  |
2/28/2020  |
C  |
PJJ  |
BLD - T-Bar (Structural) Insp  |
2/27/2020 4:28:27 PM  |
2/28/2020  |
10 AM - 2 PM  |
2/28/2020  |
P  |
PJJ  |
BLD - Penetrations -Fire Rated  |
3/4/2020 4:44:22 PM  |
3/5/2020  |
12 PM - 3 PM  |
3/5/2020  |
C  |
BEN  |
BLD - Penetrations -Fire Rated  |
3/5/2020 3:00:47 PM  |
3/6/2020  |
  |
3/6/2020  |
C  |
BEN  |
BLD - Penetrations -Fire Rated  |
3/9/2020 5:35:55 AM  |
3/10/2020  |
8 AM - 12 PM  |
3/10/2020  |
P  |
PJJ  |
BLD - Framing Insp.  |
3/30/2020 1:58:22 PM  |
3/31/2020  |
8 AM - 12 PM  |
3/31/2020  |
P  |
BEN  |
BLD - Framing Insp.  |
3/31/2020 12:29:11 PM  |
4/1/2020  |
12 PM - 3 PM  |
4/7/2020  |
P  |
BEN  |
Approved by Fire Department  |
4/21/2020  |
  |
  |
5/12/2020 11:00:00 AM  |
APPR  |
LIY  |
Route to Fire Department  |
4/21/2020  |
5/12/2020  |
  |
5/12/2020  |
APPR  |
LIY  |
Approved Revision Structural  |
4/21/2020  |
  |
  |
5/4/2020  |
DONE  |
ITW  |
Route Revision Structural  |
4/21/2020  |
5/12/2020  |
  |
5/4/2020  |
APPR  |
ITW  |
Route to Struct/Architectual  |
10/1/2020  |
10/19/2020  |
  |
10/16/2020  |
CORR  |
ITW  |
Apprv. by Struct/Architectural  |
10/1/2020  |
  |
  |
11/2/2020 2:52:42 PM  |
APPR  |
ITW  |
Approved Revision Structural  |
10/2/2020  |
  |
  |
11/2/2020  |
APPR  |
ITW  |
Route Revision Structural  |
10/2/2020  |
10/20/2020  |
  |
10/14/2020  |
CORR  |
ITW  |
BLD - Framing Insp.  |
10/13/2020 2:21:16 PM  |
10/14/2020  |
12 PM - 3 PM  |
10/14/2020  |
C  |
BEN  |
BLD - Drywall Inspection  |
10/13/2020 2:23:10 PM  |
10/14/2020  |
12 PM - 3 PM  |
10/14/2020  |
C  |
BEN  |
Route to Struct/Architectual  |
10/15/2020  |
11/2/2020  |
  |
11/2/2020  |
APPR  |
ITW  |
BLD - Footings Insp  |
10/15/2020 4:08:24 PM  |
10/20/2020  |
8 AM - 12 PM  |
10/20/2020  |
A  |
BEN  |
BLD - Framing Insp.  |
10/15/2020 4:08:56 PM  |
10/20/2020  |
8 AM - 12 PM  |
10/20/2020  |
A  |
BEN  |
BLD - Drywall Inspection  |
10/15/2020 4:09:56 PM  |
10/20/2020  |
8 AM - 12 PM  |
10/20/2020  |
A  |
BEN  |
Route to Struct/Architectual  |
10/26/2020  |
11/12/2020  |
  |
11/2/2020  |
CORR  |
ITW  |
Apprv. by Struct/Architectural  |
10/26/2020  |
  |
  |
11/23/2020  |
APPR  |
ITW  |
Route to Struct/Architectual  |
10/23/2020  |
11/10/2020  |
  |
11/4/2020  |
APPR  |
ITW  |
Approved Revision Structural  |
10/29/2020  |
  |
  |
11/6/2020  |
DONE  |
ITW  |
Route Revision Structural  |
10/29/2020  |
11/17/2020  |
  |
11/6/2020  |
APPR  |
ITW  |
Approved Revision Electrical  |
  |
  |
  |
11/6/2020  |
APPR  |
ITW  |
Route Revision Electrical  |
10/29/2020  |
11/17/2020  |
  |
11/12/2020  |
APPR  |
JFR  |
Route to Fire Department  |
10/29/2020  |
11/17/2020  |
  |
11/16/2020  |
APPR  |
DRZ  |
Approved by Fire Department  |
10/29/2020  |
  |
  |
11/16/2020 3:20:11 PM  |
APPR  |
DRZ  |
Route to Struct/Architectual  |
11/9/2020  |
11/30/2020  |
  |
11/23/2020  |
APPR  |
ITW  |
Route to Fire Department  |
11/16/2020  |
12/4/2020  |
  |
11/25/2020  |
APPR  |
DRZ  |
Approved Alternate MatL/Method  |
11/16/2020  |
  |
  |
12/3/2020  |
DONE  |
AJP2  |
Route To Alternate MatL/Method  |
11/16/2020  |
12/4/2020  |
  |
12/3/2020  |
APPR  |
AJP2  |
BLD - Framing Insp.  |
11/19/2020 4:02:45 PM  |
11/20/2020  |
12 PM - 3 PM  |
11/24/2020  |
P  |
BEN  |
BLD - Framing Insp.  |
11/20/2020  |
11/23/2020  |
  |
11/24/2020  |
P  |
BEN  |
BLD - Framing Insp.  |
11/23/2020 4:28:15 PM  |
11/24/2020  |
12 PM - 3 PM  |
11/24/2020  |
P  |
BEN  |
Approved Revision Structural  |
11/25/2020  |
  |
  |
12/3/2020  |
APPR  |
ITW  |
Route Revision Structural  |
11/25/2020  |
12/15/2020  |
  |
12/3/2020  |
APPR  |
ITW  |
Approved by Fire Department  |
11/25/2020  |
  |
  |
11/25/2020 1:46:37 PM  |
APPR  |
DRZ  |
Route to Fire Department  |
11/25/2020  |
12/15/2020  |
  |
11/25/2020  |
APPR  |
DRZ  |
Inspection by Fire Department  |
11/25/2020  |
12/15/2020  |
  |
12/2/2020  |
DONE  |
638  |
Inspection by Fire Department  |
11/25/2020  |
12/15/2020  |
  |
12/2/2020  |
DONE  |
638  |
BLD - Framing Insp.  |
11/30/2020 3:05:06 PM  |
12/1/2020  |
8 AM - 12 PM  |
12/1/2020  |
C  |
BEN  |
BLD - Misc. Inspection  |
12/2/2020  |
12/3/2020  |
12 PM - 3 PM  |
12/3/2020  |
DONE  |
BEN  |
Building Final Insp Request  |
12/3/2020  |
12/4/2020  |
10 AM - 2 PM  |
12/4/2020  |
A  |
BEN  |
Building Final Insp Request  |
12/3/2020 5:37:22 PM  |
12/3/2020  |
  |
  |
  |
  |
Building Final  |
  |
  |
  |
12/4/2020  |
  |
BEN  |