Permit Number:  BLD2016-03145     Status:   Finaled     Map Info:   1910 S UNION ST
Name: JEFFERSON AT STADIUM PARK -- PHASE B, L.P.
Address: 1910 S UNION
Received Date: 06/28/2016 
Parcel: 08329088 
Plan Check Date:  
Issue Date: 12/06/2017 
Expiration Date: 09/06/2020 
Finaled Date: 07/09/2020 
Description: Accessory Building: New 244,696 sq. ft. parking structure "B" with 8,778 amenity deck  

Activities
Type  Requested  Scheduled  Time of Inspection  Completed  Disposition  Employee 
Route to Struct/Architectual  6/28/2016  8/3/2016    8/3/2016  CORR  BVD 
Apprv. by Struct/Architectural  6/28/2016      12/21/2016  APPR  BVD 
Route to Planning Zoning  6/28/2016  8/3/2016    8/23/2016  CORR  GSK 
Approved by Planning Zoning  6/28/2016      12/21/2016 9:26:55 AM  APPR  GSK 
Route to Electrical  6/28/2016  8/3/2016    8/3/2016  CORR  BVD 
Approved by Electrical  6/28/2016      12/1/2016 1:47:56 PM  APPR  BVD 
Route to Fire Department  6/28/2016  8/3/2016    8/24/2016  CORR  408 
Approved by Fire Department  6/28/2016      9/26/2016 10:47:52 AM  APPR  408 
Route to Mechanical  6/28/2016  8/3/2016    8/3/2016  CORR  BVD 
Approved by Mechanical  6/28/2016      12/1/2016 1:48:22 PM  APPR  BVD 
Route to Plumbing  6/28/2016  8/3/2016    8/3/2016  CORR  BVD 
Approved by Plumbing  6/28/2016      12/1/2016 1:48:37 PM  APPR  BVD 
Route to Traffic Engineering  6/28/2016  8/3/2016    8/9/2016  CORR  DJK 
Approved by Traffic Eng.  6/28/2016      12/21/2016 2:37:01 PM  APPR  QML 
Route to PW Develop. Services  6/28/2016  8/3/2016    8/10/2016  CORR  SXA 
Apprv. by PW Develop. Services  6/28/2016           
Route to Elec Engineering  6/28/2016  8/3/2016    8/16/2016  CORR  CMK 
Approved by Elec Engineering  6/28/2016      12/6/2016 6:07:20 AM  APPR  CMK 
Route to Water Engineering  6/28/2016  8/3/2016    8/1/2016  APPR  DRS 
Approved by Water Engineering  6/28/2016      8/1/2016 4:19:14 PM  APPR  DRS 
Route to Addressing  6/28/2016  8/3/2016    7/6/2016 10:14:46 AM  APPR  HXN 
Approved by Addressing  6/28/2016      7/6/2016 10:14:47 AM  APPR  HXN 
Route to PW Operations  6/28/2016  8/3/2016    8/17/2016  NR  LMM 
Approved by PW Operations  6/28/2016      8/17/2016 10:40:54 AM  NR  LMM 
FIRE - Create BFP case  8/24/2016      8/24/2016  DONE  408 
Inspection by Fire Department  8/24/2016  9/12/2016    5/27/2020  DONE  ABAD 
Route to Elec Engineering  8/24/2016  9/12/2016    9/7/2016  CORR  CMK 
Route to Electrical  8/24/2016  9/12/2016    9/12/2016  CORR  BVD 
Route to Fire Department  8/24/2016  9/12/2016    9/26/2016  APPR  408 
Route to Mechanical  8/24/2016  9/12/2016    9/12/2016  CORR  BVD 
Route to Planning Zoning  8/24/2016  9/12/2016    9/29/2016  CORR  GSK 
Route to Plumbing  8/24/2016  9/12/2016    9/12/2016  CORR  BVD 
Route to PW Develop. Services  8/24/2016  9/12/2016    9/22/2016  CORR  SXA 
Route to PW Operations  8/24/2016  9/12/2016    8/17/2016  NR  LMM 
Route to Traffic Engineering  8/24/2016  9/12/2016    9/9/2016  CORR  DJK 
Route to Struct/Architectual  8/24/2016  9/12/2016    9/12/2016  CORR  BVD 
Route to Electrical  10/12/2016  10/28/2016    10/27/2016  CORR  BVD 
Route to Elec Engineering  10/12/2016  10/28/2016    10/25/2016  CORR  CMK 
Route to Mechanical  10/12/2016  10/28/2016    10/27/2016  CORR  BVD 
Route to Planning Zoning  10/12/2016  10/28/2016    10/31/2016  CORR  GSK 
Route to Plumbing  10/12/2016  10/28/2016    10/27/2016  CORR  BVD 
Route to PW Develop. Services  10/12/2016  10/28/2016    11/14/2016  CORR  CJO 
Route to Struct/Architectual  10/12/2016  10/28/2016    10/27/2016  CORR  BVD 
Route to Traffic Engineering  10/12/2016  10/28/2016    12/6/2016  CORR  DJK 
Route to Electrical  11/14/2016  12/2/2016    12/1/2016  APPR  BVD 
Route to Elec Engineering  11/14/2016  12/2/2016    12/6/2016  APPR  CMK 
Route to Mechanical  11/14/2016  12/2/2016    12/1/2016  APPR  BVD 
Route to Planning Zoning  11/14/2016  12/2/2016    12/21/2016  APPR  GSK 
Route to Plumbing  11/14/2016  12/2/2016    12/1/2016  APPR  BVD 
Route to PW Develop. Services  11/14/2016  12/2/2016    12/7/2016  CORR  SXA 
Route to PW Operations  11/14/2016  12/2/2016    12/1/2016  NR  LMM 
Route to Struct/Architectual  11/14/2016  12/2/2016    12/1/2016  CORR  BVD 
Route to Traffic Engineering  11/14/2016  12/2/2016    12/6/2016  CORR  DJK 
Route to Struct/Architectual  12/21/2016  1/10/2017    12/21/2016  APPR  BVD 
Route to Traffic Engineering  12/21/2016  1/10/2017    12/21/2016  APPR  QML 
Route Revision Mechanical  7/28/2017  9/8/2017    9/7/2017  APPR  BVD 
Route Revision Electrical  7/28/2017  9/8/2017    9/7/2017  APPR  BVD 
Route Revision Structural  7/28/2017  9/8/2017    9/7/2017  CORR  BVD 
Route to Planning Zoning  7/28/2017  8/15/2017    9/14/2017  APPR  GSK 
Approved by Planning Zoning  7/28/2017      9/14/2017 11:58:43 AM  APPR  GSK 
BLD - Footings Insp  9/25/2017 10:44:04 AM  9/28/2017  8 AM - 12 PM  9/28/2017  BIH 
BLD - Footings Insp  9/25/2017 10:47:41 AM  9/29/2017  8 AM - 12 PM  9/29/2017  BIH 
BLD - Reinforcing Insp  10/4/2017 12:53:55 PM  10/5/2017  12 PM - 3 PM  10/5/2017  BIH 
Approved Revision Electrical        9/7/2017  APPR  BVD 
Approved Revision Mechanical        9/7/2017  APPR  BVD 
BLD - Reinforcing Insp  10/6/2017 1:30:31 PM  10/9/2017  8 AM - 12 PM  10/9/2017  BIH 
BLD - Reinforcing Insp  10/6/2017 1:31:30 PM  10/10/2017  8 AM - 12 PM  10/10/2017  BIH 
BLD - Reinforcing Insp  10/10/2017 2:24:45 PM  10/11/2017  8 AM - 12 PM  10/11/2017  BIH 
Route Revision Structural  10/10/2017  11/7/2017    10/12/2017  APPR  BVD 
BLD - Footings Insp  10/11/2017 7:33:19 AM  10/12/2017  8 AM - 12 PM  10/12/2017  BIH 
BLD - Reinforcing Insp  10/12/2017 8:53:05 AM  10/13/2017  10 AM - 2 PM  10/13/2017  BIH 
BLD - Reinforcing Insp  10/16/2017 1:07:52 PM  10/17/2017  10 AM - 2 PM  10/17/2017  BIH 
BLD - Reinforcing Insp  10/18/2017 9:35:51 AM  10/19/2017  10 AM - 2 PM  10/19/2017  BIH 
BLD - Reinforcing Insp  10/18/2017 6:28:02 PM  10/20/2017  10 AM - 2 PM  10/20/2017  BIH 
BLD - 1st Floor Shear Insp  10/23/2017  10/24/2017  8 AM - 12 PM  10/24/2017  BIH 
BLD - Pre-Grout Insp  10/23/2017  10/24/2017  8 AM - 12 PM  10/24/2017  BIH 
BLD - 1st Floor Shear Insp  10/23/2017  10/25/2017  12 PM - 3 PM  10/25/2017  BIH 
BLD - Pre-Grout Insp  10/23/2017  10/25/2017  12 PM - 3 PM  10/25/2017  BIH 
BLD - 1st Floor Shear Insp  10/25/2017 10:37:38 AM  10/26/2017  12 PM - 3 PM  10/26/2017  BIH 
BLD - 1st Floor Shear Insp  10/25/2017 10:40:27 AM  10/27/2017  10 AM - 2 PM  10/27/2017  BIH 
BLD - 1st Floor Shear Insp  10/30/2017 6:34:13 AM  10/31/2017  8 AM - 12 PM  10/31/2017  BIH 
BLD - Pre-Grout Insp  10/30/2017 8:46:52 AM  10/31/2017  8 AM - 12 PM  10/31/2017  BIH 
BLD - Pre-Grout Insp  10/30/2017 8:47:33 AM  11/1/2017  8 AM - 12 PM  11/1/2017  BIH 
BLD - Pre-Grout Insp  10/30/2017 8:49:15 AM  11/2/2017  8 AM - 12 PM  11/2/2017  BIH 
PLM - Ground/Underfloor water  10/31/2017 2:18:09 PM  11/1/2017  8 AM - 12 PM  11/1/2017  BIH 
PLM - Ground/Underfloor water  11/1/2017 9:37:56 AM  11/2/2017  8 AM - 12 PM  11/2/2017  BIH 
BLD - Pre-Grout Insp  11/3/2017 10:11:19 AM  11/6/2017  8 AM - 12 PM  11/6/2017  BIH 
BLD - Reinforcing Insp  11/3/2017 10:12:10 AM  11/6/2017  8 AM - 12 PM  11/6/2017  BIH 
ELE - Underground conduit  11/3/2017 2:43:46 PM  11/6/2017  8 AM - 12 PM  11/6/2017  BIH 
ELE - Underground conduit  11/3/2017 2:44:40 PM  11/7/2017  8 AM - 12 PM  11/7/2017  BIH 
ELE - Underground conduit  11/6/2017 2:57:51 PM  11/8/2017  8 AM - 12 PM  11/8/2017  BIH 
PLM - Ground/Underfloor water  11/7/2017 1:27:08 PM  11/8/2017  8 AM - 12 PM  11/8/2017  BIH 
ELE - Underground conduit  11/8/2017  11/9/2017  12 PM - 3 PM  11/9/2017  BIH 
BLD - Pre-Grout Insp  11/8/2017 3:24:21 PM  11/9/2017  12 PM - 3 PM  11/9/2017  BIH 
BLD - Pre-Grout Insp  11/9/2017 12:59:58 PM  11/13/2017  8 AM - 12 PM  11/13/2017  BIH 
BLD - Reinforcing Insp  11/9/2017 1:00:28 PM  11/13/2017  8 AM - 12 PM  11/13/2017  BIH 
PLM - Ground/Underfloor waste  11/9/2017 3:14:29 PM  11/13/2017  8 AM - 12 PM  11/13/2017  BIH 
Route to Struct/Architectual  11/13/2017  12/1/2017    11/28/2017  APPR  BVD 
Apprv. by Struct/Architectural  11/13/2017      11/28/2017 6:42:57 AM  APPR  BVD 
BLD - Reinforcing Insp  11/15/2017 10:28:38 AM  11/16/2017  12 PM - 3 PM  11/16/2017  BIH 
BLD - Pre-Grout Insp  11/15/2017 12:51:18 PM  11/16/2017  12 PM - 3 PM  11/16/2017  BIH 
BLD - Pre-Grout Insp  11/15/2017 2:04:35 PM  11/17/2017  12 PM - 3 PM  11/17/2017  BIH 
BLD - Pre-Grout Insp  11/20/2017 11:32:43 AM  11/21/2017  8 AM - 12 PM  11/21/2017  BIH 
BLD - Pre-Grout Insp  11/21/2017 7:37:07 AM  11/22/2017  8 AM - 12 PM  11/22/2017  BIH 
PLM - Water Service  11/28/2017 2:50:08 PM  11/29/2017  8 AM - 12 PM  11/29/2017  BIH 
BLD - Reinforcing Insp  12/1/2017 11:36:45 AM  12/5/2017  12 PM - 3 PM  12/5/2017  BIH 
Route To Alternate MatL/Method        12/18/2017  CORR  GAQ 
Approved Alternate MatL/Method  12/14/2017      12/26/2017  DONE  GAQ 
BLD - Reinforcing Insp  12/8/2017 11:52:15 AM  12/11/2017  10 AM - 2 PM  12/11/2017  BIH 
BLD - Reinforcing Insp  12/11/2017 1:47:42 PM  12/12/2017  8 AM - 12 PM  12/12/2017  BIH 
BLD - Reinforcing Insp  12/13/2017 8:46:50 AM  12/14/2017  10 AM - 2 PM  12/14/2017  BIH 
BLD - Reinforcing Insp  12/13/2017 1:00:05 PM  12/18/2017  12 PM - 3 PM  12/18/2017  BIH 
BLD - Reinforcing Insp  12/20/2017 12:55:51 PM  12/21/2017  10 AM - 2 PM  12/21/2017  BIH 
BLD - Reinforcing Insp  12/20/2017 12:57:34 PM  12/22/2017  10 AM - 2 PM  12/22/2017  BIH 
BLD - Reinforcing Insp  12/22/2017 9:47:24 AM  12/26/2017  10 AM - 2 PM  12/26/2017  BIH 
BLD - Pre-Grout Insp  12/22/2017 9:48:50 AM  12/26/2017  10 AM - 2 PM  12/26/2017  BIH 
BLD - Reinforcing Insp  12/22/2017 9:49:04 AM  12/27/2017  8 AM - 12 PM  12/27/2017  BIH 
BLD - Pre-Grout Insp  12/22/2017 9:49:14 AM  12/27/2017  8 AM - 12 PM  12/27/2017  BIH 
BLD - Pre-Grout Insp  12/29/2017 10:05:03 AM  1/3/2018  8 AM - 12 PM  1/3/2018  BIH 
BLD - Pre-Grout Insp  1/3/2018 9:58:13 AM  1/5/2018  8 AM - 12 PM  1/5/2018  BIH 
BLD - Reinforcing Insp  1/4/2018 10:41:42 AM  1/10/2018  10 AM - 2 PM  1/10/2018  BIH 
Route to Elec Engineering  1/4/2018  1/23/2018    1/9/2018  APPR  NEG 
Approved by Elec Engineering  1/4/2018      1/9/2018 8:25:21 AM  APPR  NEG 
Route Revision Electrical  1/4/2018  1/23/2018    1/23/2018  APPR  BVD 
Approved Revision Electrical        1/23/2018  APPR  BVD 
Route Revision Structural  1/4/2018  1/23/2018    1/23/2018  APPR  BVD 
Approved Revision Structural  1/4/2018      1/23/2018  APPR  BVD 
BLD - Reinforcing Insp  1/12/2018 9:07:38 AM  1/16/2018  8 AM - 12 PM  1/16/2018  BIH 
BLD - Reinforcing Insp  1/17/2018 11:51:10 AM  1/18/2018  8 AM - 12 PM  1/18/2018  BIH 
BLD - Reinforcing Insp  1/17/2018 12:55:08 PM  1/23/2018  10 AM - 2 PM  1/23/2018  BIH 
BLD - Reinforcing Insp  1/19/2018 12:15:17 PM  1/22/2018  8 AM - 12 PM  1/22/2018  BIH 
BLD - Pre-Grout Insp  1/25/2018  1/26/2018  10 AM - 2 PM  1/26/2018  BIH 
BLD - Reinforcing Insp  1/26/2018  1/29/2018  10 AM - 2 PM  1/29/2018  BIH 
BLD - Reinforcing Insp  1/29/2018 9:21:43 AM  1/30/2018  8 AM - 12 PM  1/30/2018  BIH 
BLD - Reinforcing Insp  1/30/2018 3:09:47 PM  1/31/2018  8 AM - 12 PM  1/31/2018  BIH 
BLD - Pre-Grout Insp  2/6/2018 3:38:13 PM  2/7/2018  10 AM - 2 PM  2/7/2018  BIH 
BLD - Reinforcing Insp  2/9/2018 8:34:53 AM  2/13/2018  10 AM - 2 PM  2/13/2018  BIH 
BLD - Reinforcing Insp  2/14/2018 1:22:01 PM  2/15/2018  10 AM - 2 PM  2/15/2018  PJJ 
BLD - Reinforcing Insp  2/14/2018 1:23:10 PM  2/16/2018  8 AM - 12 PM  2/16/2018  JOS 
BLD - Reinforcing Insp  2/20/2018 3:52:10 PM  2/21/2018  8 AM - 12 PM  2/21/2018  BIH 
BLD - Reinforcing Insp  2/23/2018 2:31:20 PM  2/26/2018  10 AM - 2 PM  2/26/2018  BIH 
BLD - Pre-Grout Insp  2/26/2018 1:45:18 PM  2/27/2018  8 AM - 12 PM  2/27/2018  BIH 
BLD - Pre-Grout Insp  3/5/2018 12:11:26 PM  3/6/2018  8 AM - 12 PM  3/6/2018  BCJ 
BLD - Reinforcing Insp  3/8/2018 2:05:49 PM  3/9/2018  10 AM - 2 PM  3/9/2018  BCJ 
BLD - Pre-Grout Insp  3/8/2018 2:08:01 PM  3/12/2018  10 AM - 2 PM  3/12/2018  BIH 
BLD - Reinforcing Insp  3/8/2018 2:10:35 PM  3/12/2018  10 AM - 2 PM  3/12/2018  BIH 
Apprv. by Struct/Architectural  3/13/2018      3/22/2018 5:40:28 AM  APPR  BVD 
Route to Struct/Architectual  3/13/2018  3/29/2018    3/22/2018  APPR  BVD 
BLD - Reinforcing Insp  3/14/2018 11:12:35 AM  3/15/2018  12 PM - 3 PM  3/15/2018  BIH 
BLD - Reinforcing Insp  3/16/2018 3:41:16 PM  3/19/2018  10 AM - 2 PM  3/19/2018  BIH 
BLD - Reinforcing Insp  3/19/2018 2:17:23 PM  3/20/2018  12 PM - 3 PM  3/20/2018  BIH 
BLD - Reinforcing Insp  3/20/2018 7:28:24 AM  3/21/2018  10 AM - 2 PM  3/21/2018  BIH 
BLD - Pre-Grout Insp  3/22/2018 7:58:18 AM  3/23/2018  8 AM - 12 PM  3/23/2018  BIH 
BLD - Pre-Grout Insp  3/23/2018 8:51:11 AM  3/26/2018  10 AM - 2 PM  3/26/2018  BIH 
BLD - Reinforcing Insp  3/26/2018  3/26/2018  10 AM - 2 PM  3/26/2018  BIH 
BLD - Reinforcing Insp  3/27/2018 10:09:51 AM  3/28/2018  8 AM - 12 PM  3/28/2018  BIH 
BLD - Reinforcing Insp  3/28/2018 2:39:35 PM  3/29/2018  10 AM - 2 PM  3/29/2018  BIH 
BLD - Pre-Grout Insp  3/30/2018  4/2/2018  12 PM - 3 PM  4/2/2018  BIH 
BLD - Pre-Slab Insp  4/3/2018 2:53:52 PM  4/4/2018  12 PM - 3 PM  4/4/2018  BIH 
BLD - Reinforcing Insp  4/10/2018 3:03:24 PM  4/11/2018  10 AM - 2 PM  4/11/2018  BIH 
Approved Revision Electrical        5/1/2018  APPR  BVD 
Route Revision Electrical  4/13/2018  5/1/2018    5/1/2018  APPR  BVD 
BLD - Pre-Slab Insp  4/18/2018 1:03:39 PM  4/19/2018  8 AM - 12 PM  4/19/2018  BIH 
BLD - Pre-Grout Insp  4/18/2018 1:05:12 PM  4/20/2018  10 AM - 2 PM  4/20/2018  BIH 
BLD - Pre-Slab Insp  5/1/2018 4:45:48 PM  5/2/2018  12 PM - 3 PM  5/2/2018  BIH 
BLD - Pre-Grout Insp  5/2/2018 3:09:22 PM  5/4/2018    5/4/2018  BIH 
BLD - Reinforcing Insp  5/4/2018 2:27:59 PM  5/7/2018  10 AM - 2 PM  5/7/2018  BIH 
BLD - Pre-Grout Insp  5/4/2018 3:02:34 PM  5/7/2018  10 AM - 2 PM  5/7/2018  BIH 
BLD - Reinforcing Insp  5/7/2018 5:12:13 PM  5/8/2018  10 AM - 2 PM  5/8/2018  BIH 
BLD - Pre-Grout Insp  5/7/2018 5:13:49 PM  5/8/2018  10 AM - 2 PM  5/8/2018  BIH 
BLD - Pre-Grout Insp  5/10/2018 7:22:49 AM  5/10/2018    7/12/2018  MMO 
BLD - Pre-Grout Insp  5/15/2018 1:35:40 PM  5/16/2018  10 AM - 2 PM  5/16/2018  BIH 
BLD - Pre-Grout Insp  5/15/2018 1:36:44 PM  5/17/2018  12 PM - 3 PM  5/17/2018  BIH 
Apprv. by Struct/Architectural  6/6/2018      7/3/2018 9:20:28 AM  APPR  BVD 
Route to Struct/Architectual  6/6/2018  6/22/2018    6/21/2018  CORR  BVD 
BLD - Reinforcing Insp  6/6/2018 12:20:55 PM  6/8/2018  10 AM - 2 PM  6/8/2018  BIH 
BLD - Reinforcing Insp  6/11/2018 11:06:38 AM  6/12/2018  12 PM - 3 PM  6/12/2018  BIH 
BLD - Pre-Grout Insp  6/19/2018 12:00:51 PM  6/20/2018  10 AM - 2 PM  6/20/2018  BIH 
BLD - Pre-Grout Insp  6/22/2018 1:38:18 PM  6/25/2018  10 AM - 2 PM  6/25/2018  BIH 
BLD - Pre-Grout Insp  6/28/2018 7:27:13 AM  6/29/2018  12 PM - 3 PM  6/29/2018  BIH 
Route to Struct/Architectual  6/28/2018  7/17/2018    7/3/2018  APPR  BVD 
BLD - Reinforcing Insp  7/23/2018 2:23:43 PM  7/24/2018  12 PM - 3 PM  7/24/2018  BIH 
Route to Struct/Architectual  8/28/2018  9/14/2018    9/13/2018  CORR  BVD 
Apprv. by Struct/Architectural  8/28/2018      11/9/2018  APPR  BVD 
Route Revision Structural  11/2/2018  11/21/2018    11/8/2018  APPR  BVD 
MEC - Rough Mechanical  6/6/2019 3:07:58 PM  6/7/2019  10 AM - 2 PM  6/7/2019  JOS 
ELE - Rough Electrical  6/6/2019 3:08:11 PM  6/7/2019  10 AM - 2 PM  6/7/2019  JOS 
PLM - Rough/Topout  6/6/2019 3:08:23 PM  6/7/2019  10 AM - 2 PM  6/7/2019  JOS 
BLD - Drywall Inspection  6/10/2019 3:45:57 PM  6/11/2019  10 AM - 2 PM  6/11/2019  BIH 
Approved by Bus Lic (Sub List)  6/13/2019  6/13/2019    12/12/2019  APPR  RHZ 
MEC - Rough Mechanical  7/1/2019 3:37:24 PM  7/2/2019  10 AM - 2 PM  7/2/2019  BIH 
ELE - Rough Electrical  7/1/2019 3:37:37 PM  7/2/2019  10 AM - 2 PM  7/2/2019  BIH 
PLM - Rough/Topout  7/1/2019 3:38:01 PM  7/2/2019  10 AM - 2 PM  7/2/2019  BIH 
BLD - Penetrations -Fire Rated  7/1/2019 3:38:15 PM  7/2/2019  10 AM - 2 PM  7/2/2019  BIH 
BLD - Drywall Inspection  7/12/2019 1:20:36 PM  7/15/2019  12 PM - 3 PM  7/15/2019  BIH 
BLD - TCO App Consideration  7/16/2019  7/16/2019    7/16/2019  DAL2 
Mechanical Final Insp Request  7/23/2019 4:45:12 PM  7/24/2019  8 AM - 12 PM  7/24/2019  BIH 
Electrical Final Insp Request  7/23/2019 4:45:20 PM  7/24/2019  8 AM - 12 PM  7/24/2019  BIH 
Plumbing Final Insp Request  7/23/2019 4:46:00 PM  7/24/2019  8 AM - 12 PM  7/24/2019  BIH 
Route Revision Plumbing  8/12/2019  8/14/2019    8/13/2019  APPR  EWC 
Approved Revision Plumbing        8/13/2019  APPR  EWC 
ELE - Rough Electrical  8/13/2019 3:48:31 PM  8/14/2019  8 AM - 12 PM  8/14/2019  BIH 
MEC - Rough Mechanical  8/13/2019 3:48:45 PM  8/14/2019  8 AM - 12 PM  8/14/2019  BIH 
PLM - Rough/Topout  8/13/2019 3:49:27 PM  8/14/2019  8 AM - 12 PM  8/14/2019  BIH 
BLD - TCO App Consideration  8/16/2019  8/19/2019  10 AM - 2 PM  8/19/2019  BIH 
Mechanical Final Insp Request  8/19/2019 3:37:47 PM  8/20/2019  10 AM - 2 PM  8/20/2019  BIH 
Electrical Final Insp Request  8/19/2019 3:37:58 PM  8/20/2019  10 AM - 2 PM  8/20/2019  BIH 
Plumbing Final Insp Request  8/19/2019 3:38:08 PM  8/20/2019  10 AM - 2 PM  8/20/2019  BIH 
Plumbing Final Insp Request  8/20/2019 3:11:02 PM  8/21/2019  10 AM - 2 PM  8/22/2019  BIH 
Electrical Final Insp Request  8/20/2019 3:11:12 PM  8/21/2019  10 AM - 2 PM  8/22/2019  BIH 
Mechanical Final Insp Request  8/20/2019 3:11:27 PM  8/21/2019  10 AM - 2 PM  8/22/2019  BIH 
BLD - TCO App Consideration  8/30/2019  9/3/2019  12 PM - 3 PM  9/3/2019  BIH 
Route to Planning Zoning  9/3/2019  9/19/2019    9/5/2019  NR  GSK 
Approved by Planning Zoning  9/3/2019      9/5/2019 2:13:28 PM  NR  GSK 
Approved Revision Structural  9/3/2019      9/6/2019  APPR  BVD 
Route Revision Structural  9/3/2019  9/19/2019    9/5/2019  CORR  BVD 
Route Revision Structural  9/5/2019  9/23/2019    9/6/2019  APPR  BVD 
BLD - TCO App Consideration  9/6/2019  9/9/2019  12 PM - 3 PM  9/9/2019  JOS 
Mechanical Final Insp Request  9/7/2019 11:17:39 AM  9/9/2019  12 PM - 3 PM  9/9/2019  JOS 
Electrical Final Insp Request  9/7/2019 11:17:52 AM  9/9/2019  12 PM - 3 PM  9/9/2019  JOS 
Plumbing Final Insp Request  9/7/2019 11:18:04 AM  9/9/2019  12 PM - 3 PM  9/9/2019  JOS 
BLD - TCO App Consideration  9/9/2019  9/10/2019  12 PM - 3 PM  9/10/2019  BIH 
BLD - TCO App Consideration  9/9/2019  9/10/2019  12 PM - 3 PM  9/10/2019  BIH 
Mechanical Final Insp Request  9/9/2019 3:50:33 PM  9/10/2019  12 PM - 3 PM  9/10/2019  BIH 
Electrical Final Insp Request  9/9/2019 3:50:42 PM  9/10/2019  12 PM - 3 PM  9/10/2019  BIH 
Plumbing Final Insp Request  9/9/2019 3:50:51 PM  9/10/2019  12 PM - 3 PM  9/10/2019  BIH 
BLD - Drywall Inspection  9/11/2019 3:34:21 PM  9/12/2019  10 AM - 2 PM  9/12/2019  BIH 
BLD - TCO App Consideration  9/11/2019  9/12/2019  10 AM - 2 PM  9/12/2019  BIH 
BLD - Drywall Inspection  9/17/2019 4:31:41 PM  9/18/2019  10 AM - 2 PM  9/18/2019  BIH 
BLD - Drywall Inspection  9/21/2019 10:01:58 AM  9/23/2019  10 AM - 2 PM  9/23/2019  BIH 
BLD - Drywall Inspection  9/23/2019 4:24:04 PM  9/24/2019  8 AM - 12 PM  9/24/2019  BIH 
BLD - TCO App Consideration  10/1/2019  10/2/2019  10 AM - 2 PM  10/2/2019  BIH 
Mechanical Final Insp Request  10/29/2019 3:35:19 PM  10/30/2019  10 AM - 2 PM  10/30/2019  BIH 
Electrical Final Insp Request  10/29/2019 3:35:29 PM  10/30/2019  10 AM - 2 PM  10/30/2019  BIH 
Plumbing Final Insp Request  10/29/2019 3:35:38 PM  10/30/2019  10 AM - 2 PM  10/30/2019  BIH 
BLD - TCO App Consideration  10/30/2019  10/31/2019  10 AM - 2 PM  10/31/2019  BIH 
Mechanical Final Insp Request  10/30/2019 4:08:18 PM  10/31/2019  10 AM - 2 PM  10/31/2019  BIH 
Electrical Final Insp Request  10/30/2019 4:08:42 PM  10/31/2019  10 AM - 2 PM  10/31/2019  BIH 
Plumbing Final Insp Request  10/30/2019 4:08:53 PM  10/31/2019  10 AM - 2 PM  10/31/2019  BIH 
Mechanical Final Insp Request  11/26/2019 3:11:31 PM  11/27/2019  10 AM - 2 PM  11/27/2019  BIH 
Electrical Final Insp Request  11/26/2019 3:11:41 PM  11/27/2019  10 AM - 2 PM  11/27/2019  BIH 
Plumbing Final Insp Request  11/26/2019 3:12:34 PM  11/27/2019  10 AM - 2 PM  11/27/2019  BIH 
Mechanical Final Insp Request  11/27/2019 12:31:45 PM  12/2/2019  10 AM - 2 PM  12/3/2019  BIH 
Electrical Final Insp Request  11/27/2019 12:31:54 PM  12/2/2019  10 AM - 2 PM  12/3/2019  BIH 
Plumbing Final Insp Request  11/27/2019 12:32:07 PM  12/2/2019  10 AM - 2 PM  11/27/2019  DONE  BIH 
BLD - TCO App Consideration  11/27/2019  12/2/2019  10 AM - 2 PM  12/3/2019  BIH 
Mechanical Final Insp Request  12/2/2019 4:18:28 PM  12/3/2019  10 AM - 2 PM  12/3/2019  BIH 
Electrical Final Insp Request  12/2/2019 4:18:38 PM  12/3/2019  10 AM - 2 PM  12/3/2019  BIH 
Plumbing Final Insp Request  12/2/2019 4:18:47 PM  12/3/2019  10 AM - 2 PM  12/3/2019  BIH 
Mechanical Final Insp Request  12/3/2019 4:34:41 PM  12/4/2019  10 AM - 2 PM  12/4/2019  BIH 
Electrical Final Insp Request  12/3/2019 4:34:49 PM  12/4/2019  10 AM - 2 PM  12/4/2019  BIH 
Plumbing Final Insp Request  12/3/2019 4:35:08 PM  12/4/2019  10 AM - 2 PM  12/4/2019  BIH 
BLD - Misc. Inspection  12/4/2019  12/5/2019    12/5/2019  MMO 
BLD - TCO App Consideration  12/9/2019  12/10/2019  8 AM - 12 PM  12/10/2019  BIH 
BLD - TCO App Consideration  1/6/2020  1/7/2020  8 AM - 12 PM  1/7/2020  BIH 
BLD - TCO App Consideration  5/8/2020  5/11/2020  8 AM - 12 PM  5/11/2020  BIH 
Building Final Insp Request  7/2/2020  7/6/2020  12 PM - 3 PM  7/6/2020  BIH 
Electrical Final Insp Request  7/2/2020  7/6/2020  12 PM - 3 PM  7/6/2020  BIH 
Mechanical Final Insp Request  7/2/2020  7/6/2020  12 PM - 3 PM  7/6/2020  BIH 
Plumbing Final Insp Request  7/2/2020  7/6/2020  12 PM - 3 PM  7/6/2020  BIH 
Building Final Insp Request  7/6/2020  7/7/2020  12 PM - 3 PM  7/7/2020  BIH 
Electrical Final Insp Request  7/6/2020  7/7/2020  12 PM - 3 PM  7/7/2020  BIH 
Mechanical Final Insp Request  7/6/2020  7/7/2020  12 PM - 3 PM  7/7/2020  BIH 
Plumbing Final Insp Request  7/6/2020  7/7/2020  12 PM - 3 PM  7/7/2020  BIH 
Electrical Final Insp Request  7/8/2020  7/9/2020    7/9/2020  BIH 
Mechanical Final Insp Request  7/8/2020  7/9/2020    7/9/2020  BIH 
Plumbing Final Insp Request  7/8/2020  7/9/2020    7/9/2020  BIH 
Building Final Insp Request  7/8/2020  7/9/2020    7/9/2020  BIH 
BLD - TCO App Consideration  7/8/2020  7/9/2020    7/9/2020  DONE  MSM 
Mechanical Final        7/9/2020    BIH 
Plumbing Final        7/9/2020    BIH 
Electrical Final        7/9/2020    BIH 
Building Final        7/9/2020    BIH 

 